VIRGINIA ELECTRIC AND POWER COMPANY NORTH /NNA POWER STATION MONTHLY OPERATING REPORT MONTH September YEAR 1980 (Revised)
APPROVED:
- (
STATION MANAGER U
- 11070gyy
i OPERATING DATA REPORT 50-339 DOCKET NO.
DATE 10/74/R0 COMPLETED BY _ W. A. Woodsmall, II TELEPHONE 703-894-5151 OPERATING STATUS Notes
- 1. Unit Name:
North Anna
- 2. Reporting Period:
September 1980 (Revised)
Line 14 Revised
- 3. Licensed Thermal Power (MWt): _777A
- 4. Nameplate Rating (Gross MWe):
947 907
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
07R 898
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Chaages Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A -
- 9. Pcwer LevelTo Which Restricted.lf Any(Net MWe):
NfA
- 10. Reasons For Restrictions,if Any:
N/A k
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 770 2.02R p qpR
- 12. Number Of Hours R. actor Was Critical 476 R 1 211 9 1.213.2
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 459.4 514.4 514.4
- 15. Unit Reserve Shutdown Hours n
n n
615.501 659,318 659.31s
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH) 193.Rd6 202.0?0 70p.op0
- 18. Net Electrical Energy Generated (MWH) 177.547 184.109 1841109
- 19. Unit Service Factor N/A N/A N/A
- 20. Unit Asailability Factor N/A PIfA N/A tl/ A
- 21. Unit Capacity Factor (Using MDC Net)
N/A N/A
- 22. Unit Capacity Factor (Using DER Net)
N/A N/A N/A N/A N/A N/A
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eacht:
TMI and Fire Protection Modifications:
November 1.1980: 21 days ffaintenanen-Anril 1 1o91 11 a y,e
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
M/^
- 26. Units in Test Status (Prior to Comrnercial Operationi:
Forecast Achiesed 6/12/80 INITIAL CRITICA LITY INITIA L ELECTRICITY 8/25/80 COMMERCIAL OPER ATION 1]/_22/80 (4/77)
I UNIT SilUTDOWNS AND POWER REDUCTIONS T
N A
7 DATE 10-27-80 COMPLETED Hy W_ A_ Wnnd wall, III REPORT MON ill %ntemher 1980 TELEPil0NE 703/894-5151 e.
E E
Licensee
,E r,
$4 Cause & Corrective jg 3
y E3 3
Action to No.
Date g
3g g55 Event g7 gU g:
g Report #
u) o Present Recurrence F
g 6
concluded 80-04 800910 F
225.0 S E E
A U G U S T
R E
)
0 R T 80-05 800916 F
3.4 A*
3 N/A N/A N/A Reactor trip / turbine trip due to low vacuum.
Vaccum was lost while removin l cover to condensate pump suction strai ier for cleaning because a valve to the strainer was not fully closed.
Valve and condensate suction strainer were cleaned.
80-06 800926 F
4.0 A*
3 N/A N/A N/A Feedwater pumps tripped tripping the reactor.
Cleaned Condensate Pump suction strainers.
80-07 800927 S
20.6 B
3 N/A N/A N/A 50% Test reactor trip per 2-SU-36.
80-08 800928 S
7.6 B
9*
N/A N/A N/A Turbine shutdown to place balancing weights on Turbine Bearing Number 9 to reduce viora cion.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B Meintenance of Test 2-Manual Scram-Entry Sheets for Licenwe C Refueling 3 Automatic Scram.
Event Repori Ill:R) File INURI'G-D-Regulatory Restriction 4-Other (Explain) 01611 E-Operator Training & License Examination F-Administrative 5
G-Operational Eeror (Explain)
Eshibit I - Same Sonice p)/77)
Il Other (Explain)
I I
Paga of 4
UNIT SHUTDOWN AND POWER REDUCTIONS 50-339 DOCKET NO.
EXPLANATION SHEET REPORT MONTH September UNIT NAME N. Anna 2 YEAR 1980 DATE 10-27-80 COMPLETED BY A. G. Neufer (703) 894-5151 80-05 A While in the process of cleaning a condensate pump suction strainer one of the strainer valves was not fully shut due to debris under the valve seat. This caused a low vacuum' condition tripping the turbine resulting in a reactor trip.
80-06 A While in new plant start-up condition, much rust and particulate is washing from secondary piping and accumulating in start-up condensate pump suction strainers.
80-08 9 Reactor not shutdown. Turbine removed from service for maintenance.
Unit 2 continues with start-up power testing with commercial operations scheduled for late flovember.