MONTHYEARML20217K4451999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Oyster Creek Nuclear Generating Station.With ML20211P6731999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Oyster Creek Nuclear Generating Station.With ML20211A7051999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Oyster Creek Nuclear Station.With ML20209G0631999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Oyster Creek Nuclear Generating Station.With ML20195E7961999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Oyster Creek Nuclear Generating Station.With ML20206N7431999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Oyster Creek Nuclear Generating Station.With ML20205P5401999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Oyster Creek Nuclear Generating Station.With ML20204C8201999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Oyster Creek Nuclear Generating Station.With ML20199E4671998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Oyster Creek Nuclear Generating Station.With ML20198D2091998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Oyster Creek Nuclear Generating Station.With ML20155J3021998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Oyster Creek Nuclear Generating Station.With ML20154L5571998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Oyster Creek Nuclear Generating Station.With ML20151V6311998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Oyster Creek Nuclear Generating Station.With ML20237B0131998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Oyster Creek Nuclear Generating Station ML20236R0511998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Oyster Creek Nuclear Generating Station ML20249B2981998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Oyster Creek Nuclear Station ML20247G0581998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Oyster Creek Nuclear Generating Station ML20216K0341998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Oyster Creek Nuclear Generating Station ML20216J0841998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Oyster Creek Nuclear Generating Station ML20203A3801998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Oyster Creek Nuclear Generation Station ML20198P1791997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Oyster Creek Nuclear Station ML20197E9131997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Oyster Creek Nuclear Station ML20199D4381997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Oyster Creek Nuclear Station ML20198J7361997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Oyster Creek Nuclear Generating Station ML20210V0181997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Oyster Creek Nuclear Generating Station ML20210L2961997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Oyster Creek Nuclear Station ML20141H2051997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Oyster Creek Nuclear Station ML20210L3081997-06-30030 June 1997 Corrected Page to MOR for June 1997 for Oyster Creek Nuclear Generating Station ML20141A5021997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Oyster Creek Nuclear Generating Station ML20141H7441997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Oyster Creek Nuclear Generating Station ML20137X8231997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Oyster Creek Nuclear Generating Station ML20137C3771997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Ocnpp ML20134P6151997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Oyster Creek Nuclear Generating Station ML20133M1751996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Oyster Creek Nuclear Generating Station ML20132D1011996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Oyster Creek Nuclear Generating Station ML20134M9761996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Oyster Creek Nuclear Generating Station ML20129B1631996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Oyster Creek Nuclear Generating Station ML20117M7561996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Oyster Creek Nuclear Generating Station ML20116M6761996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Oyster Creek Nuclear Generating Station ML20115F8561996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Oyster Creek Nuclear Generating Station ML20112J7431996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Oyster Creek Nuclear Generating Station ML20112A6891996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Oyster Creek Nuclear Generating Station ML20101R0401996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Oyster Creek Station ML20101D7701996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Ocnpp