Directors Decision Under 10CFR2.206,denying 791104 & 800106 Petitions for Order to Show Cause Why OL Should Not Be Suspended
ML19340E685
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 12/18/1980
From: Harold Denton
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19340E681 List:
References
NUDOCS 8101150390
Download: ML19340E685 (14)


Text

DD UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION Harold R. Denton, Director In the Matter of CONSUMERS POWER COMPANY

)

Docket No. 50-155 (Big Rock Point Plant)

)

(10 C.F.R. 2.206)

DIRECTOR'S DECISION UNDER 10 C.F.R. 2.206 By petitions dated November 4, 1979, and January 6, 1980, Ms. JoAnn Bier and Ms. Shirley J. Johns requested that the Nuclear Regulatory Commission's (NRC or the Commission) Director of Nuclear Reactor Regulation issue an order to Consumers Power Company (the licensee) to delay startup of the Big Rock Point Plant pending resolution of eight items considered by them to be safety issues. Six of the seven issues identified in the November 4,1979 request were repeated, with clarifications, in the request of January 6, 1980. An eighth issue was added in the January 6, 1980 submittal. Notice of receipt of the November 4,'1979 petition was published in the Federal Register on December 11, 1979 (44 FR 71489).

The petitions were not received by the Commission prior to restart of the Big Rock Plar*..

Consequently, the petitions have been treated as requests for an order to show cause why Facility Operating License No. DPR-6 for the Big Rock l

Point Plant should not be suspended pending resolution of the issues raised.

A preliminary safety assessment of the issues raised in the petitions was issued on March 5, 1980. Based on that assessment I concluded that sufficient assurance i

of safety existed to permit the Big Rock facility to continue operating pending final di position of the issues raised in the petitions.

Evaluation of the issues raised in the petitions has now been completed. Based I

on analysis of each of the issues raised which is set forth below, I have B102250

determined that the operating license for the Big Rock facility should not be suspended. Tne analyses for Items 2, 3, 5, and 6 of the November 4, 1979 petition and Item 4 of the January 6,1980 petition are unchanged from those contained in the March 5, 1980 Safety Assessment.

DISCU5: ION _

Issue:

"1.

We demand that our school syster have workable, safe evacuation plans for our children and that all private citizent be informed of appropriate individual evacuation actions."

Response

The Big Rock Point Emergency Plan currently approved by the NRC requires notification of a number of government organizations including the local sheriffs, Michigan State Police and the Michigan State Departmer.t of Health in the event of a serious emergency. Local and State officials would be responsible for notification of local school systems and evacuation, if needed.

New emergency planning regulations were published in the Federal Register on August 19, 1980 (45 FR 55402).

These new regulations (copy attached) became effective on November 3,1980 and are generally to be implemented by April 1,1981 by licensees of operating plants.

Section II A, B, and C of the revised Appendix E states:

, "As a minimum, the following items shall be described:

A.

Onsite and offsite organizations for coping with emergencies and the means for notification, in the event of an emergency, of persons assigned to the emergency organi-zations.

B.

Contacts and arrangements made and documented with local, State, and Federal governmental agencies with responsibility for coping with emergencies, including identification of the principal agencies.

C., Protective measures to be taken within the site boundary and within each EPZ to protect health and safety in the event of an accident; procedures by which these measures are to be carried out (e.g., in the case of an evacuation, who authorizes the evacuation, how the public is to be notified and instructed, how the evacuation is to be carried out); and the expected response of offsite agencies in the event of an emergency."

The Big Rock Point Plant's Emergency Plan is being evaluated against these requirements.

On ~ September 5,1980, we requested Consumers Power Company to begin implementation of their June 9,1930 version of the Big Rock Point Emergency Plan, although we have not yet completed our review.

This request was based on our finding that this version provides an improvement over the previous plan, affords a greater margin for protection of public health and safety, and does not decrease the effectiveness of emergency preparedness.. Consumers Power Company has recently informed us that they expect to implement the June 9, 1000 icrsion of the Emergency Plan by December 31, 1980.

Based on:

(1) the existence of an approved Emergency Plan which conferms to our current regulations, and (2) the results so far of our review of the draft revision of the plan, we have not identified any deficiencies in emergency planning which are so significant as to require suspension of the operating license.

Issue: "2.

We demand accountability for all diffuser pieces, which if left within the reactor vessel could interfere with rod movement and cause flow blockage as in the partial meltdown at the Fermi I Plant in Detroit."

Response.

On April 20, 1979, during shutdown conditions, Big Rock Point personnel detected a vibration-type noise in the lower pressure vessel when the No. 1 recirculation pump was in service.

