Forwards Insp Rept 50-010/72-04 on 721016 & 20.No Noncompliance Noted
ML19340A585
Person / Time
Site: Dresden Constellation icon.png
Issue date: 11/13/1972
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML19340A586 List:
References
NUDOCS 8008280643
Download: ML19340A585 (2)


See also: IR 05000010/1972004

Text

'

.

h . L .,,,

hr

'

..

.

o gel cs,

e

UNITED STATES

j

1

ATOMIC ENERGY COMMISSION

,

s

'

-

p

DIRECTOR ATE OF REGULATORY OPERATIONS

'G

p

REGION 111

-

Udm M

799 ROOSEVELT ROAD

TELEPHONE

.

GLEN ELLYN. ILLINOIS 60137

(312) 858 2660

November 13, 1972

Commonwealth Edison Company

Docket No. 50-10

ATrN

Mr. Byron Lee, Jr.

Assistant to the President

P. O. Box 767

Chicago, Illinois

60690

Gentlemen:

This refers to the inspection conducted by Mr. Fishbaugher on October 16

and 20, 1972, of activities at Dresden Unit 1 authorized by AEC Operating

License No. DPR-2, and to the discussion of our findings held by the

inspector with Mr. W. Worden and members of his staff at the conclusion

of the inspection. A copy of our report of this inspection is enclosed.

Areas examined during the inspection are described in the enclosed inspec-

tion report. Within these areas, the inspection consisted of selective

exanination of procedures and representative records, interviews with

-

plant personnel, and observations by the inspector.

No items of noncompliance with AEC requirements were identified within

the scope of this inspection.

We understand from discussions with your site management that prior to

resumption of operation of the Unit 1 reactor, you plan to complete the

installation work, preoperational testing and appropriate procedural

preparations associated with the core spray system. We will examine

your actions on these matters during a future inspection.

In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

,

enclosed inspection report will be placed in the AEC's Public Document

Room. If this report contains aoy information that you (or your contrac-

tors) believe to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such information

,8 008280

k)

jj

.

.

.

-

Commonwealth Edison Company

-2-

November 13, 1972

from public dicciosure. If such an application is submitted, it must

-

identify the basis for which information is claimed to be proprietary.

The application should be prepared so that proprietary information

identified is contained in a separate part of the document, since the

application will also be placed in the Public Document Room. If we do

not receive an application to withhold information, or are not otherwise

contacted within the specified period, the report will be placed in the

Public Document Room with a copy of this letter.

Unless you wish to make application to withhold information, no reply

to this letter is necessary; however, should you have any questions

concerning this inspection, we will be glad to discuss them with you.

Sincerely yours,

Boyce H. Grier

Regional Director

Enclosure

RO Inspection Report No. 050-010/72-04