__

(^) _ ' _

V OPERATING DATA R EPORT DOCKET NO.

50-302 DATE 31/3/250 COMPLETED BY M. W.

Culver TELEPHONE (904) / n-6486 OPERATING STATUS

1. U 2 f o ne:

Crystal River Unit 3 Notes

2. Reporting Period: 10/1/80 thru 10/31/80
3. Licensed Thermal Power (MWt):

24 0

4. Nameplate Rating (Gross MWe):

890

5. Design Electrical Rating (Net MWe): 825
6. Maximum Dependable Capacity (Gross MWe):

821

7. Maximum Dependable Capacity (Net MWe):

782

8. If Changes Occur in Capacity Ratings (Items Number 3 Thrt sh 7) Since Last Report.Give Reasons:

N/A

9. Power Level To which Restricted. If Any (Net MWe):

None

10. Reasons For Restrictions. If Any:

N/A This Month Yr.to Dete Cumulative 1

11. Hours in Reporting Period 745 7320 31896
12. Number Of Hours Reactor Was Critical 740.75 3285.29 18435.59 1
13. Reactor Reserse Shutdown Hours 4.25 12.32 1129.22

)

14. Hours Generator On Line 739.2 3220.55 17920.75
15. Unit Reserve Shutdown Hours 0

0 0

1716479 7055644 39372555 j

16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH) 580160.6 _,

2395899.2 13367667

18. Net Electrical Energy Generated (MWH) 551436_

2273428 12665068

19. Unit Service Factor 99.2%

44.0%

56.18%

99.2%

44.0%

56.18%

20. D:it Assi:ah:..:. ~

.r

21. Unit Capacity Factor (Uning MDC Neti 94.65%

39.72%

50.78%

22. Unit Capacity Factor (Using DER Net) 89.72%

37.65%

48.13%

23. Unit Forced Outage Rate 0.78%

9.15%

31.95%

24. Shutdowns Scheduled Oser Next 6 Months (fype. Date.and Duration of Each t:

None

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units In Test Status (Prior :o Commercial Operation):

Forecast Achiesed INITI4 L CRITICA LITY 1/14/77 INITIAL ELECTRICITY 1/30/77 COMMERCI A L OPER ATION M7 g

8 0 J J y g ggq

i l

l l

50-302 UNil SIIUIDOWNS ANI)POWI at REDUCTIONS DOCKElNO.

uni l' N AME FLCRP-3 DA1E 11/3/80 October COMPLETED BY

_.M_. W. Culver REPOR I~ MON ifl TELEPHONE (904) 795-6486 t

lr

? u,3 5

=

i E4 I scemcc g -e,,

g m.,

(,ause & (,inrective 2e 3

No.

D.it e g

3s

,g g y livent

o. 3 Acin,n in

$E 5

j@g Report 88 iS 0 U

Picsent Recurrence 6

80-17 801008 F

5.817 A

3 HA INSTRU During system switching, voltage reg-s ulator oscillation resulted in an overexcitation trip of the turbiae when the regulator was placed in

" test" position. The tripping of the turbine automatically tripped the reactor.

80-18 801009 S

13.08 11 N/A IIF MOTORX Reduced power to 75*. FP to modify the cooling water piping for CWP-ID motor.

80-19

'801010 S

16.38 11 N/A IIF MOTORX Reduced power to 75% FP to modify the cooling water pi iing for CWP-1A ar' or l

80-20 801011 S

11.13 11 N/A IIP MOTORX Reduced power to 75% FP to modify the cooling water piping for CWP-1B motor 80-21 801012 S

11.33 H

N/A ilF MOTORX Reduced power to 75% FP to maaify the cooling water piping for CWP-1C motor i

2 3

4 F: Fueced Reason:

Metimd:

Exlubit G-Instrucinins S: Scheduled A Equipment I ailure(Explain) 1 Manual fint Psep:ntion of Data B-Maintenance ne Test 2 Manual Scram.

Entrv She 'i-for Licemcc C. Refueling

3. Aniomatic Scram.

Evesit Rc;sni (LERI File t NIIRIG D Regulatory ite.ieiciion 4 Oiher (Explain) 01611 E-Operator Te.nnmg & License Examination F Administrative 5

G-Operational I isor (Explain t Eshibit I - Same Source 19/77) 11-O her (Expl.nni O

i l

UNil SilOIDOWNS AND POWlat REDUCTIONS I

NI NAME FLC

-3 DATE 11/3/80 October - Continued COMPLET ED BY

-M. W. Culver REPOR T MON ill TELEPHONE (904) 795-6486 i

iE 3

hE I it emcc

[ e,,

"L Cause & Correceive No.

Date y,

52

.2 s 5 Even

3. ~.'

u!]

o.

Atemn to

$E E

35!

Reportst id V Present Recurrence e

6 80-22 801013 F

3.37 A

N/A HA VALVEX Vibration problems on governor valve s required reduction of power to approx-miately 85% FP to close the valve.

i 80-23 801013 F

383.75 A

N/A IIA VALVEX Plant maximum power held to 95 - 97%

i FP because of governor valve vibration until valve reprogramming on 10/29.

f 80-24 801014 F

33.75 A

N/A IIC llTEXCH Reduced power to find a saltwater leak in "D" Condenser waterbox. Leak found and plugged.

i

)

80-25 801016 S

7.88 R

N/A

!!A VALVEX Reduced power to attempt reprogramming;

}

of governor valve.

I k

i 2

3 4

F: Forced Reason:

Metimd:

Exhibit G Instructions S: Scheduled A Equipment 1.nlure (E iplain) 1 Manual for Prepasation of Data B. Maintenance or Test 2 ManualScram.

Entry Sheets for Licensee C. Refueling 3 Antomatic Scram.

Event Report (LERl File (NURLG.

D-Regulatory 16.eriction 4 Olher (Explain) 0161)

E4perator To:monga Ucense Examinatum F Administrain.-

5 G Operational I not (Explain)

Eshibit I Same Source Pt/77)

Il Other (limpt uni e

~

4VERAGE Dally UNIT POWER LEVEL 50-302 DOCKETNO. _

FLCRP-3 UNIT 11/3/80 DATE COMPLETED BY M. W. Culver (904) 795-6486 TELEPHONE MONTH October DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Neti (MWe-Nett i

778 746 17 2

773 769 18 778 3

766 19 771 4

744 20 5

788 766 21 774 769 6

22 779 7

784 23 52p 755 3

74 770 772 9

25 678 10 793 26 597 11 2

664 l

12 771

  • s 13 651 779 29 672 14 791 30 648 796
  1. 5
i 16 773 INSTRUCTIONS On this format. list the average daily unit power leset in MWe Net for exh ds) in the reponing month. Cmnpute to the nearest whole megawait.

(9'771

MDEdLY OPERATIONAL

SUMMARY

STATEMENT DOCKET NO.

50-302 UNIT FLCRP-3 DATE 11/3/80 COMPLETED BY M. W. Culver TELEPHONE (904) 795-6486 MONTH October

SUMMARY

STATEMENT:

4 Crystal River Unit 3 operated near full power until the 13th of the month with the exception of one. outage and four power reductions. From October 13 to October 29 power was limited by a faulty governor valve and there was an additional power reduction un-related to the governor valve.

2 4

1 e *

.c..,

.n.

+r

.,