Because of an unrelated problem (a leak in a control rod drive housing) the reactor core was defueled and vessel internals removed. Sub-sequent inspection revealed that the No. I recirculation inlet baffle plate was loose from its mounting brackets on the vessel wall. The recirculation inlet 'oaffle plates were not completely effective, and in 1963 a new skirt baffle was installed on the core support plate and completely encircled all the support tubes.

The old baffle plates had been left in place and over the years the three hold-down bolts were worn through allowing the baffle plate to vibrate against the new skirt baffle.

The safety consequences of this failure were minimal since the plates are designed such that they cannot enter the core or constitute a flow blockage.

During the 1979 outage, new diffuser plates were installed using larger hold down bolts and positive nut locking devices.

. All the bolt ends and nuts from the old plates were accounted for and the reactor vessel was cleaned and inspected to assure that there were no other loose materials that could affect reactor operations.

Issue: "3 We demand that Consumers Power Company systematically and absolutely make the necessary design alterations in the reactor level vessel instrument system.LERE09 & LSRE09 which initiates reactor scram, containment isolation and core spray actuations."

Resoonse:

By Licensee Event Report 79-22 submitted to the NRC to letter of September 22, 1979, the licensee reported a potential deficiency in the water level instrumentation used for reactor scram and initi-ation of engineered safety features.

CPCo modified the instrumen-tation and submitted an evaluation of the acceptability of the modification to us by letters of October 23 and October 31, 1979.

By Amendment No. 31 dated November 2,1979 (copy attached to our March 5, 1980 Assessment) we approved revised license Technical Specifications for the modified instruments. The Safety Evaluation accompanying that amendment addresses the acceptability of changes to the Technical Specifications and the acceptability of the modifi-cation made to the water level instrtments.

As explained in that document, we have concluded that the design alterations are acceptable and that no further actions are necessary.

. Issue:

"4.

We demand that the biological shield be made sufficient to contain deadly accident (LOCA) gamma rays in the event of loss-of-coolant

, area residents would be protected and plant personnel would be able to perfonn necessary functions to bring the plant under control."

Response

One of the Lessons Learned from the TMI-2 accident is that radiation fields resulting from contained radiation sources after~

an accident may make it difficrit to effectively perform accident recovery operations or may impair safety equipment. As a result, by letter of October 30, 1979 we asked nuclear power plant licensees to perform a design review of plant shielding by January 1,1980 and to implement needed changes by January 1,1981.

Consumers Power Company submitted the design review by letter of December 27, 1979 and identified areas of the plant which would need additional shielding protection if NRC design criteria were to be met.

By letter dated February 22, 1980 and supplements dated April 2, May 6, August 25 and September 2, 1980, Consumers Power Company requested a delay in implementing the plant shielding i

requirement until the completion of an ongoing risk assessment of the plant. Consumers Power Company has estimated that this risk assessment will be completed by April 1981.

On September 5, 19Ps in a letter to all licensees, we provided clarification of ine TMI Action Plant requirements including modifications to the implementation schedules for certain items.

l These proposed changes included a delay in the scheduled implementation of '

l post accident shielding until January 1,1982. This schedule for the implementation of post accident shielding was subsequently approved by the Commission as indicated in NUREG-0737, " Clarification f

of TMI Action Plan Requirements." By letter dated October 14, 1980,

the staff responded to the licensee's request for this delay. Because the implementation date for these requirements has been delayed until January 1,1982 for all licensees, as discussed above, we concluded that no additional i

delay specifically for the Big Rock facility is needed at i

l this time, f

As required by the staff, the licensee has completed a review of vital areas in which personnel occupancy may be limited by radiation during post-accident operations. Our safety evaluation of the imple-mentation of " Category A" Lessons Learned requirements was issued on May 2,1980 and stated that the control room, the interim Technical Support Center and the Operational Support Center are sufficiently shielded that they would remain accessible for continuous occupancy.

The vital areas in which personnel occupancy may be limited are the backup emergency diesel, backup cooling water supply hose to the core spray heat exchanger and the emergency diesel general fuel supply. The licensee initiated work to implement changes for these three items, and two of them, the relocation of the backup emergency diesel and the modification to the emergency diesel general fuel supply, should be completed shortly. With respect to the third item, the licensee began l

l implementation of the modifications but has recently informed us that preliminary results from the probabilistic risk assessment being con-ducted for the Big Rock Point plant could affect the need for the modification to the backup cooling water supply hose to core spray heat exhanger. Accordingly, th'ey indicated that work on this third item has been stopped.

Because of the delay in the implementation of additional shielding requirements until January 1,1982, _ as discussed above, the licensee had additional time to further assess this modification.

