ML19339B302
| ML19339B302 | |
| Person / Time | |
|---|---|
| Site: | Bellefonte |
| Issue date: | 10/24/1980 |
| From: | Mills L TENNESSEE VALLEY AUTHORITY |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| REF-PT21-80-278-001 10CFR-050.55E, 10CFR-50.55E, NCR-1234, NUDOCS 8011060688 | |
| Download: ML19339B302 (2) | |
Text
.
% sssa PA8T 21 IDEtKIFICATIM NO._ 26-2%-Col COPANY N@E.batlen GM4* -
DATE 0: LETTER. ida>4ho DOCKET N0. U-tk%436 DATE DISTRI'BUTED tom to o.m.
ORIGIMLREPORT SUPPLBBiTARY %
DISTRIBUTION:
N_%
EACTOR (R) 5 FUELCYCLE&
SAEGUARDS (S)
EDO IE FILES IEFILES AD/ROI IEFILES AD/SG AD/RCI AD/ FREI AD/RDI EGIWS I,II,III,IV,V EGIGE I,II,III,lV,V REG 10 G I,II,III,IV,V VBiDDR BR. R-IV VdOOR BR R-IV VBiDDR BR R-IV LDEB / tPA FIB 5715 NIES/F06 SS-396 NRR/R)L AEOD fib 7602 LDEB / IPA ffB 5715 R SS / SG SS-881 NRR/IE AEDD ffG 7602 LDEB/FPA FIG 5715 NRR/DSI ASLBP EAl 450 AEOD FIG 7602 T
SAP /SP f18-7210A ASLBP E/W 450 NRR/ DOL CENTPALFILES 016 CBiTRALFILES 016 P
CBiTPAL FILES ( GRON)
CBITRAL files (GR0f0 CSITRALFILES 016 PDR CENTRALFILES SS-395 CByTRAL FILES (GFDD LPDR PDR PDR TEPA LPDR
.ldl TEPA TEPA
' ACTION:
PREl_IMItMRY EVALUATION OF THE' ATTACHED REPORT IEICATES LEAD RESPONSIBILITY FOR FOLLOWJP AS SmWN.BELOW:
IE {
NRR'[
ifES ['
OTHER [
ss FFMSI Pa'. 8/1/80
- f.,11060 S
-...f+C8
y'
~
7 T C Fal{ W Q U TENNESSEE VALLEY AUTHORITY g
gg i
, b-CH ATTANOOGA. TENNEESEE 3740,;
o 400 Chestnut Street Tower II October 24, 1980 Mr. Jamee O'Reilly, Director Office of In ection and Enforcement U.S. Nuclear R
'latory Commission i
Region II - Suit 3100 lin-Q 4M 101 Marietta Stree Atlanta, Georgia 3
Dear Mr. O'Reilly:
BELLEFONIE NUCLEAR PLANT UNITS 1 AND 2 - 480V MCC CONTROL TRANSFORMER FTSES
- NCR 1234 - SECOND INTERIM REPORT The subject nonconformance was initially reported to NRC-0IE Inspector H. Thomas on August 8,1980, in accordance with 10 CFR 50.55(e). This was followed by our first interim report dated September 8,1980. T7A is t
awaiting an assessment of this deficiency by the vendor, Gould-Brown Boveri, along with their proposed corrective action.
We expect to submit our next written report by January 16, 1981. We consider 10 CFR Part y to be applicable to this nonconformance.
If you have any questions concerning this matter, please get in touch with D. L. Lambert at FTS 857-2581.
Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nuclear Regulation and Safety cc: M. Victor Stello, Jr., Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 An Equal Opportunity Emptoyer
..m m
.- ~
~
^*- --
-