Letter Sequence Other |
|---|
|
Results
Other: 05000302/LER-1978-037, Forwards LER 78-037/01T-1, 05000302/LER-1978-037-01, /01T-0:on 780804,B&W Reported That Atypical Weld Matl May Have Been Used in Constructing Plant Reactor Vessel.No Hazard to Health and Safety Determined, ML19308D758, ML19317G782, ML19317G791, ML19319D197, ML19340A474, ML19340A475, ML20062C376
|
MONTHYEARML19319D9191978-08-0202 August 1978 Proposed Amend 59 to License DPR-54,revising Tech Specs Re Pressurization,Heatup & Cooldowm Limitations Per App 6 10CFR50.Class III Fee Encl Project stage: Request 05000302/LER-1978-037-01, /01T-0:on 780804,B&W Reported That Atypical Weld Matl May Have Been Used in Constructing Plant Reactor Vessel.No Hazard to Health and Safety Determined1978-08-11011 August 1978 /01T-0:on 780804,B&W Reported That Atypical Weld Matl May Have Been Used in Constructing Plant Reactor Vessel.No Hazard to Health and Safety Determined Project stage: Other ML19308D7581978-08-14014 August 1978 Confirms 780814 Telcon Re Possible Use of Atypical Weld Filler Wire.Requests Info Re Interim Measures,Operational Safety Assessment & Commitment to Maintain Interim Measures Pending Resolution of Issue Project stage: Other ML19317G7821978-08-16016 August 1978 Amend 22 to License DPR-54,revises Tech Specs Re RCS Pressure Temp.Tech Specs Encl Project stage: Other ML19317G7761978-08-16016 August 1978 Forwards Amend 22 to License DPR-54,safety Evaluation & Notice of Issuance Project stage: Approval ML19317G7871978-08-16016 August 1978 Safety Evaluation Supporting Amend 22 to License DPR-54 Project stage: Approval ML19317G7911978-08-16016 August 1978 Notice of Issuance & Availability of Amend 22 to License DPR-54 Project stage: Other ML19340A4721978-08-18018 August 1978 Responds to NRC 780814 Request for Info Re Possibility That Atypical Weld Wire Used in Mfg of Reactor Vessel.Until Determination Is Made,Util Will Operate on Assumption That Wire Was Used & Start Corrective Action Project stage: Request ML19308D9381978-08-18018 August 1978 Forwards Response to NRC 780517 Request for Addl Info Re Movement of Heavy Loads Near Spent Fuel Project stage: Request ML19340A4741978-08-22022 August 1978 Forwards Revised Operating Curves,Tech Specs Promised in Util Re Reactor Vessel Atypical Weld Matl & Bases for Tech Specs Project stage: Other ML19340A4751978-08-22022 August 1978 Revised Tech Specs 3/4.4.9 Re Operating Curves.Curve Diagrams & Bases for Tech Specs Encl Project stage: Other ML19319D1971978-08-31031 August 1978 Notifies of 781101 Possible Completion Date for B&W Chemical Analysis of Reactor Vessel Surveillance Matl to Determine Whether Atypical Weld Matl Used.Outlines Action to Be Taken on Results Project stage: Other 05000302/LER-1978-037, Forwards LER 78-037/01T-11978-09-0101 September 1978 Forwards LER 78-037/01T-1 Project stage: Other ML19308D8331978-09-0101 September 1978 Provides Review of Revised pressure-temp Operating Limits & Finds Them Acceptable.Amend Classification Form Encl Project stage: Approval ML20062C3761978-10-31031 October 1978 Forwards Tech Spec Change Requests 27 & 34,requesting Amend to App a of License DPR-72.Changes Concern Reactor Coolant Pump Power Monitors & Revisions to Heatup,Cooldown & Inservice Leak & Hydrostatic pressure-temp Curves Project stage: Other ML19257C7951980-01-28028 January 1980 Requests Withdrawal of 781031 Tech Spec Change Request 34 & Licensing Fee,Due to NRC Approval of BAW-1566, Evaluation of Atypical Weldment. Certificate of Svc & Affidavit Encl Project stage: Withdrawal 1978-08-18
[Table View] |
Text
__
(^v') ;
e t t~ c -
y,$h;?,,',l'y; a; <
, c-
?
e.-. k. R _
-t s
R 'i;,v.
Y, iX:.c;- ;i."
- qms -
Powe.04 r-Coneon47 August 22,- 1978
~
Mr. Rob'ert W. Reid, Branch Chief Operating Reactors Branch #4 Division of Operating Reactors
~.
U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. -DPR-72 Reactor Vessel Atypical Weld Material
Dear Sir:
In my letter of August 18, 1978,' I stated that "In the event that the atypical weld wire was used in the manufacture of the Crystal River Unit 3 reactor vessel, Florida Power Corporation is administratively employing revised pressure-temperature heatup, cooldown, and inservice leak and hydrostat.% test curves to ensure the reactor vessel integrity." Attached
. are those revised operating curves, the Technical Specifications of which they are a part, and the Bases for that Technical Specification.
If you require any further information, please contact this office.
Sincerely, FLORIDA P0 ER CORPORATI
~
dhM W. P. S tewart RMB/WPS/ hew Attachment File:
.3-B-1 M04 (8/21) 8004070 1 General Office 3201 Thiny-fourin street sourn. P O Box 14042. St Petersburg. Fionda 33733 813 - 866-5151
4 1
STATE OF FLORIDA COUNTY OF-PINELLAS
.e W.P. Stewart states that he -is the Director, Power Production, of Florida _ Power Corporation; that he is authorized on the part of
said company to sign and ' file with the Nuclear Regulatory Commission' the information attached hereto; and that all such 2
statements made and matters set forth therein are true and
~
4 correct to the best of his knowledge, information and belief.
kdCNL t
W.P. Stewart Subscribed and sworn to before me, a Notary Public in and for the State and County above named, this 22nd day of August, 1978.
i LfL Notary PuYlic
' Notary _ Public, St_ ate of. Florida at Large, My Commission Expires: July 25, 1980-