Forwards Directors Decision & Notice of Issuance in Response to J Bier & Sj John 791104 & 800106 Petitions to Delay Restart of Facility.Petition Treated as Request for Order to Show Cause,Due to Receipt After Restart
ML19340E680
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 12/18/1980
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Bier J, Johns S
AFFILIATION NOT ASSIGNED
Shared Package
ML19340E681 List:
References
NUDOCS 8101150379
Download: ML19340E680 (4)


Text

.

pm,ans

/[ t L l~ '

Y

'o UNITED STATES

, 8

~g NUCLEAR REGULATORY COMMISSION o

.E WASHINGTON, D. C. 20555

%...../

DEC1 8 19 9

.N Docket No. 50-155 m

a Ms. JoAnn Bier

-n 7

^

204 Clinton Street

~d

~~

n.3 Charlevoix, Michigan 49720 g

pj a

G:

w

=

Ms. Shirley J. Johns Route #1, Box 88 Ellsworth, Michigan 49729 Dear Ms. Bier and Ms. Johnsi This letter is in response to your petitions dated Novent)er 4,1979 and January 6,1980 requesting that the Director of Nuclear Reactor Regulation issue an order to Consumers Power Cocpany to delay restart of the Big Rock Point Plant pending resolution of certain concerns considered by you to be safety issues.

As stated in our letter dated December 4,1979, the petitions were not received before restart of the plant. Consequently, the petitions have been treated as a request for an order to show cause why Facility Operating License No. DPR-6 for the Big Rock Point Plant should not be suspended pending resolution of the issues you raised.

By letter dated March 5,1980 we issued a Safety Assessment relating to these concerns and concluded that there was sufficient assurance of safety to per-l mit the plant to continue operating, pending final disposition of the issues raised.

Based on the evaluation contained in the Safety Assessment we advised you that there was no need for emergency actions.

By letter dated Artil 14, 1980, the Acting Secretary of the Comission issued a statement related to the Comission's review of our March 5,1980 Assessment. That stateiaent indicated that the Comission was taking no action with respect to y decision of March 5, 1980.

l l

Your petitions ~ nave been considered under the provisions of 10 CFR Section 2.206 l

of the Comission's regulations. This office has determined, for reasons set forth in the enclosed " Director's Decision Under 10 CFR 2.206," not to issue an order to show cause why Facility Operating License DPR-6 for Consumers Power Conpany's Big Rock Point Plant should not be suspended.

t l

no11eo379

i r;s. oier anc is. donns

-z-4 A copy of the decision is beina filed with the Secretary for further Commission review in accordance with 10 CFR Section 2.206(c). As provided in 10 CFR 2.206 (c), the decision will constitute the final action of the Commission twenty days after the date of issuance of the decision unless the Commission, on its own motion, institutes a review of the decision within that time.

A copy of the Notice of Issuance of the Director's Decision, which is being filed with the Office of Federal Register for publication, is also enclosed.

-1 1 J Harold R. Denton, Director Office of Nuclear Reactor Regulation

Enclosures:

1.

Dirreter's Decision 2.

Notice of Issuance DIS TRIBUTION Docket NSIC NRC PDR TERA Local PBR ACRS (16)

ORB Reading EDO Reading

  • to be blue-bagged NRR Reading W. Dircks H. Denton E. Case D. Eisenhut R. Purole T. Novak R. Tedesco G. Lainas J. Roe J. Heltenes, AE0D D. Crutchfield H. Snith W. Paulson OELD C. Miles, PA S. Cavanaugh G. Ertter I&E (3)

S. Chilk, SECY (5)*

C. Stephens, SECY* (w/ incoming request)

L. Bickwit, GC*

NRR: D/DIR NRR: DIR J. Murray, ELD

  • ECAse HDenton A. Rosenthal, ASLAB ASLBP SEE PR:'!'DUS YELLC',' ICR C0"CURRE!!CES omcc).

