Other: 05000346/LER-1980-090-03, /03L-1:on 801205,setpoints for Borated Water Storage Tank Low Level Bistable BA312 & Containment Pressure Bistable BA309 Found Out of Tolerance.Caused by Component Failure.Bistables Recalibr, ML19340E991, ML19341B813, ML20002C776, ML20010J123, ML20069E493, ML20141N821, ML20265E231, ML20265E237, ML20265E241, ML20265E246, ML20265E251
|
MONTHYEARML20002C7761980-12-24024 December 1980 Informs That Engineered Safety Features Actuation Sys Does Not Conform to IEEE Std 279.1971 & Constitutes Potential Failure Mode.Recommends Short Term Corrective Actions Project stage: Other 05000346/LER-1980-090-03, /03L-1:on 801205,setpoints for Borated Water Storage Tank Low Level Bistable BA312 & Containment Pressure Bistable BA309 Found Out of Tolerance.Caused by Component Failure.Bistables Recalibr1981-01-0202 January 1981 /03L-1:on 801205,setpoints for Borated Water Storage Tank Low Level Bistable BA312 & Containment Pressure Bistable BA309 Found Out of Tolerance.Caused by Component Failure.Bistables Recalibr Project stage: Other ML19340E9911981-01-0909 January 1981 Forwards marked-up Electrical Drawings as Update to 810105 Request to Deautomate Incident Level 5 of Safety Features Actuation Sys.Procedure Mod Details,License Amend Request & Safety Evaluation Will Follow.W/O Encl Project stage: Other ML20002D1341981-01-15015 January 1981 Proposed Tech Specs Sections 3 & 4,to Permit Deautomation of Valve Shifts Caused by Incident Level 5 of Safety Features Actuation Sys.Draft Emergency & Sys Operating Procedures & Functional Description Encl Project stage: Draft Other ML20002D1291981-01-15015 January 1981 Application to Amend License NPF-3,changing Tech Specs to Permit Deautomation of Valve Shifts Caused by Incident Level 5 of Safety Features Actuation Sys Project stage: Request 05000346/LER-1980-090, Forwards LER 80-090/03L-1 W/Supplemental Info Sheets1981-02-13013 February 1981 Forwards LER 80-090/03L-1 W/Supplemental Info Sheets Project stage: Supplement ML19341B8111981-02-24024 February 1981 Application for Amend to License NPF-3 Changing Tech Spec Section 4.5.2.d.2 & Tables 3.3-3,3.3-5 & 4-3.2 Project stage: Request ML19341B8051981-02-24024 February 1981 Forwards Application to Amend License NPF-3 Changing Tech Specs to Provide Consistency in Terminology W/Plant Design & to Ensure Adequate Surveillance Requirements Project stage: Request ML19341B8131981-02-24024 February 1981 Revised Tech Spec Section 4.5.2.d.2 & Tables 3.3-3,3.3-5 & 4.3-2 Changing Surveillance Requirements Per Amend 36 to License NPF-3 Project stage: Other ML20010J1231981-09-15015 September 1981 Forwards Response to NRC Re 801205 Inadvertent Safety Features Actuation Sys Actuation Project stage: Other ML20069E4931983-03-11011 March 1983 Forwards Response to Re Safety Features Actuation Sys Shared Power Supply Returns.Permanent Grounding of Power Supply Commons to Instrument Ground Will Be Provided to Resolve Channel Independence Issue Project stage: Other ML20265E2411985-11-0101 November 1985 Schematic Diagram:Davis Besse Safety Features Actuation System. Sheet 3 of 5.Drawing Consists of Four Aperture Cards Project stage: Other ML20265E2371985-11-0101 November 1985 Schematic Diagram:Davis Besse Safety Features Actuation System. Sheet 1 of 5.Drawing Consists of Three Aperture Cards Project stage: Other ML20265E2311985-11-0101 November 1985 Schematic Diagram:Davis Besse Safety Features Actuation System. Sheet 2 of 5.Drawing Consists of Four Aperture Cards Project stage: Other ML20265E2461985-11-0101 November 1985 Schematic Diagram:Davis Besse Safety Features Actuation System. Sheet 4 of 5.Drawing Consists of Three Aperture Cards Project stage: Other ML20265E2511985-11-0101 November 1985 Schematic Diagram:Davis-Besse Safety Features Actuation System. Sheet 