05000366/LER-1980-163-01, /01T-1:on 801215,util Notified That Reactor Vessel Head Insulation Structure Did Not Conform to Seismic Class I Requirements.Caused by Failure to Incorporate Mods During Const.Insulation Structure Will Be Modified

From kanterella
(Redirected from ML19340D852)
Jump to navigation Jump to search
/01T-1:on 801215,util Notified That Reactor Vessel Head Insulation Structure Did Not Conform to Seismic Class I Requirements.Caused by Failure to Incorporate Mods During Const.Insulation Structure Will Be Modified
ML19340D852
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 12/23/1980
From: Coggin C
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19340D847 List:
References
LER-80-163-01T, LER-80-163-1T, NUDOCS 8101050460
Download: ML19340D852 (2)


LER-1980-163, /01T-1:on 801215,util Notified That Reactor Vessel Head Insulation Structure Did Not Conform to Seismic Class I Requirements.Caused by Failure to Incorporate Mods During Const.Insulation Structure Will Be Modified
Event date:
Report date:
3661980163R01 - NRC Website

text

wum m = =

(7 77)

LICENSEE EVENT REPORT

~

control DLoCK: l l

l l

l l

l (PLEASE PRINT on TYPE ALL REQUIRED INFoRMATION) 1 6

lG l A l El I l H l 1 l@l 010 l-1010 l01010 l-l010 l@l4 l1 l 11111 l@l l

l@

0 t 7

8 9 LICENSEE 00LE 14 IS LICENSE NUMBEH 2b 26 LICENSE TYPE JO b7 CAT $8 con'T

% "CI LL_J@l 015101010131616 l@Li l211 is In 10 l@l11212 i 31810 l@

~

O i 7

8 60 61 DOCKET NUMBEH 08 6'J EVENT OATE 74 7b RE PORT DA1E 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h O 2 10n 12-15-80,- with Unit 2 in cold shutdown for refuelina Bechtel Power i

lCo. notified GPCo that the reactor vessel h'ead insulation structure did l O 3 10l41Inot conform to seismic class I requirements and would require modifica-l l tion.

This event concerns only Unit 2.

There was no effect on public l

0 s l health or safety as a result of this event.

This event is nonrepeti-l 0 s lO171Itive.

i l 0 lH j l l

EDE

^

CODE

$ BC E COMPONENT CODE SU8C DE S

E LO19_l l C l A l@ [_Bj@ l Cl@ l X I X l X I X l X l X l@ [X_J@ [Z_J @

7 8

9 to 11 1;

13 18 19 70 SEQUE NTI AL OCCURRENCE REPORT REVIGION tgnfpo EVENT YE AR REPORT NO.

CODE TYPE N O.

@,Rt,P g l21 81 01 l-l l 11 61 31 W

l 01 1_]

IT I

[-j [1_j 22 2J 24 26 27 28 29 30 31 32 AK f ACT P ON PL NT T D HOURS S8 iT FOR9 8.

$ PPLIE MANUFACTURER [F_j@[_ZJ@

l Zl@

l Z]@

l 01 01 0l 01 l Yl@

l N l@

[Jij@

l Tl 2181 Ol@

33 34 35 36 31 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h li1011 The vessel head insulation as sunnlied bv Transco Co. was reviewed and I i i I analv7ed by Bechtel and was found not to conform with seismic class I I

i 2 I requirements.

Modifications were proposed but were not incorporated l

l i a I durina construction.

The insulation structure will be modified.

I I

I i 4 l

80 7

8 9 ST S

% POWE R OTH ER STATUS IS O IY DISCOVERY OESCRIPTION

[_11] @ l 0 l 0 1 0 l @ l NA l

[_0_j@l AE Notification l

i 5 ACTIVITY CO TENT HELEASED OF HELE ASE AMOUNT OF ACTIVITY LOCATION OF RELEASE

! Ii lG l [l] @ [ll@l NA l

l NA l

'7 8 9 10 11 44 45 80 PERSONNEL EXPOSURES NUMBER TYPE

DESCRIPTION

i li l 71 101 o l ol@l Z l@l NA l

n nSONNE t%UE ES oESCniPTiON@

NU, ei n l0l010l@l NA l

i a 7

8 9 11 12 80 LOSS OF OH OAMAGE TO FACILITY T YP E DE SCRIPTION [J_j@l NA l

9 80 7

8 9 10 PUBLICIT Y 4RC USE ONLY 810105 0%D i i i i i i i iiiiiiij

'}"gf"'"' "

NA

, o 68 69 80 g 7

8 9 to 912-367-7781 2,

C. l. Connin. Supt. Plt. Eng. Serv. pgoyc; NAVE oF PREPARER

LER f:

50-366/1980-163 Licensee:

Georgia Power Company Facility Name:

Edwin I.

Hatch Docket #:

50-366

Narrative

Report for LER 50-366/1980-163 On Friday, 12-12-80, Bechtel Power Corporation notified the plant site that there was a potential' problem with Unit 2

reactor head insulation structure in that it may not meet seismic class I requirements.

This came about during review of pictures taken at the site of i

the insulation for design of the r e f u e ling bellows insula-tion.

On 12-13/14-80, the site reviewed the drawings and information from Bechtel, and on Monday, 12-15-80, the site notified Bechtel of the results of the investigation.

Bechtel then confirmed that indeed the insulation structure did not meet seismic class I requirements and that the structure would need modifications as originally proposed by.Bechtel during the Unit 2 construction phase.

The insulation structure will be modified before Unit 2

startup scheduled in early February.

This condition does not affect Unit

1. which has a similar insulation because Unit I has been verified to have already been modified to conform to seismic class I requirements.

l There was no effect on public health and safety as a result of this event.

The

cause

of the event was an oversight in i

modifying the insulation structure during construction of Unit 2.

No other cause or details of this oversight is available or known to exist at this time.

No further corrective action other than that stated above is planned or deemed necessary.