. _. -
.O OPERATLNG DATA REPORT i
oo q --
,y y
,r4 g
h l
DOCKET NO.
50-321
. Lfi
[d /.h 4
_ d t U b Lb DATE 11-10-80
.co COMPLETED BY P.
R-
a d e rwood TELEPHONE 912-367-7781 OPERATING STATUS Notes
- 1. Unit Name:
Hatch 1
- 2. Reporting Period:
10-80
- 3. Licensed Thermal Power l\\lwt):
2 '.1 A SO' 1
- 4. Nameplate Rating (Gross Mwe):
777 3
- 5. Design Electrical Rating (Net 31We):
.y_
796.3
- 6. Maximum Dependable Capacity (Gross MWe).
764.3
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
l
- 9. Power Luel To Which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions.If Any:
This Month Yr to.Date Cumulatise 749 7320 42384
- 11. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Critical 715.I 6308.3 32106.4
- 13. Reactor Resene Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator On.Line 676.0 59?o.1 30097.5
- 15. Unit Resene Shutdown Hours 0.0 0.0 0.0 1375555 12964362 63317397
- 16. Gross Thermal Ener;y Generated (MWH)
A%000 4223710
_ 20494670 i
- 17. Gross Electrical Energy Generated (MhH)
- 18. Net Electrical Energy Generated (MbH) i1 m ions 2 c, 19486759
- 19. Unit Sen-ice Factor 90.7 79.6 71.0 i
- 20. Unit Asailability Factor on.7 79.6 71.0 73.4 71.9 60.2
- 21. Unit Capacity Factor (Using \\lDC Nett
- 22. Unit Capacity Factor iUsing DER Net) 72.?
70.7 59.I
- 23. Unit Forced Outage Rate o.3 20.4 20.7
- 24. Shutdownsseheduled oser Nest 6 Months (Type.Date.and Duration of Eacht:
- 25. If Shut Down 4: End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Statuu Prior io Commercial Operationi:
Forecast Achiesed INITIA L CRITIC A LITY INITIA L ELFCTitlCITY COMMERCI \\ L OPER A TION
. e,g,
80111'00 29.3
AVERAGE DAILY UNIT POWER LEVEL 9
DOCKET NO.
50-321
~
UNIT Hatch 1 DATE Il-10-80 COMPLETED BY P. R. Underwood TELEPHONE 912-367-7781 MONTH 10-80 DAY AVERAGE DAILY P6WER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe-Net t i
745 g7 299 2
742 18 564 3
745 19 567 4
751 20 571 5
757 21 573 6
751 572 7
750 23 570 8
749 24 569 9
744 25 561 10 741 26 600 11 730 27 573 12 14 28 390 13 450 433 23 14
, 555 30 476 15 82 3g 604 16
-17 a
i INSTRUCTIONS On this format.Est the aserage Jaily unit power levelin MWe Net for each day :n the reportine m. nth. Compute to the nearest whole mepwatt, pH77i
i 50-171 DOCKET NO.
UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT N A%1E
__1Li' b
DA1E Il '"
COMPLETED fly l' R ' F "l" G".2L REPORT MONTH 10-80 TELEril0NE 912-ib /- / /MI b
~
j Licensee E.e, vb Cause & Corrective
.$j
" s' }[3oc Action to
~
j}
No.
Date E
Event
- 1 j
Prevent Recurrence e
o$
jdi Report #
iE u 54 801012 F
20.9 A
3 flA IIA VALVEX Rx scram due to TSV closure which was caused by a power load unbalance on rnain generator 55 801012 F'
17.1 A
5 f1A IIA VALVEX Unit on stcrtup ramp from above shut-
~
down #80-54 56 801012 F'
33.5 F
5 f1A ZZ ZZZZZZ Management limitation of 75% thermal power 57 801015 F
7.1 A
5 flA IIA GEtlERA Reduction of load due to generator ground fault alarm q
M 58 80-1015 F
45.5 A
1 flA flA GEtlERA Unit off line to investigate ground fault alarm in #80-57 W
59 801016 F
19.4 A
5 flA IIA GEllERA Unit on startup ramp from above shut-d down, #80-58 Wd 4
3
@ l 2
Method:
Exhibit G. Instructions Renonhment railure(Expt In)
F: Forced 1 Manual for Preparation of Data A Liui 2-Manual Scram.
