ML19340A415
| ML19340A415 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 07/20/1977 |
| From: | Beatty G FLORIDA POWER CORP. |
| To: | |
| References | |
| NUDOCS 8003260731 | |
| Download: ML19340A415 (2) | |
Text
..
I d
Ym l
So -gog e
l x
~'
\\
EA N Telegram mestem union 1
AAA151(1242)(2-031369E201)PD 07/20/77 1242
)
l ICS IPMMTZZ csp DUPUCATE OF TELEPHONE TELEGRAM' 9047956486 TDMT CRYSTAL RIVER FL 122 07-20 1242P EST
)
l PMS NORMAN C MOSELEY DIRECTOR COPY MESSAGE, FONE USNRC REGION 2 0FFICE OF INSPECTION AND ENFORCEMENT 230 PEACHTREE 3
)
ppfs#
ST NORTHWEST SUITE 818 j [yp3,7 2%
M
)
f ATLANTA GA 30303 g
REFERENCE DOCKET #50-302 LICENSE DPR-72 AC D W-
}
l PURSUANT TO ENVIRONMENTAL TECHNICAL SPECIFICATIONS 2.4.2.G AND K,
~
j 5.6.2. A AND STANDARD TECHN' CAL SFECIFICATION 3.3.2.1 TABLE 3.5-3,
)
THIS WILL CONFIRM A REPORT TO MR HUGH VANCE OF YOUR OFFICE, AT 1045 ON 20 JULY 1977 THAT AT 1233 ON 19 JULY 1977 IT WAS DISCOVERED THAT J
i A 22 MINU,TE UNMONITORED RADIO ACTIVE RELEASE OF.739 CURIES NOBLE GAS WAS RELEASED TO THE ATMOSPHERE AT THE RATE OF 559.5 MICR0 CURIES jl i
PER SECOND. REACTOR BUILING PURGE IN PROGRESS WITH RADIATION MONITOR l
simi tm
)
a m
1 l
8003260 73/
4#
i N
w f5 f
V i
'7
~
. u."
l g
I
)
mu Tel ram mestem uniod s*
)
)
RMAI INOPERATIJE. IMMEDIATELY UPON DISCOVERY THE PURGE WAS
)j DISCONTINUED. THE HEALTH AND SAFETY OF PLANT AND PUBLIC WERE NOT i
AFFECTED DUE TO ATMOSPHERIC DILUTION. A DETAILED REPORT WILL FM. LOW 3l WITHIN 15 DAYS 1
~
G P BEATTY JR NUCLEAR PLANT MANAGER
).
NNNN l
i
}
l
)l
\\
)
3, y >.
^
e
.