ML19340A408
| ML19340A408 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 06/27/1977 |
| From: | Beatty G FLORIDA POWER CORP. |
| To: | |
| References | |
| NUDOCS 8003260726 | |
| Download: ML19340A408 (2) | |
Text
. _
l.
i
'\\
(g f]g
\\
soaos l
l g
7.-
i J.a i
)
~.sh.sm.m 4Telegr,am.
iaestem union i
g
)l AABG77(9804)(2-BB846BE 178)PD 96/27/77 8800 ICS IPMMTIZ CSP i
4f [
3 984795 6486 TDMT CRYSTAL RIVER FL 86 96-27 8800 A EST PMS NORMAN C MOSELEY, DIRECTOR ~
7 3,
US NRC REGION 2 0FFICE OF INSPECTION AND ENFORCEMENT, RDM, REPORT DELIVERY BY MAILGRAM, DLR, DLR
)
238 PEACHTREE ST NW SUITE 818 t
ATLANTA GA 38383 3
l REFERENCE DCCKET #58-382 LICENSE DPR-72 l
PURSUANT TO ENVIRONMENTAL TECHNIC AL SPECIFICATION 5.6.2. A THIS WILL 3
CONFIRM A REPORT TO MR T N EPPS OF YOUR OFFICE AT 210e ON 26 JUNE
'1977 THAT AT 8115 ON THAT DATE Ak UNPLANNED RADIO ACTIVE GAS RELE ASE 3
OCCURED. VENTING MAXEUP T ANX TO LOW PRESSURE HE ADER IN PROGRESS. THE MAXIMUM INSTANTANECUS RELEASE RATE AT THE PEAX OF THE DISCHARGE 3
PROFILE WAS 8 PERCENT OF THE MOST RESTRICTIVE LIMIT SET FORCE IN s.sses esen 3[
i 8003260]hk e
-m e--w-w-a, v wm-w~_
~
~.
,m 1
T' ' '.
Aa
.N l
.'g, _.39 r! ',
)
E.ma u thestern union iTelegram
)
. s 1
I
)
SPECIFIC ATION 2.4 2. A. (1). INVESTIGATION OF CAUSE FOR CORRECTIVE
)
ACTION IN PROGRESS. HE ALTH AND S AFETY OF PLANT AND PUBLIC WERE,NOT EFFECTED.
n 3
G P BEATTY JR., NUCLE AR PLANT M AN AGER
)
(CRYST AL RIVER UNIT 3 FLORID A POWER CORP PO BOX 1228 CRYSTAL RIVER FL 32629)
NNNN
)
3
)
)
T D
? ', ft w_.- -
.