Entry Sheets for Litenter 5: Scheduled
@d, 5 Maintenance of Test 3-Automatic Scram.
Event ReporIILER) Eile INUPEG-C-Refueling p= r D-Regulatory Restriction 4 -Continuations 0161)
(C--2;.
E Operator Tralning A IJcense Essadnation 5-Ioad hx1uction 5
F Administrative 9 h (Mlain)
Exhibit I.Some Source
- 4-G4)persilonal Errue (Emplain)
(9/77)
Il4)ther (Emplain)
I
T O. __
UNIT SilU1 DOWNS AND POWER REDUCTIONS DATE Il '" "1 b
ih"h" *"d COMPLET ED llY REPORT MON 111 10-80 TELEril0NE J l 7- % /- / / 31 n.
Cause & Currective
.EE
}
Y Licensee Et Action to j
.,Q
.g g a:
Event No.
Date j
Prevent Recurrence m
al g175g Report #
g o,,,,
60 801018 F
166.8 F
5 NA ZZ ZZZZZZ Management limitation of 757, thermal power 61
- 801024 F
5.8 D
5 NA flE TURBIN Reduced load t5 perform weekly turbine test 62 801025 F
107 F
5 NA
~ZZ.
ZZZZZZ Management limitation of 75% thermal power 63 801029 F
5.4 A
5 i- ' NA.
HA GENERA Reduced load because of generator ground fault alarm 64 B01029 F
2.6 A
1 NA HA GENERA Unit off line to investigate ground fault alarm in #80-63 65 801029
) F 12.2 A
5 NA HA GENERA Unit on startup ramp from above shut-
~
i down #80-64 I
2
~
3 4
Method:
Exhibit G. Instructions 1 Manual for P cparation of Data F: Forced Reawn:
5: Scheduled A liquirment railure(Explain) 2 Manual Sctsm.
Entry Sheels fur I.kensee
[14f aintenance of Test 3 Automatic Scram.
Event Report (LE Ri rite t NURIG-C Refueling 4 -Cbntintritions 01611 D-Regulatory Restriction E-Operator Training & Ucense Examination 5-Ioad Peduction 5
F Adndnistrative 9-Other (Explain)
Enidbit I-Same Source Goperational Error (Esplain) l (9fM)
Ilother(Emplain)
DOCKEiNO.
2L UNIT Sil0TDOWNS AND POWER REDUCTIONS UNil N AME DATE II-I"-M4 COMPLETED llY P 'Uhld IC11:!d REPORT MON 111 10-80 TELEril0NE 9I7-M/-//H1 e.
B E
Cause & Corrective Licensee E r, h
.$E
}
].!fIi g5 Event is 3 n3 Action to l
No.
Date i
sg
$5 2
0ge Report #
58 0
!U Prevent Recurrence H
2 3
v d
66 801030 F
37.5 F
5 NA ZZ ZZZZZZ Management limitation of 80% thermal power i
l l
4 3
I 2
Method:
Exhibit G-Instructions F: Torced Reason:
1 Manual for Preparation of Data S: Scheduled A I:quipment railure(Explain) 2 Manual Seeam.
Entry Sheets for I kensee B Maintenance of Test Esent ReporiILEnl File (NUREG-3 Automatic Scram.
