Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2251997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2331997-11-30030 November 1997 Corrected Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9171997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 NPL-97-0715, Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9361997-10-31031 October 1997 Revised Monthly Operating Rept for Oct 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0621, Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9311997-09-30030 September 1997 Revised Monthly Operating Rept for Sept 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0553, Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9261997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for Point Beach Nuclear Plant,Unit 2 ML20210H9531997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20210H9601997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for Point Beach Nuclear Plant,Units 1 & 2,which Provides Corrected Forced Outage Rates NPL-97-0318, Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 2 ML20141C2381997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20141C2461997-03-31031 March 1997 Corrected Operating Data Rept for Mar 1997 for Point Beach Nuclear Plant,Unit 1 ML20137P5781997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Point Beach Nuclear Plant Units 1 & 2 ML20137P5711997-02-28028 February 1997 Corrected MOR for Feb 1997 for Point Beach Nuclear Plant Unit 1 ML20135F2721997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20134J8711997-01-31031 January 1997 Monthly Operating Repts for Jan 1996 for Point Beach Nuclear Plant,Units 1 & 2 ML20135F2771997-01-31031 January 1997 Revised Monthly Operating Rept for Jan 1997 for Point Beach Nuclear Plant,Unit 2 ML20133N0601996-12-31031 December 1996 Revised MOR Rept for Dec 1996 for Point Beach Nuclear Plant, Units 1 & 2 ML20133F6471996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Point Beach Nuclear Plant,Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with ML20212D5961999-09-15015 September 1999 Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20196J4251999-06-30030 June 1999 Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 ML20196F3341999-06-22022 June 1999 Safety Evaluation for Implementation of 422V+ Fuel Assemblies at Pbnp Units 1 & 2 ML20195F9781999-06-10010 June 1999 Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1 ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With ML20196F3521999-04-30030 April 1999 Non-proprietary WCAP-14788, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power) NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with ML20207D6751999-02-22022 February 1999 Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars ML20206R9001999-01-13013 January 1999 SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-99-0091, 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with1998-12-31031 December 1998 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with ML20198C7671998-12-10010 December 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20195J5101998-11-16016 November 1998 Proposed Revs to Section 1.3 of FSAR for Pbnp QA Program ML20198J5941998-11-0303 November 1998 1998 Graded Exercise,Conducted on 981103 NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0880, Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored1998-10-21021 October 1998 Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored ML20154M9121998-10-14014 October 1998 Unit 1 Refueling 24 Repair/Replacement Summary Rept for Form NIS-2 ML20154L6751998-10-14014 October 1998 Unit 1 Refueling 24 ISI Summary Rept for Form NIS-1 NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20236Q3161998-07-10010 July 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 ML20236L6771998-07-0707 July 1998 Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20217F3131998-04-17017 April 1998 Safety Evaluation Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds,For Plant, Unit 1 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0209, Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable1998-03-30030 March 1998 Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable ML20217A8501998-03-19019 March 1998 SER Accepting Proposed Changes Submitted on 980226 by Wiep to Pbnp Final SAR Section 1.8 Which Will Impact Commitments Made in Pbnp QA Program Description.Changes Concern Approval Authority for Procedures & Interviewing Authority ML20216J0101998-03-17017 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Relief Request RR-1-18 for Plant NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198L1151998-01-0808 January 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Point Beach Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
a- s ,;l
. t OPERATING DATA f EPol'T DOCVET 110.50-26n N'
DATE November 5, 1980 (= i)
COMPLETID BY C. W. FAY U
oc h5'eJ O TF LLPl10NF 84 1 'l 27/ 281!
W OPERATilG STNills b.3'
- . . . . . . . . . . . . . . . . . . . .. . . . . .. >>e)
N 1. UllIT t!AME: POlllT BEACH I!I' CLEAR PL AllT lil4IT 1 . Il0TES .
- Q 2..REPOkTit!6 PEl<IOD: -
GCTOBEli 1980 . . b c)
C 3. ' LICEtl51.0 Tili RF.1AL POWI.R (MUT): 1518. . .
84 . HAM 4PLATl R ATIllG ( CP 05' MWE): 523.8 . . FM S. DESIGil i L: CTPI(, AL H ATIt!G. (llET MWL): 8497. . .
S
- 6. MAX]htli : DEPT NDAHLF C AP,: CITY (GPO5f. MWE): 519. -
.. . g g, 7. VAXIMUil DEPe ttbAllLIJ C APnCITY (NET MUE):. 8495. . . . . . . . . . . . . . . , . . .. . . . . . .
