ML19339B016
| ML19339B016 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 09/05/1980 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML19339B014 | List: |
| References | |
| NUDOCS 8011060160 | |
| Download: ML19339B016 (2) | |
See also: IR 05000364/1980022
Text
-
_
._
';O
.
- ps ue
'o
UNITED STATES
8"
N
NUCLEAR REGULATORY COMMISSION
l
$
.E
REGION 11
'
% . . . . . /[
101 MARIETTA sT.. N.W.. sulTE 3100
o,
,
ATLANTA. G EORo tA 30303
SEP 0 51980
In Reply Refer To:
,
RII:AGW
50-364/80-22
Alabama Power Company
ATTN:
R. P. Mcdonald
Vice President-Nuclear Generation
P. O. Box 2641
_
Birmingham, AL 35291
Gentlemen:
This refers to the inspection conducted by A. G. Wagner oi this office on July 8-17,
1980, of activities authorized by NRC Construction Permit No. CPPR-86 for the
Farley facility, and to the discussion of our findings held with J. Woodard at
the conclusion of the inspection.
Areas examined during the inspection and our findings are diccussed in the
'
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements.
fhese items and references
to pertinent requirements are listed in the Notice of 'liolation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to che provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within 20 days of your
)
receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2)
I
corrective steps which will be taken to avoid further noncompliance; and (3) the
date when full compliance will be achieved.
-
1
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
'
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the -information is proprietary, and should ,be prepared so
that proprietary information identified in the arplication is contained in a
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
PO110604 0
.
-
-_.
-
-
-
-
..
7
.
Alabama Power Company
-2-
SEP 0 51930
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
E. c.
R. C.
ewis, Acting Chief
Reactor Operations and Nuclear
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-364/80-22
cc w/ enc 1:
A. R. Barton, Executive Vice President
H. O. Thrash, Manager, Nuclear Generation
F. L. Clayton, Jr. , Senior Vice President
W. C. Petty, Manager-Quality Assurance
(Design and Construction)
W. G. Hairston, III, Plant Manager
R. E. Hollands, Jr. , QA Supervisor
0. D. Kingsley, Jr. , Manager, Nuclear Engineering
and Technical Services
,