5 of 5.Drawing Consists of Five Aperture Cards Project stage: Other ML20138Q5501985-12-17017 December 1985 Summary of 851126 Meeting W/Util,Beta & Consolidated Controls Corp in Bethesda,Md Re Proposed Changes to Safety Features Actuation Sys.Viewgraphs & List of Attendees Encl Project stage: Meeting ML20141N8211986-03-11011 March 1986 Confirms 860307 Submittal of Drawings 7749-E-30-5-6, Analog Module Assembly & 7749-E-30-19-7, Bistable 2 & Forwards Addl Copies,Per NRC Response to Re Safety Features Actuation Sys Project stage: Other ML20203N7921986-04-17017 April 1986 Forwards Safety Evaluation Accepting Proposed Mods to Safety Features Actuation Sys as Result of 801205 Actuation, Pending Successful Completion of post-mod Tests Project stage: Approval ML20203N9141986-04-17017 April 1986 Safety Evaluation Accepting Proposed Mods to Safety Actuation Sys Re Shared Power Supply Returns as Result of 801205 Actuation Project stage: Approval 1981-02-24
[Table View] |
Text
'
,s M3LEDO
%ss EDISON Docket No. 50-346 A cs uo p c a mse License No. NPF-3 VC 7 '
1419i259-5221 Serial No. 676
'a January 9, 1981 Director of Nuclear Reactor Regulation Attention:
Mr. Robert W.
Reid, Chief Operating Reactors Branch No. 4 Division of Licensing United States Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. Reid:
On January 5, 1981 Toledo Edison submitted (letter Serial No. 675) a package to support de-automation of Incident Level 5 of the Safety Features Actuation System (SFAS) at the Davis-Bcsse Nuclear Power Station, Unit 1 (DB-1).
Also on that day members of my staff met with you and your staff in Bethesda, Maryland to discuss this proposal for manual action to provide appropriate long term post-loss of coolant accident (LOCA) core cooling.
Several discussions have transpired since that time with your staff. As a result we have altered the proposed modification compared to the one presented on January 5, 1981. This letter transmits the electrical drawings marked up to describe the current proposed electrical changes.
Specifically, the proposed modification retains the SFAS Incident Level 5 to provide a permissive function for operator action. D2 tails of proposed procedure modifications, as well as the request for a license amendment and safety evaluation, will be revised from our January 5, 1981 submittal and will be transmitted when completed.
1 Very truly yours, WW,= - ; ^_
RPC:TJM: sic Attachments g/
cc:
DB-1 NRC Resident Inspector S
/ /
THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43652 1
810118 046l p
1
Dockot Ns. 50-346 License No. NPF-3 Serial No. 676 January 9, 1981 List of Attachments 1.
Elementary E52B, Sh, 19A, B, C As-is 2.
Elementary E52B Sh. 19A, B, C As proposed 3.
E16 Sh. 1 4.
E30B Sh. 7, 8 4
1 1
i
Docket No. 50-346 License No. NPF-3 Serial No. 676 January 9, 1981 LEGEND g
I Device / Symbol Description i
l M
Motor Operated Valve (MOV) as shown in title block of elementary I
l MA Other MOV, (on sheet 19A it is sump valve. On sheet 19B it is BWST valve).
N Local Control Station B
Motor Control Center E
Junction termination box near valve C
Main Control Board CD Disconnect Switch Cabinet (the function of this switch is to disconnect controls from the main control room. This is for use when control room has to be vacated).
DS Disconnect Switch Contact (see above).
SA1, 2, 3, 4 Safety Feature Actuation System (SFAS) Cabinet CH1, 2, 3, 4.
f:[, f: [
Handswitch on Main Control Board j
j Open Close j((,33,,j((,j((
MOV limit switches (See E30B Sh 8 for operation) ac be ao bo KA, KB SFAS Level 2 output relays, contact shown in
" Relay De-energized" position, i.e. Level 2 actuated position.
KC, KD SFAS Level 5 output relays. Contacts shown in
" Relay De-energized" position, i.e. Level 5 actuated position.
TR, TR1, LL, CL1 Wire Numbers
- -