C Refueling 4 -Cont inuations 01611 D Regulatory Restriction E-Operator Training & License Examination 5-Ioad Pcduction 5
F Administrative 9-Other (Explain)
Exhibit I.Same Source Coperational Etrue(Explain)
(9/77) 110 her(Explain)
NARRATIVE REPORT UNIT 1 1
Oct. 12th At 00:33, Rx scram due to TSV closure which was cause4 by a
power load, unbalance on main generator Oct. 12th Unit on startup. ramp from above shutdown; Rx critical at 09:38 and generator on line at 21:26; unit returned to management limitation at 14:30 on 801013 Oct. 13th Unit limited to 75% thermal power by management Oct. 15th Reduced load because of generator ground fault alarm Oct. 15th Unit off line at 07:06 to investigate generator ground fault alarm; Rx in H/S at 17:15 Oct. 16th Unit on startup ramp from above shutdown; Rx critical at 14:05 and generator on line at 04:38 en 801017; unit returned to management limitation at 24:00 pn 801017 Oct. 18th Unit limited to 75% thermal power by management Oct. 24th At 22:45 reduced load to perform weekly turbine test; returned to management limitation at 04:30 on 801025 Oct. 25th Unit limited to 75: thermal power by management Oct. 29th At 14:30 reduced load because of generator ground fault alarm Oct. 29th At 19:52 unit off line to investigate generator ground fault alarm; unit returned on line at 22:27 Oct. 29th Unit on startup ramp from above shutdown; unit returned to management limitation at 10:30 Oct 30th Unit limited to 80% thermal power by management There was no single release of radioactivity or single radiation exposure which accounts for more than 10" of the allowable annual values during October of 1380.
1 i
r
~
w
HATCH 1 SAFETY - RELATED MAINTENANCE REQUESTS TO BE REPORTED FOR OCTOBER 1980 NUMBER DATE COMPLETED uCRIPTION 80-5054 10-15-80 MachineT
of head shaft on
~~
P41-COC).
per letter from John-ston pump 80-4768 '
10-15-80 Repaired P41-C001A pump internals 80-4128 10-9-80 Repaired railrbad airlock doors.
Indicating lights were not oper-ating properly 80-4963 9-26-80 Repaired HPCI minimum flow valve E41-F012; valve operators were not functioning properly due to binding contact 80-3868 10-21-80 Replaced N62-N009A&B analyzer vacuum regulator per DCR 80-207 l
9
cm/2 a e wr ccmcany Post 0" ce ec4 4J2 B3=PV C: 'r; a 31513
% ecrcre P 2167 7'81
- 137 9444 m
Georgia Power Edwin L Hatch Nuclear Plant e=
cenmac 2,c:. m November 10, 1980 PM-80-1096 PLANT E.
I.
HATCH NRC Monthly Operating Report Office of Plans and Schedules Directorate of Licensing United States Nuclear Regulatory Commission Washington, D.
C.
20545
Dear Sir:
Per Tech Specs section 6.9.l.6 please find attached the NRC Monthly Operating Report for Hatch Unit 2,
Locket #50-366.
~
/
M.c unt?
Plant Manager CLC/pebc i
l
l l
OPERATING DATA REPORT DOCKET NO. 9 '4 DATE lt-to-60
,COSIPLETED SY P.
R.
Underwood
?
912-3o7-1781 TELEPHONE OPERATING STATUS N' hk @ W s b Haeeh 2
- 1. Unit Name:
numbers 17. and 18. reflect 10-80
- 2. Reporting Period:
an adjustment of 130 MWe.
2436
- 3. Licensed Thermal Power (SIWt):
This adjustment is due to 817.0
- 4. Nameplate Rating (Gror$ 5tWel:
a typographical error in 784.0
- 5. Design Elecreical Rating (Net SlWel:
09-80 report.
805 7
- 6. Maximum C ependable Capacity (Gross SIWE):
772.7
- 7. Maximum Dependable Capacity (Net SIWE):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since t ast Report. Give Reasons:
- 9. Power Level To Which Restricted. If Any (Net SlWe):
- 10. Reasons For Restrictions.If Any:
I i
l This Month Yr to.Date Cumulative I.
745 7320 10153
!!. Hours in Reporting Period 717.1 5567.2 8230.7
- 12. Number Of Hours Reutor Was Critiesi 0.0 0.0 0.0
- 13. Reactor Resene Shutdown Hours 697.6 5271.0 7685.5
- 14. Hours Generator On-Line 0.0 0.0 0.0 1'
- 15. Unit Reserve Shutdown Hours 1494254 11601014 17095076
- 16. Gross The-mal Energy Generated.(alWH) 483290 3830650 5666610
- 17. Gross Electrical Energy Generated (SIWH) 461051 3650398 5407535
- 18. Net Electrical Energy Generated (5thH) 03.6 72.0 75.7
- 19. Unit Service Factor 93.6 72.0 75.7 80.1 64.5 68.9
- 20. Unit Availability Factor
- 21. Unit Capacity Factor iUsing SIDC Net) 78.9 63.6 67.9
- 22. Unit Capacity Factor (Using DER Net) 6.4 12.4 11.8
- 23. Unit Forced Outa;e Rate
- 24. Shutdowns Scheduled Over Next 6 Slonths tType. Date.and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Uni 3 In Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIA L CRITICALITY INITIA L ELFCTRICITY Coil \\lERCIAL Ol'FR A TION (4/ m ew-y.