ML20100G5101996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Oyster Creek Nuclear Generating Station ML20096E8071995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Oyster Creek Nuclear Generating Station ML20099L7571995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Oyster Creek Nuclear Generating Station ML20094P8431995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Oyster Creek Nuclear Generating Station ML20093H3571995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Oyster Creek Nuclear Generating Station ML20092H7741995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Oyster Creek Nuclear Generating Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K4451999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Oyster Creek Nuclear Generating Station.With ML20211P6731999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Oyster Creek Nuclear Generating Station.With ML20211A7051999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Oyster Creek Nuclear Station.With ML20209G0631999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Oyster Creek Nuclear Generating Station.With ML20212H5491999-06-18018 June 1999 Non-proprietary Rev 4 to HI-981983, Licensing Rept for Storage Capacity Expansion of Oyster Creek Spent Fuel Pool ML20195E7961999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Oyster Creek Nuclear Generating Station.With ML20206N7431999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Oyster Creek Nuclear Generating Station.With ML20205P5401999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Oyster Creek Nuclear Generating Station.With ML20204C8201999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Oyster Creek Nuclear Generating Station.With ML20199E4671998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Oyster Creek Nuclear Generating Station.With ML20195E8321998-12-31031 December 1998 10CFR50.59(b) Rept of Changes to Oyster Creek Sys & Procedures, for Period of June 1997 to Dec 1998.With ML20198D2091998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Oyster Creek Nuclear Generating Station.With ML20195J8591998-11-12012 November 1998 Rev 11 to 1000-PLN-7200.01, Gpu Nuclear Operational QA Plan ML20195C4271998-11-0606 November 1998 Safety Evaluation Supporting Proposed Ocnpp Mod to Install Core Support Plate Wedges to Structurally Replace Lateral Resistance Provided by Rim Hold Down Bolts for One Operating Cycle ML20155J3021998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Oyster Creek Nuclear Generating Station.With ML20154R4981998-10-20020 October 1998 Core Spray Sys Insp Program - 17R ML20154L3051998-10-14014 October 1998 Safety Evaluation Accepting Licensee Request to Defer Insp of 79 Welds from One Fuel Cycle at 17R Outage ML20154Q3371998-09-30030 September 1998 Rev 8 to Oyster Creek Cycle 17,COLR ML20154L5571998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Oyster Creek Nuclear Generating Station.With ML20151V6311998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Oyster Creek Nuclear Generating Station.With ML20237D5691998-08-31031 August 1998 Rev 0 to MPR-1957, Design Submittal for Oyster Creek Core Plate Wedge Modification ML20237D5711998-08-18018 August 1998 Rev 0 to SE-000222-002, Core Plate Wedge Installation ML20237B0131998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Oyster Creek Nuclear Generating Station ML20236R0511998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Oyster Creek Nuclear Generating Station ML20249B2981998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Oyster Creek Nuclear Station ML20248F3531998-05-21021 May 1998 Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted ML20247F1891998-05-0505 May 1998 Risk Evaluation of Post-LOCA Containment Overpressure Request ML20247G0581998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Oyster Creek Nuclear Generating Station ML20216K0341998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Oyster Creek Nuclear Generating Station ML20151Y4651998-03-31031 March 1998 Non-proprietary Version of Rev 1 to GENE-E21-00143, ECCS Suction Strainer Hydraulic Sizing Rept ML20217A4631998-03-23023 March 1998 Safety Evaluation Accepting Use of Three Heats/Lots of Hot Rolled XM-19 Matl in Core Shroud Repair Assemblies Re Licenses DPR-16 & DPR-59,respectively ML20212E2291998-03-0404 March 1998 Rev 11 to 1000-PLN-7200,01, Gpu Nuclear Operational QAP, Consisting of Revised Pages & Pages for Which Pagination Affected ML20216J0841998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Oyster Creek Nuclear Generating Station ML20203B2781998-02-16016 February 1998 10CFR50.59(b) Rept of Changes to Oyster Creek Systems & Procedures