| Site: | Dresden |
| Issue date: | 11/13/1972 |
| From: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Brian Lee COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML19340A586 | List: |
| References | |
| NUDOCS 8008280643 | |
| Download: ML19340A585 (2) | |
See also: IR 05000010/1972004
Text
'
.
h . L .,,,
hr
'
..
.
o gel cs,
e
UNITED STATES
j
1
ATOMIC ENERGY COMMISSION
,
s
'
-
p
DIRECTOR ATE OF REGULATORY OPERATIONS
'G
p
REGION 111
-
Udm M
799 ROOSEVELT ROAD
TELEPHONE
.
GLEN ELLYN. ILLINOIS 60137
(312) 858 2660
November 13, 1972
Commonwealth Edison Company
Docket No. 50-10
ATrN
Mr. Byron Lee, Jr.
Assistant to the President
P. O. Box 767
Chicago, Illinois
60690
Gentlemen:
This refers to the inspection conducted by Mr. Fishbaugher on October 16
and 20, 1972, of activities at Dresden Unit 1 authorized by AEC Operating
License No. DPR-2, and to the discussion of our findings held by the
inspector with Mr. W. Worden and members of his staff at the conclusion
of the inspection. A copy of our report of this inspection is enclosed.
Areas examined during the inspection are described in the enclosed inspec-
tion report. Within these areas, the inspection consisted of selective
exanination of procedures and representative records, interviews with
-
plant personnel, and observations by the inspector.
No items of noncompliance with AEC requirements were identified within
the scope of this inspection.
We understand from discussions with your site management that prior to
resumption of operation of the Unit 1 reactor, you plan to complete the
installation work, preoperational testing and appropriate procedural
preparations associated with the core spray system. We will examine
your actions on these matters during a future inspection.
In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the
,
enclosed inspection report will be placed in the AEC's Public Document
Room. If this report contains aoy information that you (or your contrac-
tors) believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such information
,8 008280
k)
jj
.
.
.
-
Commonwealth Edison Company
-2-
November 13, 1972
from public dicciosure. If such an application is submitted, it must
-
identify the basis for which information is claimed to be proprietary.
The application should be prepared so that proprietary information
identified is contained in a separate part of the document, since the
application will also be placed in the Public Document Room. If we do
not receive an application to withhold information, or are not otherwise
contacted within the specified period, the report will be placed in the
Public Document Room with a copy of this letter.
Unless you wish to make application to withhold information, no reply
to this letter is necessary; however, should you have any questions
concerning this inspection, we will be glad to discuss them with you.
Sincerely yours,
Boyce H. Grier
Regional Director
Enclosure
RO Inspection Report No. 050-010/72-04