The NRC design criteria assume a very severe accident with a very large radiation source term and assume that stringent limits on radiation exposure to personnel would be met.

Because of the conservatism of the design requirement against which the shielding acceptability must be evaluated, it is our judgement that a deferral of implementation until out latest proposed date of January 1,1982 does not expose plant personnel to a significant risk from a loss-of-coolant accident or pose a greater risk to the public than previously evaluated. However, we will require more immediate actions if further review indicates they are warranted.

Issue: "5.

We demand that repetitive malfunction of their containment isolation valves CV/4096, CV/4097 be resolved."

Issue: "6.

We demand that the repetitive malfunctions of valves CV/4027, CV/4117, CV/4105, M0/7050 be resolved."

Response

Repetitive malfunctions have occurred in several containment isolation valves. Valve CV/4097 is a butterfly valve in the supply line of the containment ventiliation system.

The valve is a replace-ment valve installed in April 1974. Excessive leakage through this valve was reported March 31, 1975, June 5, 1975, May 3, 1976, July 2, 1976, February 1,1978, September 12, 1978 and February 1,1979. Our records indicate that with the possible exception of one test, the leak rate through the line during accident conditions would have been acceptably limited by another operable insolation valve (CV/4096) in the same line.

In one i'nstance (LER R0-12-76 dated July 2, 1976) our readily available records do not indicate whether the leak rate through the line would have been acceptably low.

In each case, the licensee took corrective action to bring the leak-age back to within acceptable limits and after repetitive failures the licensee initiated a review with the vendor to bring about long term improvements.

We will continue to monitor the test results on CV/4097 to determin if additional corrective actions are needed.

Our records do not indicate repetitive failures of valve CV/4096.

M0/7050 is a main steam isolaticn valve. A failure of this valve to close was reported April 5,1973. The licensee ordered a new type of valve packing as a long term corrective action.

We will also con-tinue to monitor the test results on this valve to assure that the corrective action taken is sufficient.

CV/4027 is an automatic isolation valve in the reactor and fuel pit drain line.

Leakage in excess of technical specification limits for this line was reported by Licensee Event Reports (LER3) dated June 10, 1975, and September 27, 1978.

In each instance, Valve CV/4117, which is redundant to Valve CV/4027, was operable and would have prevented exce'ssive leakage through the line. The valve seats of CV/4027 have been machined to reduce the leak rate and the licensee has comnitted to installation of new valve seats.

A recent LER dated October 17, 1900 reported through seat leakage in excess of technical specifi-cations limits. Backup valve CV/4117 has been disabled in the closed condition until repairs can be made.

We have no record of failures on valve CV/4117. This valve was identified in several Licensee Event Reports noted above as the valve which provided redundancy to a valva with excessive leakage.

. CV/4105 is an air operated isolation valve on the demineralized water line inside containment.

Our records do not indicate a repeti-tive failure of this valve.

Issue: "7 We demand evidence that the BRNPF could withstand the crash of a B-52 Bomber without disaster to surrounding environment."

Resc er.s e:

The concern with overflight of the Big Rock facility by aircraft began in 1963, when the Air Force installed an aircraft tracking station at Bayshore, Michigan, which is loacted approximately five miles # rom the Big Rock Point Plant.

Following this installation, the Air cree began training the tracking station personnel in the detection :'

approaching aircraft.

Concurrently, the Air Force was trainin; the flight crews in avoiding detection by the radar station.

In the beginning it appeared that the Air Force was using the Big Rock Point Plant as a flight target, since there were many close overfli ghts.. Consumers Power Company management complained to the Atomic Energy Commission (AEC) regarding this matter, and an agree-ment was reached with the Air Force at that time to discontinue the direct low-level overflights. Low level overflights in the near' vicinity of the plant continued until 1970 when the Big Rock Point Plant insurer raised the insurance rates because of these training flights in the near vicinity of the plant.

At that. time, the Consumers Power President, James H. Campbell, contacted Cengressman Gerald Ford,.

requesting that these training flights in the near vicinity of the Big Rock Point Plant be discontinued.

At about this same time, in January of 1971, a flight crashed into the Little Traverse Bay appro-imately two miles from shore and about two miles from.the plant.

As

8.

_ 11 _

a result of these events the Air Fcrce established a training corridor which misses the Big Rock Plant by three miles. Air Force charts were also marked to show that overflights of the

~

Sig Rock Point Plant were "Off-Limits" and all training flights were to be confined to the corridor.

From that time until July 1979 no low level overflights have been observed by plant personnel.

In July 1979 a low level overflight was observed and a complaint was registered by: Consumers Power Company management.

The Air Force stated that restrictions on overflights would also be added to the flight checklists.

