ML19339A711

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-348/80-25 & 50-364/80-36 on 800827-29.No Noncompliance Noted
ML19339A711
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 09/22/1980
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML19339A712 List:
References
NUDOCS 8011040565
Download: ML19339A711 (2)


See also: IR 05000348/1980025

Text

. _ - _

-

(k

!e as:q'o

,

UNITED STATES

8

~g

NUCLEAR REGULATORY COMMISSION

o

i

3

E

REGION 11

g

101 MARIETTA sT N.W.,sulTE 3100

%

ATLANTA, GEORGI A 30303

'

In Reply _ Refer To:

  1. EP 2 21980

RIITJRA

N

50-348/80-25

50-364/80-36

..-/

_

Alabama Power Company

ATTN:

R. P. Mcdonald

Vice President-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

This refers to the inspection conducted by J. R. Allen of this office on August 27

through 29, 1980 of activities authorized by NRC License No. NPF-2 and Construction

Permit No. CPPR-86 for the Farley Nuclear Plant facility, and to the discussion of

our findings held with W. G. ibirston at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the f aspection consisted of

selective examinations of procedures and representative records, intervicws with

personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncouraliance were disclosed.

We have examined actions you have taken with regar d to previously raported

unresolved items. The status of these items is discussed in the enclosed r.! port.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

.

.

J. Philip

ohr, Chief

Fuel Facility and Materials

Safety Branch

,

Enclosure:

See Page 2

,

80110405GS

'

@

_ -

. .

SEP 2 21980

Airbana Power Company

-2-

.

i

Enclosure:

Inspection Report Nos. 50-348/80-25

and 50-364/80-30

cc w/ encl:

A. R. Barton, Executive Vice President

F. L. Clayton, Jr., Senior Vice President

H. O. Thrash, Manager-Nuclear Generation

1

0. D. Kingsley, Jr. , Manager, Nuclear Engineering

and Technical Services

J. W. McGowan, Manager-Operations

Quality Assurance

W. G. Hairston, III, Plant Manager

W. C. Petty, Manager-Quality Assurance

(Design and Construction)

R. E. Hollands, Jr., QA Supervisor

t

}

1

i

,

J

'

s

e

l

.--w-se

  • , - -e e ,%.

e -- we e+,%<

- _"- ] _

=ma.

-w

+m

.

-we.-

--w,-..-+c----,v.-y ; e r

e

5

w

ge-

, ,

a .w v

e-

w-

ee--