ML19340F050
| ML19340F050 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 11/06/1980 |
| From: | Counsil W CONNECTICUT YANKEE ATOMIC POWER CO. |
| To: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML19340F048 | List: |
| References | |
| A01173, A1173, NUDOCS 8101160580 | |
| Download: ML19340F050 (2) | |
Text
J.
O CONNECTICUT YANKEE ATOMIC POWER COMPANY BERLIN. CO N N ECTIC U T P.O. BOX 270 H ARTFORD. CONNECTICUT 06101 T at a.=e m a 203-686 8911 November 6, 1980 Docket No. 50-213 AOll73 Mr. Eldon J. Brunner, Chief Reactor Operations and Nuclear Support Branch U. S. Nuclear Regulatory Commission Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406
Reference:
(1) Letter, E. J. Brunner to W. G. Counsil, dated September 24, 1980 Inspection 50-213/80-15 (2) Letter, W. G. Counsil to E. J. Brunner, dated October 16, 1980 Docket No. 50-213/A0ll73 Gntlemen:
Haddam Neck Plant Response to Report of Inspection 50-213/80-15 This correspondence is in response to a telephone conversation between Mr. Lee Bettenhousen of your staff and Connecticut Yankee Training l
Supervisor, Stanley Fleming, concerning the response in reference (2) to l
the Notice of Violation as described in reference (1).
Further clarification of our response to Deficiency A and B is being provided.
Deficiency A As stated in the original response a revised program has been submitted to the Operator Licensing Branch removing the numerical limit on the number of exemptions to Operator Requalification requirements.
l In the interim the number of exemptions is being limited to two.
Based on this, Connecticut Yankee is now in full compliance with the requalification requirements.
Tr3 o u o0580
_ - =
A s,
_2 Deficiency B As state' in our response, the review of Emergency Operating Procedures (EOP's) e now being accomplished by the self study tec1nique. The return to.his technique will assure that all E0P's will be reviewed by all licensed personnel by June 1, 1981.
Very truly yours, j
CONNECTICUT YANKEE ATOMIC POWER COMPANY 1
]
/
fh0Y5 s
1 W. G. Counsil Senior Vice President 1
l f
L 1
3 l
l 1
4 r-y 7
-