- 8. IF CH ANGF5 . OCt tJR Ill CAPACITY PA11tlG5 (ITEMS tillb OFP 3 THh0!i6tl 7) SItk.P LAtT PLP0Fle CIVl l i ALOll' :
S tlO T A P r L I C Alit. E .
b 9 POWEN t.1V'L TO WHICil RiiSTIICTEDe IF AtlY (l'ET MW!. ) : 390.0 L II . HEA50tl1 Fo!* t F S TI I C T t oll*, , (1F At!Y): gfXXXfikXRMMXkMX Power restriction is the result of a self-imposed reduction to core average temperature in an attempt to inhibit corrosion of steam generator tubes within the tubesheet e evice. THIS MotlTil YR TO DATE Cl)MILATIVE 1!. IlotJR5 Ill1EPOPTihG PFIloD ,
7845 7e320 87,5,2
- 12. titiMifER OF llot'F:5 i FACTol? WAS ClITICAL 7845.0 6e2?S.8 72 e 786:!.3
- 15. FF ACTOP r i St i Vi Sl! LIT 0 0 Wil 110t'Ith 0.. o 19.5 601.7 18F . IlOURS GElli P ATOP s,il LIl ff 7865.0 6,07S.2 70e4469.2 l 'i . IIMIT PES,IVi
- lillTD0ht! Ilot IPh 0.0 152.8 75v.2
- 16. GPOS' Tilfl' MAL,. Fil itCY 8.1 I!, l' ATi 0 (l'Wil) 901e810 7,3".1,09i 98,0c3 e a r86
- 17. GPOS El.t CTI(Ir AL Fil PGY i.i lb i ATi D (MWH) 293,160 2e381 060 3',01Se714
- 18. IlFT t L. ClPI( Al. I II, l*GY CFli,1: ATl D (MWil) 27 /e20 e 2, '869,770 31,16.W e '8t a
- 19. titi!T SEPVICl' _ F ACTO 6' 10 i . . + 83.0 80.5
- 20. I! flit Av. lt.ylill i TY F AC10P 10.!.o 85.1 8 1 . 46
- 21. titlIT CAPS C]TY F AC TOR (tiSil!C MDC 1 FT) 76.2 62.1 73./
2'. IlillT CAPorITY FACTOP (IISING dei < tit T ) 786.9 61.8 72.3
- 25. lH11T FOPCFD olG AGl: P All .
0.0 0.1 3. >
2 86 . Si ll !T DOWil'. . CilEI)t 't.f f i OV! P t !! XT 6 M6' ITils (T Y PE e U Al l e Allu ! I!!< AT IOli . F F ACl!) :
Unit scheduled to shut down November 28, 1980, for approximately five weeks for refueling.
- 25. F ElitlTl10Wil AT Fluh GF RFPol T I ri'It De FST iMNil.D i All OF ST AP't t 'P : If0T f.HIO DOWil l > AT -i PF POf 1. It Albr F AC101 c. chl*14ATFD /.6, PI Ol t:
- T. O ill t i C i lT iP O A s s i, c ' PTi UD. F 2: e 197e
8 OPER ATit1G DATA REPORT DOCVET l10. 50-301 DATE November 5, 1980 COMPLETED BY C. W. FAY g TELEPHONE 414 277 2811 OPEPATIrlG STATUS g,9)
- 1. UtliT f!AME: . point BEACilflUCLEAR PLANT UtliT 2 r10TES .
O r
- 2. REPORTING PERIOD:.. OCTOBER 1980 .
- 3. LICEllSED TilERI:1AL POWER (MWT): 1518. . .
- 4. NAMEPLATE RATIt1G (GROSS MWE): 523.8 ,
. . {g g S. DESIGil ELI.CTRICAL R ATING. (flET MWE): 497.
- 6. MAXIML)ii DEPENDABLF C APACITY (GROSS MWE): 519. .. , ,
. pd
- 7. f3AXIt40'1 DEPI'tIDAOLE CAP 6 CITY (ilET . MWE ) : . 495. . . . . . . . . . . . . . . . . . ... . . . . . c.
6 3 ti . IF CilAt4GES.0C(UR IN CAPACITY RATINGS (ITEMS t! UMBER 3 TilROtlGil 7) SINCE LAST REPORTe GIVE REASOllS: U .
NOT APPLICABLE . . .. . .
- 9. POWER LFVEL TO WitTC11. RESTRICTED, IF ANY ( N F T t.4 W E ) : NOT APPLICABLE
- 10. REA50f th FOR ltESTiiICTIOt!Se (IF ANY): Il0T APPLICABLE Til S MONTil YR TO DATE Cl>MI'L AT k VE
- 11. 110 RS EN HEPORTit1G F5FRiOD, , .
