ML19340E593

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-369/80-34 on 801103-06.No Noncompliance Noted
ML19340E593
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 12/05/1980
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19340E594 List:
References
NUDOCS 8101150015
Download: ML19340E593 (2)


See also: IR 05000369/1980034

Text

1

'

t;NITED STATE;

,

,

ijuCLEAR REGUL.ATORY COMMISSION

h

J ^,

$ .'k;7 f 3

m GI O N 11

E

-

,

i

m

f :' !

%df ' f

[

101 MARIETTA ST., N W., SUITE 3100

-

.

i

ATLANTA, GEORGI A 30303

._

Q,

'4

e

c. . , . 6

3::

c5

7

],_c3

3%

DEC 0 51980

g

a

In Reply Refer To:

'

RII:GLT-

0

c3

A

3

_

( 50-369/80-34 /

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by G. L. Troup of this office on

November 3-6,

1980, of activities authorized by NRC Construction Permit No.

CPPR-83 for the McGuire facility, and to the discussion of our findings held

with D. J. Rains at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

.

-

.. ,.

A

N

M

J PhilipStodr, hief

uel Facilit'y and Materials

-

Safety Branch

Enclosure:

(See Page 2)

810115 0 AQ

.

.

r

.

Duke Power Company

-2-

DEC 0 51980

Enclosure:

Inspection Report No. 50-369/80-34

cc w/ encl:

M. D. McIntosh, Plant Manager

J. C. Rogers, Project Manager

,

l

.

1

.

l

-

t

-