Discusses IE Insp Rept 50-029/77-11 on 770610-17.CILRT Test Acceptability Remains in Question Due to Improper Sys Lineups & Insufficient Mass Injected Into Containment During Pumpback Supplemental Verification Test
ML19339A896
Person / Time
Site: Yankee Rowe
Issue date: 07/13/1977
From: Caphton D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML19339A891 List:
References
NUDOCS 8011050656
Download: ML19339A896 (1)


See also: IR 05000029/1977011

Text

'<

,

UNITED STATES

'

j

NUCLEAR REGULATORY COMMisstON

jy

, . .

s_

,

i .{./.

f j

REGION 1

  1. 4 ,. _ :1 -g

631 P ARK AVENUE

9 /* t h y f

KING OF PRLJ$$1 A, PENNSYLVANI A 19406

4

-

' " * *

JUL 131977

liEMORAllDU!1 FOR:

K. V. Seyfrit, Assistant Director for Technical

Programs, IE:HQ

fj)'?

THRU:

E. J. Brunru r/ Chief, Reactor Operations and fluclear

Support Branch, Region I, IE

FRO:1:

D. L. Caphton, Chief,I!uclear Support Section ?!o. 1,

RO&flS Branch, Region I, IE

SUBJECT:

YAtiKEE R0WE CILRT (AITS F14566H2)

REFEREl;CE:

Region I Inspection Report 50-29/77-11

Section 2 of the referenced inspection report discusses the CILRT recently

conducted at Yankee Rowe.

Despite the apparent low value of the mass

.,"

point leakage (0.0094%/ day), the acceptability of the test remains in

question as a result of improper system lineups and insufficient mass

injected into containment during the pump back supplemental verification

test. The licensee intends to perform Local Leak Rate Tests and make

Type C corrections to the Type A test to correct for the improper valu

lineups. These will be reviewed upon submittal of his report.

Region I

has issued a flotice of Violation for the verification test but recommends

that this not be a cause for rejection of the test results.

Preliminary

analyses of the pump back data indicate close agreement (5% of maximum

aliowable leakage over 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) between the metered values and those

measured with the CILRT instrumentation.

It is requested that IE Head-

quarters concur with this recommendation.

'

~

.

O. L. Caphton, Chief

t!uclear Support Section i:o.1

C0lTACT:

J. C. Higgins

(488-1346)

Enclosure:

Region I Inspection Report 50-29/77-11

cc w/ encl:

J. H. Sniezek, Assistant Director

for Field Coordinator, IE:HQ

- . -

-~

--

-

--

--

--

.

.