ML19340D435

From kanterella
Jump to navigation Jump to search
Forwards LER 80-077/03L-0
Date released: 12/20/2019 Download: ML19340D435


LER 80-077/03L-0:on 801120,snubber 1-E41-2SS105 Found Not to Be Connected to Pipe Clamp on HPCI Sys Main Pump Discharge Piping.Caused by Personnel Error.Personnel to Be Reinstructed
ML19340D449
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 12/19/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19340D449 (2)
Forwards LER 80-077/03L-0
ML19340D434
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 12/19/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19340D434 (1)