ML20203A3801998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Oyster Creek Nuclear Generation Station ML20198P1791997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Oyster Creek Nuclear Station ML20217C7591997-12-31031 December 1997 1997 Annual Environmental Operating Rept for Oyster Creek Nuclear Generating Station ML20197E9131997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Oyster Creek Nuclear Station ML20199E4561997-11-13013 November 1997 Safety Evaluation Accepting Ampacity Derating Analysis in Response to NRC RAI Re GL-92-08, Thermo-Lag 330-1 Fire Barriers, for Plant ML20199D4381997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Oyster Creek Nuclear Station ML20202E8511997-10-21021 October 1997 Rev 0 to Scenario 47, Gpu Nuclear Oyster Creek Nuclear Generating Station Emergency Preparedness (Nrc/Fema Evaluated) 1997 Biennial Exercise. Pages 49 & 59 of Incoming Submittal Were Not Included ML20211M9481997-10-0303 October 1997 Supplemental Part 21 Rept Re Condition Effected Emergency Svc Water Pumps Supplied by Bw/Ip Intl Inc to Gpu Nuclear, Oyster Creek Nuclear Generation Station.No Other Nuclear Generating Stations Effected by Notification ML20198J7361997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Oyster Creek Nuclear Generating Station ML20211B7461997-09-24024 September 1997 Part 21 Rept Re Failure of Emergency Service Water Pump Due to Threaded Flange Attaching Column to Top Series Case Failure.Caused by Dissimilar Metals.Pumps in High Ion Svc Will Be Upgraded to 316 Stainless Steel Matl ML20210V0181997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Oyster Creek Nuclear Generating Station ML20210L2961997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Oyster Creek Nuclear Station ML20149F9961997-07-18018 July 1997 Safety Evaluation Re Gpu Nuclear Operational Quality Assurance Plan,Rev 10 for Three Mile Island Nuclear Generating Station,Unit 1 & Oyster Creek Nuclear Generating Station ML20196H0111997-07-11011 July 1997 Special Rept 97-001:on 970620,removed High Range Radioactive Noble Gas Effluent Monitor (Stack Ragems) from Service to Allow Secondary Calibr IAW Master Surveillance Schedule. Completed Calibr on 970628 & Returned Stack Ragems to Svc ML20210L3081997-06-30030 June 1997 Corrected Page to MOR for June 1997 for Oyster Creek Nuclear Generating Station ML20141H2051997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Oyster Creek Nuclear Station 1999-09-30
[Table view] |
Text
rv *
/
OPERATIC 23S St2fGRY l
DameER 1980 At the _arinn47 h of the ut.w. Ling period, t6e Oyster Creek Nuclear Generating Statien was rem 45 to power M11e5r4M repairs to the Feedwater Systen. Icad j was maintained at approximately 99% rapac4ty (643 We) through r*--he 12 until limited by cx:ndensata d=4nar=14 er differential pressure. 'Ita ultimate cause of the differential pressure limitation was the irab4if ty of the New Radwaste l Systen to m-:a== liquid and solid waste as designed.
l narw+ar 12, load was rMv ad approximately 250 se to rerove "C" Feedwater Cn l Beater String frcm service for =4*anance on the IC3 heater relief valve. "C" string was back in service after 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br /> and load was ircreased to condersate d=4nar=14'ar differential pressure limits at 637 We on racamhal 14. "A" CRD nar=ahar puup was out of service for electrical and --han4e=1 ~4n+ananca frem 18 thi=+ n=--har 24. Frcun narwhar 19 through the end of the reporting period, load was steadily A - 4M due to emdensata d=4naralirer differential pressure limitations. Cn naramhan 31, the SCRAM Dung volune Continucus w:nitoring Systen Funcrienal Testing as directed by I E Bulletin 81-17 Sqplanent 4 was satisfactorily c:smpletai. C:: replete evaluation of the test results is not fully er mluded.
ters were 9 Reportable Cccurrences and 1 Ncn-Routine Divi. mtal Cperatig Report idenei#4ad durW C+:uaz:
R.O. 480-55 was 4 dan +4'4ed en nar=haz 3 when Core Spray High Drywell Pressum SwiP+en RV46B, C, and D were fcund to have settims less ccnservative than Tae-kn4 r=1 S W #4r= tion requirements.
R.O. 980-56 was 4 dan *4 4'4 ed en naewnbar 4 when Steam Line High Flow Sensors RE22 C and G were found to have setti:x;s less consrrvative tPan Tech Spec requirements.
R.O. 480-57 was iden+4 *4 ed cn C+:2-r 5 when Coe=4nmant Spray High Drywell Pressure Sensors 1P15A,-B, C and D were found to have settims less conservative than Tech Spec requirements.
R.O.980-58 was identified en nar==hal 11 when 2 annkham en Core Spray !
piping were found to be izrpar=hle. l R.O. 480-59 occurred en n==+=n- 15 when monthly tests on the Diesel Generator, Staticn and Fire niaaal Batteries were not p=a.h.=1.