e
-y.
-...t---
=
AVERAGE DAILY UNIT POWER LEVEL 9
DOCKET NO.
50-366 UNIT' Hatch 2 DATE 11-10-80 J
j COMi LETED BY P. R. Undervood TELEPHONE 912-367-7781 4
MONTH 10-80 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net)
I 106 17 694 2
548 gg 665 3
605 19 745 4
741 20 747 5
768 746 21 6
771 22 673 7
780 23 510 3
754 24 8
9 118 25 474
)
10 143 26 761 11 524 7
706-3 709 g
737 13 740 29 731 l4 678 30 730 IS 719 4
31 670 16 709 i
INSTRUCTIONS On this n>rmat. list the aserage daily unit power leselin MWe Net for each day in the reporting m.. nth. C.napute to the neares: shu megawatt.
19 77) 4 9
s a en m
.m -
4
.e
~
.g.
y
.--m
.,-y....,e,p..
n-s _ _ -4 y
l l
l D
3 UNIT SilUTDOWNS AND POWER REDUCTIONS U
I I ~ I"
- DATE Td.
I.' : k"n"'E COMPLET ED IlY 912-S'N 10-80 REPORT MON 11I TELEril0NE l
c a
" '1, Cause & Corrective Eg
}
- Y3 Licensee E*
l g
Action to 3g&
Event ign Q
N..
Date gg Prevent Recurrence F
oE 5
j6 Report #
g 40 801001 F
10.5 A
5 t{A HC llTEXCil Unit on startup ramp from previous shutdown #80-38 41.
801001 F
11.1 A
1 NA HA VLAVEX Rx scram due t'o TSV closure which tripped turbine on IIWL i
42 801001 F
13.4 A
5 NA ilA VALVEX Unit on startup ramp'from above shut-down #80-41
~
i 43 801003 F
15.5 D
5 NA RB C0flROD Reduced load in order to perform a rod pattern adjustment 44 801008 F
6.3 A
5 NA Cil HTEXCH Reduction of load because of problems with feedwater heaters 45 8001009 F
15.7 A
1 NA HH PUMPXX Rx scram due to condenser booster pump trip on low suction woich tripped the RFPs 3
4 I
2 Method:
Exhit:i' G - Inst ructions F: Forced Reason:
14f anual for Prtparation of Data A li "irment railure(Explain)
S: Schedu!cd 84taintenance of Test 2-Manual Scram.
Entry Stieets for 1.itensee t
- 3. Automatic Scram.
Event Report (LElt! Fde INUREG-C. Refueling D Regulatory Restriction 4 -Continuations 0161)
E-Operator Training & Ucense Examination 5-Ioad reduction 5
F-Administtative 9-Other (Explain)
Exhibit I Same Source Goperational Errut (Explain)
(9/77) flother(Exp! sin) l
l
(
DOCKETNO.
- 3 fig, I'
UNIT SIIUTDOWNS AND F0WER REDUCTIONS UNII N. ole DATE _.i'-I"-IJ COMPLETED 11Y IL."._"' i.t.':c.14:1
'3 8 ' ' / - / / H I 10-80 TELErilONE REPORT MONT1I s
n.
E E
E "ll:
}
Y3 Licensee Ee E7 Cause & Currective f
].g5 Event 5Y El Action to No.
Date 8.
