ML19340C491
Jump to navigation
Jump to search
| ML19340C491 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 11/10/1980 |
| From: | Burstein S WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML19340C492 | List: |
| References | |
| NUDOCS 8011170490 | |
| Download: ML19340C491 (1) | |
Text
_ _ _ _ _ _ _ _
O Wisconsin Electnc mmcoumr 231 W. MICHIGAN, P.O. B0X 2046. MILWAUKEE, WI 53201 November 10, 1980 Director of Regulatory Operations U.
S. NUCLEAR REGULATORY COMMISSION Washington, D. C.
20555 Gentlemen:
~~
I MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT 5
Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of October 1980.
Very truly yours,
^
^_
Executive Vice President Sol Burstein Attachment Copies to J. G. Keppler NRC Resident Inspector C. F. Riederer i?$
6%
8011170
'/9o
/t_