R.O. 480-60 was 4da*4 84 ed on C+:2 -l 11 when Isolaticri Condenser candannate Retz:rn Line Break Sensor was found to have a setting less conservative than Tech Spec requia. Li.
i
- R.O. 480-61 was iden*4 #4 ari on December 12 when Core Spray %Eha_rs 19/11, 19/12 and 19/13 failed functional testing in u urassion.
4 1 R.O. 480-62 occurred on Decenber 18 when "A" CRD Pung was irx:perable.
I I
R.O. 480-63 was 4da*4 *4ad on Decenber 17 when Reactor Triple Icw Water !
Imvel Sensor RE18A was found to have a setting less conservative than Tech Spec requirenents.
NRECR 980-13 ocentred on C+:2 +r 6 when 2 Diluticn Puaps were shut off due to ext:snely 1cw water level in the intake canal.
4
- *" * "" "= -w e= -e . , . . _ . . ,
-- 810123.0
o* '
r\.
qq 'g
~
c Ti o
,, LJ - ,a e .1 3
- AVERAGE DAILY POWER LEVEL -
DOCKET ?...... 50-219
~
UNIT.......... O.C. ti REPORT DATE... January 14. 1981 COMPILED BY... J.B. SKLAR TELEPHONE..... 609-693-6013 MONTH December 1980 DAY MW DAY MW
- 1. 441.- 17. 60' 8.
- 2. 479. 18. 605.
3.- 589. 19. 601.
- 4. 614. '20. 597.
- 5. 634. 21. 594.
- 6. 422. 22. 588.
- 7. 618. 23. 588.
- 8. 423. 24. 583.
- 9. 623.. 25. 583. '
- 10. 620. 26. 580.
- 11. 618. 27. 581.
- 12. 595. 28. 578.
- 13. 448. 29. 576.
- 14. 585. 30. 576.
t <
i i 15. 605. 31. 574.
- 16. 605.
e t
9 e
i I
~ -a..-w.w.. .%% w . - - - - -e - *-
.' . . . . . . . . < . . j
, , OPERATING DATA REPORT u
'o m rP D "D M' I OPERATING STATUS M J a UNIT NAME.. 0YSTER CREEV DOCKET NUMBER.. 50-219 UTILITY DATA PREPARED BY...J.B. SKLAR 609-o?3-6013 REPORTING PERIOD... Decernber 1980-I' LICENSED THERMAL POWER (MWT).. 1930 NAMEPLATE RATING (GROSS MWE).. 650 "
DESIGN ELECTRICAL RATING (NET MWE).. 650
~
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE).. 650 MAXIMUN DEPENDABLE CAPACITY (NET MWE).. 620 .
!F CHANGES OCCUR IN CAPACITY RATING SINCE LAST REPORT. GIVE REASON...
NONE POWER LEVEL TO WH.ICH RESTRICTED, IF ANY(NET MWE)... 650' REASON FOR RESTRICTION, IF ANY... -
CONDENSA~E DEMINERALIZER DIFFERENTIAL PRESSURE MONTi4 YEAR CUMULATIVE i
HOURS IN PERIOD 744.0 8784.0 96648.0
{* HOURS RX CRITICAL 744.0 3791.3 72430.6
.s j RX RESERVE SHUTDOWN HRS. 0.0 0.0 468.2 HRS. GEN ON LINE '744.0 3663.5 70Y68.?
UT RESERVE SHUTDCb:N HRI 0.0 0.0 0.0 GROSS T.HERMAL ENERGY 1325000.0 6267321.2 120146480.5 GROSS ELEC ENERGY 451970.0 2045930.0 40929245.0 NET ELEC ENERGY 435087.0 1957645.0 39438658.0
{ UT SERVICE FACTOR 100.0 41 .7 73.4 i
i UT AVAILABILITY FACTOR 100.0 4.1. 7 73.4 I
UT CAPACITY FACTOR MDC .94.3 35.9 67.3 l UT CAPACITY FACTOR DER 90.0 34.3 62.S i
FORCED OUTAGE FACTOR 0.0 10.0 6.6
, THE NEXT SCHEDULED OUTAGE IS TO BEGIN ON SPRING 1981.