He reviewed the risk associated with aircraft near Big occ; Point in the Systematic Evaluation Program.

At the request of the NRC staff, the Air Force undertook a study to update an earlier analysis of the. risk of a military aircraft on training route 10, 600/601 crashing into the plant. The study was based on recorded data on flight frequency, navigation error, and crash rate. The Air Fcree calculated that the probability of a crash at

(

the plant (represented by a square target area 3.45 miles on a side) was approximately 10-8 per year. The staff has. reviewed the Air Force analysis and is in essential agreement with the methodology employed and the finding that a military aircraft crash at the plant l

is an ext. emely remote event.

Furthermore, in the course of this i

review, the staff was informed by the Air Force that pennission had been requested from the Federal Aviation Administration (FAA) to adjust route IR 600/601 so that in effect it would be located at a greater distance fron the plant. The staff was subsequently l

t i

~

informed that the request.had been approved and the Air Force has published the new route. The adjusted route will pass approximately 12 miles west of the plant.

We conclude that the risk to plant safety of military aircraft on route IR 600/601 in its present configuration meets the acceptance criteria of section 2.2.3 of the NRC Standard Review Plan for new plants and is therefore acceptable.

Issue: "8.

We demand that minimum requirements as established by the Nuclear Regulatory Commission for the Fi.e Protection System be met."

Response

By License Amendment No.17, dated March 6,1978, No. 25, l

i dated April 4,1979, and No. 32 dated March 27, 1980, we issued license conditions to assure that an acceptable level of fire protection is achieved at the Big Rock Point Plant. Amendments No.17 and No. 25 added limiting conditions of operation and surveillance require its to assure that existing fire protection equipment is operable and to require that modifications be made on a time schedule specified in Amendment No. 25 to further enhance fire protection at the plant. The staff safety evaluations associated with these amendments summarize our considerations in imposing these limiting conditions. Amendment No. 32 increased the number of fire brigade members from three to five.

It is our l

judgement that sufficient measures have been taken to permit continued plant operation prior to full implementation of all identified improvements identiff-1 in License Amendment No. 25.

r l

In addition, the Commission published on November 19,1980 (45 FR 76602),

a revised Section 10 CFR 50.48 and a new Appendix R to 10 CFR 50 regarding fire i

protection features of nuclear power plants. The revised Sect % n 50.48 and

[

Appendix R will become effective February 17, 1981. A copy of this rederal

'i Recister Notice is enclosed. Appendix R and Section 10 CFR 50.48 contain provisions and implementation dates applicable to the Big Rock Point Plant.

The petition of November 4,1979 included one concern not repeated in the petetion of January 6,1980.

That item (concern number 4) is addressed below.

Issue: "4.

We demand that all NRC requirements issued to Consumers Power Company regarding the Oyster Creek occurence [ sic] be implemented with no proposed changes, technical specifications or administrative control compromises allowed."

Rescense:

Following a loss of feedwater event at Oyster Creek Nuclear Generating station on May 2,1979, we determined that Big Rock Point was susceptible to a similar problem and would require a change in the technical specifications appended to the license prior to startup from the 1979 outage. Our evaluation indicated that two additional technical specifications were appropriate for Big Rock Point and these technical specifications were issued October 30, 1979 prior to plant startup. Amendment No. 30, which changed the technical specifications and a copy of the associated NRC Staff Evaluation was included with our Assessment dated March 5, 1980.

It is our judgement that the changes made are appropriate for Big Rock Point and do not constitute any conpromise of safety.

. CONCLUSION Based on the forgoing discussion and the provisions of 10 CFR 2.206, I have determined that there is no adequate basis for the issuance of an order to show cause why Facility Operating License No. DPR-6 for the Big Rock Pofnt Plant should not be suspended.

The requests of Ms. JoAnn Bier and Ms. Shirley Johns are, therefore, denied.

A copy of this decision will be placed in the Commission's Public Document Room at 1717 H Street, N. W. Washington, D. C.

20555 and the Local Public Document Room for the Big Rock Plant, located at the Charlevoix Public Library, 107 Clinton Street, Charlevoix, Michigan 49720. A copy of this decision will also be filed with the Secretary for further Coamission review in accordance with 10 CFR 2.206(c) of the Commission's regulations.

As provided in 10 CFR 2.206(c) of the Commission's regulations, this l

decision will constitute the final action of the Commission twenty (20) days l

after the date of issuance, unless the Commission, on its own motion, institutes a review of this decision within that time.

Origia:1 si;nd by IL R. D:aton r

l Harold R. Denton, Director Office of Nuclear Reactor Regulation f

Dated at Bethesda, Maryland this day of

Attachment:

Federal Reoister Notice j

dated August 19, 1980 i

i L