Eg rN 0 0
Psevent Recurrence E
$5 M
jgjg
' Report #
46 801009 F
49.8 A
5 NA ilC llTEXCil Unit on startup ramp f rom above shut-down #80-46 47 801017 F
8.6 0
5 NA RB' CONROD Reduced load in order to perfonn a rod pattern adjustment HC HTEXCil Reduced load to investigate possible 48 801022 F
14.6 A
5 NA i
tube failure in condenser 49 801023 F
5.6 A
5 NA HF llTEXCil Reduced load to repair leak in water-box 50 80'1024 F
20.6 A
3 NA IIF HTEXCli Unit off line and shutdown to repair leak in waterbox 51 801024 F
23.6 A
5 NA liF HTEXCH Unit on startup ramp from above shut-down #80-50 4
3 4
I 2
Met! od:
Exhibit G. instructiens F: Forced Reason:
I4f anusi for I reparation of Data 5: Scheduled A.14:uirment railure(Explain) 24hnual Scram.
Entry Sheets fer Litensee
[14bintenance of Test J-Automarle Scram.
Event Repura (LE RI File INUREG-C Refueling 4 -Continuations 0161)
D Regulatory Restriction E-Operatur Training & Ucense Examination 5-Inad Pcduction 5
F AdmlnistsatIve 9-Other (Dcplain)
Exhibit 1 Same Source GOperational Error (Emplain)
(9/77)
ItOther(Emplain)
l r
DolKET NO.
5f'.F' UNIT SilUTDOWNS AND POWER REDUC 110NS UNil f4A*1E Hh 7
DAIE _l1.ll'r.'
COMPLETED IlY L
'!""'~'"""I I
REPORT MON 11g 10-80 TELEPilONE 9 I P-3/- / / M i
"i E
.Ej
}
.Yf Cause & Corrective Licensee E-e, kh w
u Action to A}
y" N.a.
Date
{
w,
,, g oc Event U
Prevent Recurrence
$E a1 j di Report #
5Z 801031 S
5.3 C
5 NA ZZ ZZZZZZ Reduced load to shutdown for refuel-outage F
d l
I 2
3 4
Method:
Exhibli G. Insiemtions F: Forced Reauin:
A li uipment Failure (Explain) l-Manual for Preparation uIluta S: Scheduled t
(1412intenance or Test 2 Manual Scram.
Entry Sheets for 1.iientee C. Refueling 3-Auto;natic Scram.
Event Report ILERI file (NUREG-D-Regulatory Restriction 4.-Continuations 01611 1
E-Operator Training & License Enemination 5-Ioad Ihluction 3
F-Administr;tive 9-Other (Explain)
Enhibil I.Same Source Goperational Errot (Emplain)
(.777) liother(Espieln)
~
^
NARRATIVE REPORT UNIT 2 m
startbp ramp from previous
- shutdown, Oct. 1st Unit on fr 8 0 - 3 8.*,
Oct. 1st At 10:30 Rx scram due to TSV closure which tripped the turbine on HWL Oct ist Unit on startup ramp from above shutdown; Rx critical at 16:23 and generator on line at 21:37; unit returned to 80% rated conditions at 11:00 on 801002 Oct 3rd deduced load in order to perform a rod pattern adjustment Oct. 8th Reduced load at 21:45 because of problems with the FWHs Oct. 9th At 04:03, Rx scram due to condenser booster pump trip on low suction which tripped the RFPs i
Oct. 9th Unit on startup ramp from above shutdown; Rx critical at 13:18 and generator on line at 19:45; unit returned to 80% conditions at 21:30 on 8G1011 a rod pattern Oct. 17th Reduced load in order to perform adjustment Oct. 22nd Reduced load in order to investigate possible tube failure in condenser; no leak found; unit returned to 80% conditions at 10:00 on 801023 Oct. 23rd Reduced load to repair leak in waterbox Oct. 24th Unit off line at 01:07 in order to repair leak in waterbox; Rx in H/S at 02:15 l
Oct. 24th Unit on startup ramp from above shutdown; Rx critical at 15:00 and generator on line at 21:40; unit returned to 80 conditions at 21:15 on 801025.
Oct. 31st Reduced load going to shutdown for a scheduled refueling outage There was no single release of radi a te t ivity or s l a g '. ?
radiation exposure which accounts for more than 10 P.
of L.
allowable annual values during October of 1980.
