ML19339A899
| ML19339A899 | |
| Person / Time | |
|---|---|
| Site: | Yankee Rowe |
| Issue date: | 07/13/1977 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML19339A891 | List: |
| References | |
| 50-029-77-11, 50-29-77-11, NUDOCS 8011050661 | |
| Download: ML19339A899 (1) | |
Text
_._
(
Q License No. DPR-3 APPENDIX A NOTICE OF VIOLATION
- =
.. h h
9 Based on the results of the !!RC inspection conducted on June 10-17, 1977, it appears that certain of your activities were not conducted in
=5-full compliance with conditions of your f;RC Facility License No. DPR-3 as indicated below. These items are infractions.
3 0.1 A v A.
Technical SpecificationQ.b.2.1.cNtates in part, that:
"The accuracy of each Type A test snail be verified by a supplemental test which requires the metered mass of gas injected into the
==
containment...for the supplemental test to be equivalent to between 50 and 100% of the allowable 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> mass loss."
Contrary to the above, the mass of gas infected into containment 5.[
for the supplemental test conducted on June 13, 1977, was equiva-g_=
lent to 38.7% of the allowable 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> mass loss.
~'
g=:=E B.
Technical Specification 6.8.1 states in part, that:
" Written pro-
~
cedures shall be established, implemented, and maintained...."
=
Procedure No. OP-4701, Revision 3, dated January 10, 1977, step 8, requires the hourly recording of instrument readings on Attachment i
A.
Contrary to the above, at 2300 and 2400 on June 11, l977, and at 1
0400, 0600,1100, and 1200 on June 12, outside weather instrument readings were not recorded.
,i;;
7
[l r
i I'
-=
.