ORp,5 BL: ORB #5 DL:

OELD 0

AD/SA DLiGR M

DL:

'D ut G d $s 7

,WPaulson, DCr field t

D sun ~~4.HS p fRW iyl[

m y N R 1 Ulj R n,i,t6 a

Ms'. Bier and Ms. Johns 2-A copy of the decision is being filed with the Secretary for further Commission review in accordance with 10 CFR Section 2.206(c). As provided in 10 CFR 2.206 (c), the decision will constitute the final action of the Commission twenty days after the date of issuance of the decision unless the Commission, on its own motion, institutes a review of the decision within that time.

A copy of the Notics of Issuance of the Director's faecision, which is being filed with the Office of Federal Register for publication, is also enclosed.

' 21

a.. L
,:a ;

Harold R. Denton, Director Office of Nuclear Reactor Regulation

Enclosures:

1.

Director's Decision 2.

Notice of Issuance l

4 s

I l

~

l -

~

l t

., l',

l-

Mr. David P. Hoffman CC Mr. Paul A. Perry, Secretary U. S. Environmental Protection

~

4 C nsumers Power Company Agency 212 West Michigan Avenue Federal Activities Branch Jackson, Michigan 49201 Region V Office ATTN: EIS COORDINATOR Judd L. Bacon, Esquire 230 South Dearborn Street Consumers Power Company Chicago, Illinois 60604 212 West Michigan Avenue Jackson, Michigan 49201 Herbert Grossman, Esq., Chairran Atomic Safety and Licensing Brard Joseph Gallo, Esquire U. S. Nuclear Regulatory Comission Isham, Lincoln & Beale Washington, D. C.

20555 1120 Connecticut Avenue Room 325 Dr. Oscar H. Paris Washington, D. C.

20036 Atomic Safety and Licensing Board U. S. Nuclear Regulatory Comission Peter W. Steketee, Esquire Washington, D. C.

20555 505 Peoples Building Grand Rapids, Michigan 49503 Mr. Frederick J. Shon Atomic Safety and Licensing Board Alan S. Rosenthal, Esq., Chairman U. S. Nuclear Regulatory Comission Atomic Safety & Licensing Appeal Board Washington, D. C.

20555 U. S. Nuclear Regulatory Comission Washington, D. C.

20555 Big Rock Point Nuclear Power Plant ATTN: Mr. C. J. Hartman Mr. John O'Neill,11 Plant Superintendent Route 2, Box 44 Charlevoix, Michigan 49720 Maple City, Michigan 49664 Chris ta-Mari a Charlevoix Public Library Route 2, Box 108C 107 Clinton Street Charlevoix, Michigan 49720 Charlevoix, Michigan William J. Scanlon, Esquire Chairman 2034 Pauline Boulevard County Board of Supervisors Ann Arbor, Michigan 48103 Charlevoix County Charlevoix, Michigan 49720 Resident Inspector Big Rock Point Plant Office of the Governor (2) c/o U.S. NRC Room 1 - Capitol Building RR r3, Box 600 Lansing, Michigan 48913 Charlevoix, Michigan 49720 Director, Criteria and Mr. Jim E. Mills Standards Division Route 2, Box 108C Office of Radiation Programs Charlevoix, Michigan 49720 (ANR-460)

U. S. Environmental Protection ;

Thomas S. Moore Agency Atomic Safety & Licensing Appeal Board Washington, D. C.

20460 U. S. Nuclear Regulatory Comission Washington, D~. C.

20555

i.

i j'

~

i l

i i

Mr. David P. Hoffman 1

5

.s i

'CC i

Dr. John H. Buck l

l Atomic Safety and Licensing Appeal B.3ard i

U. S. Nuclear Regulatory Commission i'

i-Washington, D. C.

20555 4

[

I I

I l

1 1

l l

l l

t f

i i

i I

l 1

O I

i l.

6 N

F s

(

r i.

t'

)-

4 I

1 e

s

?

w.w-,

n m,.+

~, m -

w n n ',,r a, re,.,. e, we r,

.w+en--we~~.

w.,-,_,~+,-~n,-n_,.,-,-nnm.,.ne,.n.,-se,,nw.,,,,,m,-.,.nn_ww..e