___

[fo

  1. g H%g'o

'

UNITED STATES

G

8I

NUCLEAR REGULATORY COMMI5SION

y

,

7,

j

REGION 1

t

'

631 PARK AVENUE

M

0,

%,

,e,4

<

KING oF PRUSSIA, PENNSYLVANIA 19406

' , /,

~

+....

,

,o

-G

e-

,

In Reply Refer To:

NOV

3 #

~

N

~

RII: LEF

q

@^

Docket No. 50-334

U

i~

Duquesne Light Company

ATTN:

C. N. Dunn

Vice President

Operations Division

435 Sixth Avenue

Pittsburgh, FA 15219

Gentlemen:

.

Subject: Inspection 50-334/80-2G

This refers to the inspection conducted by L. E.

Fcster of the Performance

Appraisal Branch on August 18-22, 1980, at the Beaver Valley Power Station Unit

1, Shippingport, Pennsylvania of activities authorized by NRC License No. DPR-66

and to the discussions of our findings held by Mr. Foster with Mr. J. A. Werling

and others of your staff at the conclusion of the inspection.

This inspection was one of a series of appraisal inspections being conducted by

the NRC Performance Appraisal Branch concerning the control of safety-related

components.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

!

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

i

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must be

accompanied by an affadavit executed hy the owner of the information, which

l

identifies the document or part sought to be withheld, and which contains a

I

statement of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b)(4) of Section 2.790.

The information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified period,

l

Document Room.

-

the report will be placed in the Public

t

l

!

l

8101300059

.

  • -

e

~

g

.

.

Duqu5sneLightCocpany

2

NOV

3 1960

Snould you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

i

___

,s

E

VJ. Brunner, Chief

R ctor Operations and Nuclear

Support Branch

Enclosure: Office of Inspection and Enforcement Inspection

No. 50-334/80-26

,

cc w/ encl:

F. Bissert, Technical Assistant Nuclear

R. Washabaugh, QA Manager

J. Werling, Station Superintendent

G. Moore, General Superintendent, Power Stations Department

J. J. Carey, Director of Nuclear Operations

,

R. Martin, Nuclear Engineer

J. Sieber, Superintendent of Licensing and Compliance, BVPS

.