L
a ucq
o
UNITED STATES
O
3 dj S 7/( g
!'
NUCLEAR REGULATORY COMMISSION
U
o
- [7'v//; *$
REGION 11
101 MARIETTA ST., N.W., SUITE 3100
f'#
og
j
ATLANTA, GEORGIA 30303
.....
1980
In Reply Refer To:
p25
RII:JLC
50-566/80-17
50-567/80-17
Tennessee Valley Authority
ATTN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
This refers to the inspection conducted by J. L. Coley of this office on
October 15-17, 1980, of activities authorized by NRC Construction Permit
CPPR-172 and CPPR-173 for the Yellow Creek facility, and to the discussion of
our findings held with W. Andrews at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
We have examined actions you have taken with regard to previously reported
unresolved items. The statu:: of these items is discussed in the enclosed report.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. This item and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section
2.201 of the MRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-
tions.
Section 2.201 requires you to submit to this office, within 20 days of
your receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2)
corrective steps which will be taken to avoid further noncompliance; and (3) the
date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is propietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
gold OED
.
.
._.
..
.
f
NOV 2 51980
Tennessee Valley Authority
-2-
Should you have any questions.concerning this letter, we will be glad to discuss
them with you.
Sincerely,
$ ]sY r
i .
s
C. E. Murp y', Ch
Reactor Construction and Engineering
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-566/80-17
50-567/80-17
cc w/ encl:
J. F. Cox, Supervisor, Nuclear
Licensing Section
M. M. Price, Project Manager
M. A. McBurnett, Project Engineer
H. N. Culver, Chief, Nuclear
Safety Review Staff