05000277/LER-1981-001-04, /04T-0:on 801019,max Daily Chlorination Time Limit Exceeded by 30 Minutes.Caused by Personnel Error. Instructions Posted at Chlorination Control Panel,Procedure Clarified & Individual Reinstructed

From kanterella
(Redirected from ML19341A265)
Jump to navigation Jump to search
/04T-0:on 801019,max Daily Chlorination Time Limit Exceeded by 30 Minutes.Caused by Personnel Error. Instructions Posted at Chlorination Control Panel,Procedure Clarified & Individual Reinstructed
ML19341A265
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 01/12/1981
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19341A263 List:
References
LER-81-001-04T, LER-81-1-4T, NUDOCS 8101220496
Download: ML19341A265 (1)


LER-1981-001, /04T-0:on 801019,max Daily Chlorination Time Limit Exceeded by 30 Minutes.Caused by Personnel Error. Instructions Posted at Chlorination Control Panel,Procedure Clarified & Individual Reinstructed
Event date:
Report date:
2771981001R04 - NRC Website

text

.

4.d,I JbG 1J. k NUGL E AH ett GUL A I Oh (. CtJMt.it:/;10N

  • 2II LICENSEE EVENT REPORT ReporC No. 2-81-01/hT 0

Bpic 2 W

CONTROL BLOCK: l l

l l

l l

(PLEASE Pa!NT 03 TYPE ALL REQUIRED INFORMATION) e o lil Ir l A lP lB lS l 2 l@tt 0l 0l 10 l 0l 0l 0lOl-l0l 0l@ 4l1l1l1lI!@l l

l@

14 UCENSE NUMSER 26 26 UCENSE TYPg JO

$7 CAT 68 8

8 9 LICENSEE Co0E CON'T oIii "0% LLJ@l 015 1 0l -l 0l2 l7 l7 i@l 1 l 011 l 9 I 810 l@l 0 l 1 l 1 l 2 l 811 l@

S 30

$1 DOCKET NUM95R 68 tis s /ENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROeA8LE CONSEQUENCES h OI2l l Iharing routine chlorination of the Unit 2 and 3 circulating systems on I

o i3i l October 19, 1980,' the marimum daily chlorination time limit of two hours l

4 l o I.: ! l as specified by environmental Tech Spec 2.2.1 was exceeded by 30 I

oisl l minutes. This was discovered on January 2, 1981 during review of a report l

t o is l l containing the chlorinatica data. Review of chlorine residuals recorded l

o I7l l during the event disclosed '. hat there *.,as no significant increase l

1o Ia i l in chlorine residuals dis.: barged fzom the circulating water system.

I 7

s9

  • EE "SE susCEE sueEoE ss$

C COueoNENT CooE (0l91 lHlFlh W @ W @ lZIZlZlZIZlZl@ W @ W @

7 8

9 10 51 12 13 le 9

20 SEQUENTIAL OCCURRENCE REPORT HEVISION LER EVENT YEAR REPORT NO.

CoOE TYPE NO.

h,ag/Ro l 81 il

(---J l010lil L/,_]

l Ol hl lTl l-l [0_j 21 22 23 24 26 27 28 29 30 38 32 K N AC ON ON NT ME HOURS s

eTT PCH u.

L MANuPACTunEH [H_j@l Z l@

lZl@

[Z_J@

l0l01010l

(, YJ @

[N_J@

W@

l Z l 919 l9 l@

JJ 34 JS 34 37 40 41 42 43 44 47 CAUSE oESCRIPTION AND CORNECTIVE ACTIONS 27 liioll Excess chlorination time was due to personnel error. Although the I

'Iiiil I chlorination procedure specifies==v4==

total allowable chlorination l

l 12 I l time, each condenser waterbox section was chlorinated 10 minutes more l

lilal l than normal. Instructions have been nosted at chlorination control l

Iii4i i panel, trocedure is being clarified, and individual was reinstructed.

l 7

8 9 80 SYA

% power OTHER STATUS Das O Y

OlsCOVERY DESCRIPTION i I L I [E,,J@ l 1l Ol 0l@l Unit 3 - 8h%

l lBl@l Report Review l

A TtVITY CO TENT KELEASED OF RELEASE AMCUNT oP ACTIVITY LOCATION OF RELEASE l

la I LZ_] @ LZJOl N/A l

l N/A l

PERsONuE1 ExPosuAEs NUM8ER TYPE

DESCRIPTION

i l 7 l l 010101@l Z I@l N/A l

.E. O~NEl'.~,u'4 Es NUMSER

DESCRIPTION

li is t 1010 l 01@l N/A l

r el 9 18 12 80 L

OPOiOAMAG TO PACILITY i i 1 > I l Z l@l N/A l

7 8

S, 10

/

16 12 I o f LN @DE CRIPTIONN/A

.v [.

l l l l l l l l l l l l l l ;;

ISSUE j

l i

8 9

.10

/ W

  • 7 '

G5 69 40 &

M./J. Cooney

/

..(215) 841-5020 0