Text
.
f5
~
MN
,
/
%,
UNITED STATES
f
g' ' ,, ,
j
NUCLEAR REGULATORY COMMISSION
q' $ LL.
'
.U
- d' "
8
e
REGION 111
.
,
jggj 3,. .g
o
y
799 noosEvELT ROAD
Mk n
g
,o
GLEN ELLYN, ILUNOIS 60137
'C
k
-
g parJOEtGU
December 19, 1980
Y
y
k
Docket No. 50-282
Docket No. 50-306
Northern States Power Company
ATTN:
Mr. Dennis E. Gilberts
Vice President
Power Productio: cnd
System Operation
414 Nicollet Mall
Minneapolis, MN
55401
Gentlemen:
This refers to the inspection conducted by Messrs. C. D. Feierabend and
B. L. Burgess of this office on October 1 - November 30, 1980 of activities
at the Prairie Island Nuclear Generating Plant, Units 1 and 2, authorized
by NRC Operating License Nos. DPR-42 and DPR-60 and to the discussion of
our findings with Mr. Watzl at the conclusion of the inspection.
The enclosed copy of our inspection report identified areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
Certain other activities, set forth in the enclosed Appendix A to this
letter, appear to be a deviation from commitments which you have made in
previous correspondence with the Commission. The inspectors observed during
the inspection that you had initiated actions to complete the commitment,
therefore no response to this correspondence will be required.
In accordance with Section 2.790 of the NRC's, " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and'the enclosed
inspection report will be placed in the NRC's Public Document Room, except as
follows.
If this report contains information that you or your contractors
believe to be proprietary,'you must apply in writing to this office, within
twenty-five days of your receipt of this letter, to withhold such information
from public disclosure. The application must include a full statement of
the reasons for which the information is considered proprietary, and should
be prepared so that proprietary information identified in the application
is contained in an enclosure to the application.
.
4
810130O GQ
-
-
-
- - -
--
-
-
,
Northern States Power
-2-
December 19, 1980
Company
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
/o
R. F. Heishman, Chief
Reactor Operations and
Nuclear Support Branch
Enclosure: IE Inspection
Report No. 50-282/80-19
and No. 50-306/80-19
cc w/ enc 1:
Mr. F. P. Tierney, Jr.
Plant Manager
Re siden t Inspector RIII
Central Files
Reproduction Unit NRC 20b
Local PDR
John W. Ferman, Ph.D.
Nuclear Engineer, MPCA