745 7e320 72e337
- 12. NilMBER OF llOllRS FEACTOR WAS CRITICAL 745.0 6e211 1 65,108.0
- 13. REACTOR 1 FSl;l:VF SNllT00WN ilOtlRS 0,0 19 6 185.7
- 14. 1.101)RS GEllt U ATOR , ON LIllE 745.0 6e143.5 63e870.5
- 16. titlIT REST RVI: StillTDOWil llOllPS 0.0 15.3 121.7
- 16. GROS' TilERMAL ENt RGY GENI RATFD (MWill let!2eS14 9e033,479 86 e r,H:, e 015
- 17. GROS' ELI CTRIC AL Etit RGY Gell! R ATF D (MWil) 38Te910 3e045e380 29e406e720
- 18. IJET t'LICTRICAl FN! RGY 01116 H ATIT) (MWil) 366e708 2e901e813, 27e976e940
- 19. UNIT SEPVICF FACTOR 100.0 83.9 8 t.3
- 20. tJilIT AV61 lod 1lITY FAC10R. 101.0 84 1 ad.5
- 21. IJN}T CAPACITY FACTOR (t)S]llG MDC t'ET) 99 4 80.1 .78.d 2*. IJNIT CAP /sCITY. FACTOR (llSillG DER NI.:T) 9'!.0 79 8 7 /.8 0.0 5.6 1.9
- 23. tir!TT FORCFD OllTAGE DATF . .
- 24. SilllTDOWils ' CilFDilLFD OVl R lli XT 6 M0tlTils (TYPEe DATFe AtlO tIIRATIOll OF EACll):
Unit scheduled to shut down April 17, 1981, for approximately five weeks for refueling.
- 25. 5F SilllTDOWil AT ErlO OF REPOPT Pt:t iODe F STiMA7 FD tiATF OF STAR 1tlP: NOT SiluTDObt!
DAT A REPORTFD ANu FACTOllS C AL0lli ATED AS PFGbi:STI D ill llRC LFT1t.it DATFU Sl Pll'MDFR 2?e 197/
!;; . ; j ; !$1 l:l1!; .-
i : I l ' ' '
( A 0D 1-2 N 78 o 8B
)
1 D
SF a
t e
SF co hr ec de ud NeDe-l e
d Q:sgaac
~:gus c
1 1 GFEDCBAR
- - - e 4egoc" C
a OOAORRMEs tp dp e e a q o :
- Gvjo E
w U
h e m e g fiu n R N e r ir u u n i: v.
3cjnSt n E I ranaletp .
83c getou" P T titalem O
( isotine R S eotronan T H xnr rgnt L U paaTy c i M T lltr eF c O D a iaR a Re N O iEvie oi en T W nrans rl ps H N
) r it u oe S o nr Tr re r gi ee t A c s E N
( &t t( Nv O D e i e c x Lo x .o ne t P p in p t o ^
l c l b e
W _
a e a E i n i c ,r R n
)
s e
n
) )ggm. e!" 1 R
E E 9 D _
x 8 U C
a 0 m OoEgcE4 T I
Og'e n O N
S 432lM e
t C OAMMh a tuaao Tu htnnd os eouu: e rmaa all P
ra C
( t en TO eiS vd EM D xcc e LP UO p r nC EL NC lSa to PE IK acm ir Rr r HT OE TE T
na ee ND N
) m cc E AN .
ut B MO 5 4 ri Y E.
rv _
SE ( Sate ee 4C P5 o
n 1 0
_ ox Nhtix cA 4 i -
uh U e io h ec / n 2 ri Reoni t 2 t 6 cb Etnsb i 7 6 si Gs i B t - oft o 7 P a e 0ffo n 2 v a I 1o rG 8 c
- 6rD - 1 h 1 API 1 S ) Ltrn U a Eaes n m R pt i s Ear t Fnru it c 1 lr -
ey
! i ' 4 :
I i ! ' 3 '
- ( A 0D
- 1- _
- 2 N _
78 o 8B 2 _
D _
SF a
- : t e _
SF co _
hr ec ~
de sgG ud l _
e d OogUac "mgLs a 1
1 GFEDCBAR e
%egoa" a _
OOAORRMEs tp dp e e a q o :
CGvjO' u U _
h s m e g fiu n R N _
e r ir u u n i: 14gP4n U t E I ranaletp - P T titalem 8 l*cg4to O
( isotine R S _
eotronan T H xnr rgnt L U paaTy c i M T lltr eF c O D a iaR a Re N O iEvie oi en T W nrens rl ps H N
) r it u oe S o nr Tr re r gi ee t A c s E O c
N
( &t t( Nv D e i e .o ne t
o x Lo x b P
p in p t O l c l e W a e a ,r E i n i R n s n
) e ) mgSP.
gO' 1
9 R
E E - 8 D x 0 U C
a m UoEgcE# . T I
og'G n O 3 N S
432lM e
t C OAMMh a tuaao Tu htnnd os eouu: e rmaa P all ra C
( t en TO eiS vd EM D A' c c e LP UO p r nC EL NC lSa to PE IK acm ir Rr r HT OE TE T
na ee NDDN
_ ) m cc E AAN
- ut BTMO.
