ML19339D033

From kanterella
Jump to navigation Jump to search
Forwards LER 81-006/03L-0
Date released: 12/19/2019 Download: ML19339D033


LER 81-006/03L-0:on 810115,when Main Steam Line Isolation Valve F028C Reopened During Test P.T.1.3.1P-2,main Steam Line C Indicated Min Flow.Cause Undetermined.Investigation Will Be Performed During Future Outage
ML19339D035
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 02/05/1981
From: Pastva M
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19339D035 (1)
Forwards LER 81-006/03L-0
ML19339D032
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 02/05/1981
From: Dietz C
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19339D032 (1)