Forwards Insp Rept 50-010/72-01 on 720215-18,22,24,25 & 28. Noncompliance Noted
ML19340A987
Person / Time
Site: Dresden 
Issue date: 05/15/1972
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML19340A988 List:
References
NUDOCS 8009240805
Download: ML19340A987 (3)


See also: IR 05000010/1972001

Text

. . - - . .

-

-

-

-

. 1

3k 0n$0 hE

'

  • ^

- -

,

,

'

'

s.u c,

'

/

't

UNITED STATES

i

<,g

ATOMIC ENERGY COMMISSION

'

-

,,

F- (

DIRECr0 RATE OF REGUIATORY OPERATIONS

-

O,

REGION lla

~

f

ttstr$ e

799 ROOSEVELT ROAD

g

.

GLEN ELLYN, lLLINois 60137

usa) asa-asso

Iby 15, 1972

. ..

Coamonwealth Edison Company

Docket No., 50-10

ATTU: Mr. Dyron Lee, Jr.

Assistant to the President

P. O. Box 767

Chicago, Illinois 60690

Genticment

This refers to the inspection conducted by Mr. Ibura and Mr. Dreher of

this offico on Pcbruary U to 18, 22, 24, 25, and 28, 1972, c," activities

at Dresden Unit 1 authori::cd by AEC Operacing Licenco No. DPR . , and to

the discussions of our findings held by Mr. Ibura with IIr. 5.*orden of

your staff at the conclusion of the inspectica and on April 13, 1972.

Arcas examined during this inspection incicued the following:

1.

The results of control rod drive testing performed prior to startup,

~

nucicar tests perfor=cd follouing startup, containment sphere

penetration tests, and condencer vacuum sensors trip settings.

2.

Ibintenance performed on the primary secam drum safety valves,

control rod drives, and cmergency dicscl.

3.

Performance of hydro ecsts on the primary coolant cystem, the "A"

cicanup loop modificatica m2do during the spring of 1971, the high

proscuro piping of the core spray cystem, and the tube cido and

interconnecting piping of the new primary feedwater heaters.

4.

Statuc of the reviacd Volume 6, Plant Operating Procedurcs, and

planned spent fuci shipments.

5.

Quality Accurance/ Quality Control system impicmentation and records

for the inctallation of the core spray system, the modifications to

n

I. i

. ..

'Npg

n ..

S\\

-

L-a

-

.

.

- -;

Pim OnlGINAL

800924,o[pf

.

.

_ _ _ _ _ _ _ __

- - _ -_____-_____

'

.

.

.

.,

Commonwealth Edison Company

-2-

May 15, 1972

,

,

- 1

I

.

both cleanup loops, and the replacement of three primary feedwacer

heater bundlas.

6.

The relocation of the emergency condenser condensate valve operators

and the replaccment of the reactor Iiessel water level instrumentation.

Uithin these areas , the inspection consisted .of selective examination of

procedures and representative records, interviews with plant personnel,

and observations by the inspectors.

Scvoral items of apparent noncompliance with AEC requirements relating

to quality assurance and applicabic code requirements for plant

modifications were identified during this inspection. The items, uhich

ucre discussed with Mr. Worden during the April 13, 1972, aceting have

been referred to Regulato_y Headquarters for further consideration and

enforcement action. You uill be informed of their evaluation and

conclusion with respect to these natters.

It is our understanding based on discussion with your sito represcutative

that the following actions will be pursued or are currently in progress:

1.

The dicsci generator low oil temperature condition will be annunciated

-

in the control rom.

2.

A revica of the diesel generator system will be c:ade for the purpose

of identifying and annunciating those abnormal conditions which can

be detected in advance and which could prevent diccel operation.

3.

The revision of Volume 6, Plant Operating Procedures, including a

neu chapter on surveillance procedures, will be completed by July 1,

1972.

4.

A design review of the safety valves is being performed to confirm

that valve reaction forces were considered in the initial design

of their installation.

We will examine these matters further during a future inspection.

s

9

P00R BRIGINAL

.

4

__

--

_ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _

l

'.

,

Cocumwcalth Edison Cocipany

-3-

May 15, 1972

-

,

x

. .

.

Iso reply to this ictter is necessary; however, should you have any

questions concerning this inspection, we will be glad to discuss them

with you.

Siriccroly yours,

Boyce 11. Grier

Ecgicmal Director

cc:

W.1.'orden, Decaden Plant

Superintendent

,

bec:

J. G. Keppler, RO

R. H. Engelken, RO

A. Giambusso, L

P. A. Morris, R0

RO Files

DR Central Filar

PDR

-

NSIC

DTIE

.

s

.

e

.

.