~ '
]
. -
.q. 4Jiiia6
DOCKET No.
50-219 '!
UNIT SilU1 DOWNS AND POWER REDUC 110NS UNIT NAME O.C. Il !
DATE .Im - rv 14. 1981 l' t
COMPLETED gy J. B. Sklar REroRTMONT1g Decaser 1980 TEl,ErfIONE 609-693-6013 i
"ot.
6 r
" . g
-- E- * '" U Licensee Et 4 Cause & Correct'Ive No. D,etc F
[ jh oE E
}M jge Event Repint
<a t s g
, Action to.
Prevent Recurrence ,
8 12-2-80 F 0.0 B 5 N/A ZZ ZZZZZ Reduction to investigate Condensate Syston vibration. Cause was attributed to problems with the Hot-well Sucker / tamper Station corrected +
by adjustments to the station.
9 12-12-80 F 0.0 D 5 N/A ZZ ZZZZZ Heplaced IC3 Ileater Helief Valve in the "C" Feedwater llenter String.
l I
.I I 2 3 4 F: Finced Reasim: Methat: Exhibit G Instructhms 5: ScheduleJ A-Equipment Failure (Explain) 1-Manual for riepsestitm of Deta , j B-Maintenance of Test 2-Manual Scram. Entry $heet Ioe 1.icensee 4 c.RcIncling 3 Automatic Sessm. Event RepmI(tER) File
- INUREG-D-Regulatoey Restricthm 4 Other (Explain) 0161)
E4)perator Tsaining & IJcense Examinathm F Administrative $
G4)perational Error (Emplain) Exhibit I - Seine Source 19/77) Il-Other (Emplain) j I
t
a . _ _ _ __..___
l l
i i
DECEM3ER SLMMIN OF OASL PECimHICAL PRINID4ANCE r I Cuivasesit or Systm Malfunction Corrective Action _ .
J l
CRD Systen 'D' CRD Filter is fouled. Replaced filter elment. ;
CRD Systm 'A' CHD filter is fouled. Replaced filter elenent.
i' I
CRD Systen Icak through scram outlet valve (V-127) Replaced gaskets and seat rings.
for acusm11ator 34-31.
Valves V-15-25 & V-15-26 leak.' Replace packing.
CRD Systen CRD Systen 'A' CRD filter is fouled. Replace filter elenent. 1 CIO Systen CHD filter 'B' is fouled. Also valve Changed filter elenent and j V-15-26 leaks. tightened packing gland on ;
the valve. 4 i
CRD Systen valve V-111 associated with accumulator Replaced the valve with a new i 22-03 leaks. valve. ;
CRD Systen CFD Filter 'A' is fouled.
~
- Replaced filter elenent. 4 i
valve V-111 associated with acctmulator Replaced the valve with a new :
CRD Systen valve.
34-27 leaks. ,
l
'A' CHD ptmp bound aid notor overleated. Replaced tie ptmp rotating elenent, CRD Systen bearings, and seals.
CRD Systen Acctmulator 14-35, V-111 valve leaks Replaced with a rebuilt valve.
past seat. '
. i t
l 4
i 8
l .
I t
DECDHR SLMWN OF ONIL EIECTRIGL MMNIENANCE ,
l Equipnent M11 function Corrective Action '
'1brus Oxygen Sanple Ptmp Not ptmping }
Deplaced vanes in punp. .
. Main Steam Drain Valve V-1-lli Breaker tripping Heplaced btrken torque switdt ~
Mechanical maintenance required on valve'medustism. !
x Isolation Condenser Vent Switch Icose set screw on switch Tightened set screw.
V-14-5 and V-14-20 (10F) harxile. ;
CRD Pupp Motor A Shortal out Ikplaced notor.
