ML19340D653

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-133/80-03 on 801110.No Noncompliance Noted
ML19340D653
Person / Time
Site: Humboldt Bay
Issue date: 11/15/1980
From: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Crane P
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML19340D654 List:
References
NUDOCS 8012310549
Download: ML19340D653 (2)


See also: IR 05000133/1980003

Text

T/C

.

p no

,

jo

UNITED STATES

g

8

NUCLEAR REGULATORY COMMISSION

o

?, (

i

nEcion v

i

oi

1990 N. CALIFORNIA BOULEVARD

  • &g

,

SulTE 202, WALNUT CREE K PLAZA

4

%o*

WALNUT CR EEK, CALIFORNIA 94596

,

'

Docket No. 50-133

,

Pacific Gas & Electric Comoany

77 Beale Street

San Francisco, California 94106

Attention: Mr. Philip A. Crane, Jr.

Assistant General Counsel

Gentlemen:

Subject: NRC Inspection

This refers to the inspection conducted by Mr. A. Johnson of this office

on November 10, 1980 of activities authorized by NRC License No. DPR-7, and

to the discussion of our findings held by Mr. Johnson with Mr. E. Weeks and

other memcers of your staff at the conclusion of the inspecticn.

Areas examir.ed during this inspection are cescribed in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and

observations by the inspector.

No items of noncompliance with MRC requirements were identified within the

scope of this inspection.

In accordance with hetion 2.790 cf the NRC's " Rules of Practice,"_ Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you believe to be proprietary, it is

necessary that you subnit a written application to this office, within 20

days of the date of this letter, requesting that such information be withheld

from public disclosure. The application must include a full statement of the

reasons why it is claimed that the information is proprietary. The application

should be prepared so that any proprietary information identified is contained

in an enclosure to the application, since the application without the enclosure

will also be placed in the Public Document Room.

If we do not hear from

you in this regard within the specified period, the report will be placed

in the Public Document Room.

8012310N

O

o

c. 1 F 1350

a

Pacific Gas & Electric Ccepany

-2-

Should you have any questions concerning this inspection, we will be glad

to discuss them with you.

Sincerely,

k'.')&f

= SG s lAu

_

J. L. Crcus, Chief

%

ReactorOperationsan(d-Nuclear

Support Branch

Enclosure:

IE Inscecticn Recort

No. 50-133/80-03

cc w/o enclosure:

J. D. Shiffer, PGSE

E. 'Jeeks, P3&E (Humboldt Bay)

W. A. P.aymond, PG&E