Forwards IE Insp Repts 50-348/80-27 & 50-364/80-39 on 800801-29.No Noncompliance Noted
ML19339A796
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 09/29/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML19339A797 List:
References
NUDOCS 8011050273
Download: ML19339A796 (2)


See also: IR 05000348/1980027

Text

~1

s

'

~

-

/ /(

. o

~*

/

'o

UNITED STATES

.

'

8'

~ , ,

NUCLEAR REGULATORY COMMISSION

n

$

,e

REGION 11

f[

0,

101 MARIETTA sT., N.W SUITE 3100

%

o'

ATLANTA. GEORGIA 3o303

SEP 2 91980

In Reply Refer To:

RJI WHB~

0-348/80-27

50-364/80-39

Alabama Power Company

ATTN:

R. P. Mcdonald

,

Vice President-Nuclear Generation

P. O. Box 2641

i

Birmingham, AL 35291

.

Gentlemen:

f

This refers to the inspection conducted by W. H. Bradford of this office on August I

through 29, 1980 of activities authorized by NRC License No. NPF-2 and Construction

Permit No. CPPR-86 for the Farley facility, and to the discussion of our findings

held with W. G. Hairston, III at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified enforce-

ment matters and unresolved items. The status of these items is discussed in the

enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. .If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

4

Sine rely,

'

$

,

i

R. C. Lewis, Acting Chief

Reactor Operations and Nuclear

' Support Branch

' Enclosure:

I850 2D

h

'See Page 2

-.

.

.-.

.

.

-_ .

-- . ..

_ .. _ ..

_

_ . ._

_

_ _ - .

$NEi):2 918tH)

'

c ,. . .

.

Alabana Power Company

-2-

l;.

F

Enclosure:

Inspection' Report Nos. 50-348/80-27

.

and 50-364/80-39

cc w/ encl:

A. R. Barton, Executive Vice' President

F. L. Clayton, Jr., Senior Vice President

H. O. Thrash, Manager-Nuclear Generation-

O. D. - Kingsley, Jr. , Manager, Nuclear Engineering

,

and Technical Services

j

J.'W. McGowan, Manager-Operations

'

Quality Assurance

W. G. Hairston, III, Plant Manager

,

W. C. Petty, Manager-Quality Assurance

!

(Design and Construction)

R. E. Hollands, Jr., QA Supervisor

t

i

j;

4

,

"$

.i

A

4

4

I

a

4

-

4

l

.

1

i

4

1

1

-

,

y.w=.l.-

e

an.-=.=-w-

v_P*=

    • =v e u * -w**

h ? -f * *- * N ***"* h *' ' * * ' "

' " * ' " * * * " * * " ' *#'

'". ' ' " ' ' . * . ~ . ,

. . - -

".3-1

,-

'

-

,

_

...

,

_y

. - _ ,-

, _ . . .+

,r

.

- . _