5 4 ri YEE
- rv ee 4CNP5 SE ( Sate n 1 o o 0 ox Nhtix cA 4 v i -
uh U e io h ec / W e n 3 ri Reoni t 2 .
m t 0 cb Etnsb i 7 b 1 ai Gs i o 7 F e B t - oft a r e 0ffo n 2 y a I 1o rG 8 5 c
- 6rD - 1 , h 1 API )
S ) Ltrn 1 U a Eaes 9 n m R pt 8 i n Ear 0t Fnru .
it c 2' lr -
ey
)OCKET NO. 50-266 UNIT NAME Point Beach Unit 1 DATE November 5, 1980 COMPLETED BY C. W. Fay TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL MONTH October, 1980 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 373 11 369 21 17s 2 372 12 360 22 37s 3 372 13 373 23 16s 4 374 14 372 24 152 5 373 15 372 25 373 6 371 16 374 26 375 7 374 17 373 27 375 8 373 _
18 376 28 375 I
9 372 19 374 29 375 10 372 2d 374 30 374 31 376 2
AD-28A (1-77)
DOCKET NO. 50-301 UNIT NAME Point Beach Unit 2 DATE November 5, 1980 COMPLETED BY C. W. Fay TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL MONTH October, 1980 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER-LEVEL FOWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 499 11 483 21 496 2 492 12 497 22 497 3 495 13 497 23 495 4 497 14 496 24 498 5 495 15 498 25 497 6 470 16 495 26 496 7 498 17 496 27 491 8 498 18 501 28 495 9 493 19 492 29 494 10 450 20 494 30 493 31 469 AD-28A (1-77)
1.
NARRATIVE
SUMMARY
'OF OPERATING EXPERIENCE
' Docket ~No . ~50-266' i,. ' Unit'Name Point-Beach Unit 1 Date .
Novimber.5, 1980 Completed By C. 't . Fay Telephone 414/277-2811 4
Unit- l' operated 'at 375 MWe net throughout the period with two load reductions. : Load was reduced to 283 MWe net for six hours on October 11 for turbine stop valve testing and was reduced to 300 MWe net for six hours on October 23 at the request of Power Supply.
Unit 1 operated its 33 billionth kilowatt hour on October 30.
Two 30-day licensee event reports were filed during the period. The first, Licensee Event Report No. 80-Oll/03L-0, clarified-the testing requirements for the testing of the 836A&B_ valves (containment spray addition valves) for. both
- units in accordance with the most restrictive requirements of ASaE Code Section XI or the Technical Specifications.
The Technical Specifications were judged the most restrictive and the testing was completed under those requirements. The report was-filed as a violation of Technical Specification 15.4.5.II.B.2. The second licensee event' report, Licensee
~
Event Report No.. 80-012/03L-0, was issued for.a gaseous release from a waste ' gas vent header. through a loose compression fitting on.the inlet to the pressure regulating valve. The release was insignificant (less than .0001% of the Technical Specification release limit) but was reportable as an abnormal degradation of the waste gas system in accordance with Technical Specification 15.6.9.2.B.2.
No major safety-related maintenance was performed during the period.
j
)
1 l
.. . , . _, _ _ , -__ l
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE Docket No. 50-301 Unit Name Point Beach Unit 2 Date November 5, 1980 Completed By C. W. Fay Telephone 414/277-2811 Unit 2 operated at 495 NWe net throughout the period with five load reductions. Lead was reduced to 470 MWe net for three hours on October 2 at the request of Power Supply; reduced to 490 MWe net for two hours on October 4 at the request of Power Supply; reduced to 327 MWe net for six hours on October 6 for turbine stop valve testings; reduced to 350 MWe net for five hours on October 9 at the request of Power Supply; and reduced to 450 MWe net for three hours on October 26 at the request of Power Supply.
Safety-related maintenance performed during the period consisted of replacement of the DC motor for the "C" charging pump and the annual 4D Diesel generator inspection and overhaul.