ML19340D631

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-341/80-18 on 801001-31.No Noncompliance Noted
ML19340D631
Person / Time
Site: Fermi 
Issue date: 11/20/1980
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hines E
DETROIT EDISON CO.
Shared Package
ML19340D632 List:
References
NUDOCS 8012310506
Download: ML19340D631 (2)


See also: IR 05000341/1980018

Text

./s j U

[ p uan

j

k" 7,

UNITED STATES

E'

NUCLEAR REGULATORY COMMISSION

  1. 7

$

E

REGION 111

^"

o,

.

/

799 ROOSEVELT ROAD

% '...* [

GLEN ELLYN. ILLINolS 60137

November 20, 1980

Docket No. 50-341

The Detroit Edison Company

ATTN:

Mr. Edward Hines, Assistant

Vice President and Manager

Quality Assurance

2000 Second Avenue

Detroit, MI 48226

Gentlemen:

This refers to the inspection conducted l'y B. H. Little and P. M. Byron of

this office on October 1-31, 1980, of activities at Enrico Fermi, Unit 2,

authorized by NRC Construction Permit No. CPPR-87 and to the discussion

of our findings with Mr. J. Nyquist at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you

or your contractors believe to be proprietary, you must apply in writing

to this office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure. The application must

include a full statement of the reasons for which the information is

considered proprietary, and should be prepared so that proprietary in-

formation identified in the application is contained in an enclosure to

the application.

.

8~.,n soc

e

m

.

.

Detroit Edison Company

-2-

November 20, 1980

.

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

b r'

R. F. Heishman, Chief

Reactor Operations and

Nuclear Support Branch

Enclosure:

IE Inspection

Report No. 50-341/80-18

cc w/ enc 1:

Central Files

Reproduction Unit NRC 20b

AE0D

Resident Inspector, RIII

PDR

Local PJR

NSIC

TIC

Ronald Callen, Michigan

Public Service Commission

Eugene B. Thomas, Jr.,

Attorney

!

i

l

l