Condensate Transfer Ptmp fl No off indication (green Repairal loose wire on rear of panel 5F. '
light) on panel SF. '
i L
. I I,
i
i DECEMER SLMMIN OF OASL INSTRLMNT N. ,
l Equipnent Malfunction Corrective Action ],
CRD 34-31 Ibsition 00 shows no green- After trouble shooting and stroking green badtground indication was satisfpcbory.
L CRD 02-27 tb position Indication teaky scran valve discxyvered resulting in the disconnaction of accunulator - job
'crder issued to medi. maint. Indication , I is correct at 00 and green-green. ,
i Reactor Protection Syston - Check for leaks at tubing dianged defectiv hittingsandpressure IE 23 Switches fittings decked at 1000 psi. ;
Area Radiation Monitor - Reactor Building Erroneous reading Ibadjusted zero offset per tedmical manual. l l
Equipnent Drain Tank Ibczn M N - Cleanup Punp Area Doesn't alarm at desired Readjusted alann per standing orders and } ,
setpoint and no r6r.ase to replaced high alann light bulb indicator.
a high alarm trip check. 1 6
CRD Iow Air Pressure Switch Setpoint change per HIC Reset switdt to trip at 55 psi ca decreasirg l l; pressure. i Drywell/1brus Oxygen Recorder Inoperative . Retightened pointer on recorder string. l I
Standby Gas Treatment Syston II Filter differential
- pressure Replaced 1-10, 11, 12 AP gages with i indicators defective. 0-5" magnehelle gages. l
'l .
Isolation Condensers Temperature Alarm Intermittent alarm Jtmpered alarm per procedure 108. l Shutdown Cooling Trip Alann Alarming for no reason Cleaned dirty contacts on annunciator board. .
Fuel Ibol Invel Alarm Intermittent alarm Recallbrated instrunstation per nenufacturer's bulletin.
I. l, t
i
~
I l
DECENER StMRIN OF OFGL INSTRMNr MMNIDmHCE - Page 2 ,
! Iljulpnent Malfunction Corrective Action IIM Channel 15 Intermittent failures Itplaced cxxinector under vessel ,
upscale. -
APIN Channel 7 Power Supply Defective Itplaced and performed surveillance.
i Aucynented Off Gas Instrumesit Alarming Itplaced alarm asseibly and adjusted i Failure Alarm power stqply. ,
AOG Radiation Monitor IIL III trip point out of Calibrated monitor, i calibration. ,
AIM - Reactor Building Equipnent Trip point out of -
Calibrated monitor. .
Drain Tank Rocm calibration l '
l Off Gas Line Flow Recorder Not driving properly Tightened slide wire, repaired pen !
mechanima, calibrated. j i
, e e
t
. l 1
i o e 9
I i
l . ,
l
3 ,
, mm 9 T' Oyster Creek Station #1 '
, ww e SL C Occket No. 50-219 RE UE!. LNG INFORMATION -
Name of .:acility: Cyster Creek Station #1 Scheduled date for next refueling shutdown: N m L+r 28, 1981 Scheduled date for restart follcwing refueling: May 31, 1982 Will refueling or resumption of operation thereafter require a Technical Specification change or other . license amendment?
No Tach"4"al Spae4 44ca*4mn change relative to the rafnal4g is an*4e4natad.
Scheduled date(s) for sucmit. ting procosed licensing action and supporting in fo rmation:
No sut:r.d.ttals are sc.Miad.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
- 1) FM Electric fuel adlies - fuel Mir71 & gm.Em- analysis methods have been e v d by the NIC. New operating yu - a res, if necessary, will be subnitted at a later date.
- 2) Exxon Fuel Assemblies - No major changes have been made nor are there any an*4e4n=ted.
The number of fuel assembiles (a) in the core -
560 (b) in the spent fuel storage pool - 781 I
The present licensed spent fuel pool storage capacity and the size of any Increase. in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
- Present: 1,800 Planned: 2,600 The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
The Spring 1987 Outage.