Forwards IE Insp Rept 50-361/80-12 on 800718-0815 & Notice of Violation
ML19339B000
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 09/17/1980
From: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Papay L
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML19339A994 List:
References
NUDOCS 8011060131
Download: ML19339B000 (2)


See also: IR 05000361/1980012

Text

.

- - . .

. _ -

--

- -

.-

- -

-

. - _

..

- . .

.

-.-

]

  1. pa esam%,

'

'

UNITED STATES

-

-

83

.

't

NUCLEAR REGULATORY COMMISSION

'

$

e$

REGION V

?

[

1990 N. CAliFORNI A BOULEVAHD

o

',

% .% # /

SulTE 202, WALNUT CREE K PLAZA

l

e .e

WALNUT CaECK, CALIFORNIA 94596

2P l ' D&l

.

Dockat No. 50-361

,

4

i

Southern California Edison Company

,

P. O. Box 800

'

i

2244 Walnut Grove Avenue

j

Rosemead, California 91770

Attention:

Dr. L. T. Papay, Vice President

'

Advanced Engineering

Gentlemen:

j

Subject:

NRC Inspection of San Onofre Unit No. 2

l

This refers to the inspection conducted by Messrs. A. Johnson, A. Chaffee,

l

and R. Pate of this office on July 18 to August 15, 1980, of activities

i

authorized by NRC Construction Permit No. CPPR-97, and to the discussion of

!

i

)

our findings held by Mr. Pate with Mr. Petro and other members of your staff

at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection

reoort. Within these areas, the inspection consisted of selective examinations

of procea. es and representative records, interviews with personnel, and obser-

4

vations by tne inspectors.

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with NRC requirements, as det

forth in the Notice of Violation, enclosed herewith as Appendix A.

These items

,

of noncompliance have been categorized into a level as described in our corres-

i

pondence to all NRC licensees dated December 31, 1974.

j

This notice is sent to you pursuant to the provisons of Section 2.201 of the

NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations. Sec-

l

tion 2.201 requires you_ to submit to this office, within twenty (20) days of

!

your receipt of this notice, a written statemenc or explanation in reply includ-

ing (1) corrective steps which will be taken to avoid further violations; (2)

,

,

. corrective steps which will be taken to avoid further violations; and (3) the

date when full compliance will be achieved.

In accordance with Section 2.790 of'the NRC's " Rules of Practice," Part 2,

>

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

.

i

inspection report will be placed in the NRC's Public Document Room.

If this

j

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office, within 20 days

l

$

801106 0 l

,.

,

. . .

.

. . .

.

.

. . . .

_ _ , , .

- . _ . _

_ . . . _ . . . . . , , , , . , _ . . . - _ _ , _ . , _ , , - . . . ,

_

_ _ - _ _

_ _ - _ _ _ _ .

-

-

Southern California Edison Company

-2-

CEi 171380

)

of the date of this letter, requesting that such information be withheld from

public disclosure.

The application must include a full statement of the reasons

why it is claimed that the information is proprietary.

The application should

be prepared so that any proprietary information identified is contained in an

enclosure to the application, since the application without the enclosure will

also be placed in the Public Document Room.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

Should you have any questions concerning this inspection, we will be glad to

discuss them with you.

Sinc,ere,ly ,

,l

-

J

1ef

.

Reactor Operations and

(/ Nuclear Support Branch

Enclosures:

1.

APPEf1DI," A - Not're of Violation

2.

IE Inspection Report

flo. 50-361/80-12

cc w/o enclosure 2:

R. Dietch, Vice President

fluclear Engineering & Operations, SCE

.

i