Forwards IE Insp Repts 50-352/80-12 & 50-353/80-10 on 800616-27 & Notice of Violation
ML19339C753
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 08/27/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML19339C741 List:
References
NUDOCS 8011190319
Download: ML19339C753 (2)


See also: IR 05000352/1980012

Text

-O

' G' .. ,

.

UNIYED STATES

.,

, - * *

NUCLEAR REGULATORY COMMisslON

f ;,l, T I

REGION 1

m '

gg,-

A

S\\.

'g

438 # ARK AVENUE

'

KING O.' PR USSI A, PENNSYLV ANI A 19406

%, V...../

AUS 27 33

Occket Nos. 50-352

50-353

Philadelphia Electric Company

AT7N: Mr. John S. Kemper

Vice President

Engineering and Research

2301 Market Street

Philadelphia, PA 10101

Gentlemen:

Subject: Combined Inspection 50-352/80-12; 50-353/80-10

This refers to the routine inspection conducted by Mr. J. Mattia of this

office on June 16 - 27, 1980 at Limerick Generating Station, Units 1 and

2, Limerick, Pa. of activities authorized by NRC License Nos. CPPR-106

and CPPR-107 and to the discussions of our findings held by Mr. Mattia

with Mr. V. Boyer and other PECo personnel at the conclusion of the

inspection.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report whien is enclosed with this

letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, measurements made by the inspector, and observations by the

inspector.

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with NRC requirements,

as set forth in the Notice of Violation, enclosed herewith as Appendix

A.

These items of noncompliance have been categorized into the levels

as described in our correspondence to you dated December 31, 1974.

This

notice is sent to you pursuant to the provisions of Section 2.201 of tha

NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires ycu to submit to this office, within thirty (30)

days of your receipt of this notice, a written statement or explanation

in reply including:

(1) corrective steps which have been taken by you

and the results achieved; (2) corrective steps which will be taken to

avoid further items of noncompliance; and (3) the date when full compliance

will be achieved.

8011190

319

__

'

.'

.

.

15373::

Philadelphia Electric Company

2

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10. Code of Federal Regulations, a copy of this letter and the enclosures

will be placed in the NRC's Public Cocument Room.

If this report contains

any information that you (or your contractor) believe to be proprietary, it

is necessary that you make a written application within 20 days to this

office to withhold such information from public disclosure. Any such application

must be accompanied by an affidavit executed by the owner of the infornation,

which identifies the document or part sought to be withheld, and which

contains a statement of reasons which addresses with specificity the items

which will be considered by the Commission as listed in subparagraph (b)

(4) of Section 2.790.

The infonnation sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If

we do not hear from you in this regard within the specified period, the

report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

h w. n

Robert T. Carls'n,

ief

-

Reactor Construction and Engineering

Support Branch

Enclosure: Appendix A, Notice of Violation

cc w/ encl:

V. S. Boyer, Senior Vice President, Nuclear Power