I
HATCH 2 3AFETY - RELAZED MAINTE::ANCE REQUESTS TO BE REPORTED FOR OCTOBER 19 F '
NUMBER DATE COMPLETED DESCRIPTION 50-42T2 10-27;60 RHR/SW pump seal water line had developed leak; placed line back in proper fitting and tightened to stop leak 80-4177 10-23-80 IRM/APRM recorder motor and bad amplifiers were replaced to place recorder back in service 80-4182 10-24-80 Repaired PSW Div II pressure indicator; replaced output transmitter and calibrated 80-4129 10-24-80 Replaced alarm point card and white bulbs in the turbine oil tank level hi-low alarm; alarm lights had been found burnt out 80-4178' 10-22-80 High flow d/w floor drain sump annunciator was not functioning properly.
Replaced bad alarm card and veriftad proper operation 80-4139 10-23-80 High flow d/w fleor s urip annun-ciator would not tc2t properly; replaced point card and verified operation 80-4058 10-20-80 Chemical waste sample tank
" A
discharge valve to floor drain demin was found to be stuck and not working proper; repaired valve and verified operation 80-3966 10-20-80 Suspected D/G "2A" jacket coolant temp low annun. lights were out;
- however, upon investigation they were functioning properly 80-3325 10-20-80 Replaced nitrogen supply storage tank-safety relief valve because previous valve was found lifted 80-4002 10-13-80 Repaired loose connection on Nil-R6023; Locse connection was causing errati: readings l
?
80-3951 10-15-80 Celibrated Hil-P601 because instrument was abnormally alarming 30-3948 10-14-80 Main steam 3rd stg. SJAE "A"
flow q low alarm was not testing
- properly; replaced point card and verified operation 80-3947 10-15-80 Control b1dg after cooler B001A disch. temp. high alarm would not reset; found card not making good contact; repositioned card ad verified tiarm operations 80-2952 10-11-80 Valve T48-F323J failed to open properly during test; replaced solenoid and air line tubing 80-3632 10-13-80 Calibrated containment H022 analyzer and verified operation 80-3874 10-13-80 Calibrated RWCU "B" dP guage 80-3847, 10-13-80 23 RWCU pump was found blowing steam and water; pump sas disassembled and the bearing and mechanical seals were replaced; pump was rebuilt and placed back in service 80-2864 10-9-80 Adjusted torque limit switch on main steam line drain MOV 80-2770 10-7-80 Replace'd lead and lag switch on motor starter fo r reclaim pump; verified pump operation 80-3658 10-4-80 Replaced lat level multiplexer card in "A"
rod block monitor; monitor had been erratically going inop; verified operation 80-3935 10-8-80 Replaced alarm card on gen "B"
aux lockout alarm; verified operation 80-3857 10-3-80 Found valve on HCU-26-51 leaking; replaced v.tre 30-3330 10-4-80 Repaired fuel pool gate seal; replaced them
-and instelled a
check valve an the air,. apply to them
_am_
80-3824 10-7-80 Inspe ted alignment of diesel gene ra to r "A"
per Fairbanks Morse Company 80-3825 10-7-80 Inspected alignment of diesel
', generator "C"
per Fairbanks Morse Company
?.
80-1266 9-29-80 Pe r fo rmed wiring change to RCIC vacu"= and condensate pump motors per DCR 80-26 80-3835' 9-30-80 Added 2 additional supports and removed I
existing support to/from PSW Div I supply piping per DCR 80-342 80-4060 10-20-80 Removed safety relief valve to verify setpoint; replaced valve after check 80-4141 10-28-80 Removed valve operator and tightened face plate to alleviate looseness in precoat inlet isolation valve 80-4202 10-26-80 Replaced limit switches on "E"
valve on "A"
RWCU demin 80-4199 10-29-80 Found condensate flush valve for WSPS "B"
leaking by; rep; ced set screw and repositioned stem so valve would set properly 80-4224 10-29-80 Valve T48-F324 0-rings were repaired; cleaned 0-ring surfaces and replaced 0-Rings 80-2852 10-30-80 Replaced 2 gate driver cards in LPCI inverter a