ML19340A979

From kanterella
Jump to navigation Jump to search
Tech Spec 4.7.A.1.e(1) Defining Leak Rate Limits
ML19340A979
Person / Time
Site: Dresden Constellation icon.png
Issue date: 12/01/1973
From:
US ATOMIC ENERGY COMMISSION (AEC)
To:
Shared Package
ML19340A978 List:
References
NUDOCS 8009150637
Download: ML19340A979 (1)


Text

,

fm G

2 l/_ L1]i1TIRG CONDITION FOR OPERATION 4.7 SURVEILLANCE REQUlREMENT oo

c. Closure of the containment O

isolation valves for the purpone g

of the test shall be accomplished g) by the means provided for normal ct O

operation of the valves.

b5

d. The test duration shall not be
m. ~

Od less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for integrated 37 leak rate mehsurements, but shall be extended to a sufficient period of time to verify, by measuring the quantity of air required to return to the start-ing point (or other methods of equivalent sensitivity), the validity and accuracy of the CD leak rate results.

e. Acceptance Criteria for IPCLT 55458 (1) The maximum allowable leak rato, L shall not exceed p,

0.4 weight per cent of the contained air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at a.pressu re of 20 nsig.

crIEE hhh hI (2) The allowable operational I

1 m3T3B leak rate, L 'o (20 ), which t

"g{gP nhall be met prior to re-HUE numption of powcr operation following a test (either as meanured or following repairn j

and retent) nbc'll not execcd j

O.75 L p.

k B.ll-2

-