ML19340D052

From kanterella
Jump to navigation Jump to search
Tech Spec Table 5.4-2, Min Frequencies for Checks,Calibr & Testing of Loop Shutdown Sys
ML19340D052
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 05/17/1974
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML19340D051 List:
References
NUDOCS 8012190422
Download: ML19340D052 (2)


Text

- _ - - - - - _ _

k' Cn/

. e Table 5.4-2 HINIHtM FREQUENCIES FOR CHECES. cal.1BRATIONS AND TESTING OF In0p SaluTDOWH SYSitM

.y*

Channel Description _

Function Frequency Hethod Compe:toon af sepeaste uitssoonic channel indicatorelloop.

1.

Steam pipe Rupture a.

Check D

e.

(Fire Cavity)

(p)

REV.

b.

Test H

b.

Futes test one temperature and pressure channel utth another C[>

No. 1 temperature and pressure channel tripped. uhtte simulteneously C;hh) beving tuo ultrasonic channele talpped.

p4 Polee teet one ultrasonic channel uith another ultrasonte c.

Test H

c.

Lz C)GleTE channel artyped uhtte et.ultaneously havins tuo preneure channele tripped.

))7 d.

Test N

d.

Fressure settch actuated by pressure appiled at eensor, s

Temperature euttch actuated by heat applied et sensor.

e.

Test M

e.

f.

Test M

f.

Internal test algnet to adjust ultramonte trip.

g.

Test M

s.

Trip test signal solenote valves to verify loop integrity.

s) mEv.

h.

Calibrate R

h.

Known pressure applied at sensor to verify response.

yo, g 1.

Calibrate B

1.

Enoun temperature applied at sensor to verify response.

J.

Calibrate R

j. Knoun sound applied at sensor ta verify response.

Cenpatioon of separate ultrasonic channel indicatore/ loop.

2.

Steam Pipe s.

Check D

e.

[

Rupture b.

Test M

b.

Futes test one temperature and pressure channel utsh another i

(Under FCRV)

REV.

temperature end pressure channel tripped, uhtle slaultaneously No. 1 having tuo ultreeente channels tripped.

Puhee test one ultremonic channel uith another ultrasonic i

'c.

Test M

c.

CEn.ETE channel trapped, uh:1. et.ultaneounty he,tes tuo pressure j

chonnele tripped.-

cm aao og pg,4 ng 09 4nN

>6 pr rt mD LA >6

>6 to O nr D Da.t S$

I F4 CN F4

<=

ln M

$ M3 bB

@ V6 LM n D

%% F6 F4 r% <h

%J >6 he Nn

'4 LB

e

.3 En

12/10/00

!;DTE T0:

Mike Collins & Don La,nham, DSB (016)

FROM:

Reba Diggs, Lic:nse Fee "anagement Cranch, ADM

SUBJECT:

PROCESSI::G LETTERS MITH CHECr.S RECEIVED DIRECTLY BY TliE LICENSE FEE i'.A. AGEME::T BRA!!CH Picase process the enclosed letter under the applicable docket and give.

the folicwing distribution under code M008:

Original of ltr to Regulatory Dochet File Action Cy w/ check to W. O. Miller, LFMS (L-233) 3 cys to applicable Branch of DDR or DPM 1 to LPDR 1 to PDR I am retaining the check and the following information is for your records.

Check No.:

214539 Amount:

$4,000 Date:

12/10/80 Ltr Date:

12/5/80 Applicant:

Public Service Co. of Colorado Docket No:

50-267 Plant:

Fort St. Vrain Thanks!

Q

..s tic e t

-t a N

Reba M. Diggs License Fee Management Branch Office of Administration

, ~ -, -

, - -