ML19339A375

From kanterella
Jump to navigation Jump to search
Second Interim Deficiency Rept Re Ability of Structural Contractor QA Program to Assure Design Changes Were Incorporated Into Const Activities.Design Change Issue Is Still Unresolved.Final Rept to Be Submitted by 801101
ML19339A375
Person / Time
Site: Marble Hill
Issue date: 09/02/1980
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19339A373 List:
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8011030686
Download: ML19339A375 (1)


Text

09 0 2804000

/

flt '

. g / /

L.'

PUBLIC SERVICE INDIANA September 2, 1960 S. W. Shields Senior Vice Presdent -

Nuclear Duision Mr. James G. Keppler Docket Mos.: STN 50-546 U.S. Nuclear Regulatory Commission STN 50-547 Region III Construction Permit Nos.:

799 Roosevelt Road CPPR - 170 Glen Ellyn, IL 60137 CPPR - 171 Dear Mr. Keppler

SUBJECT:

Marble Hill Nuclear Generating Station - Units 1 and 2 On March 7,1980, Mr. S. J. Brewer of Public Service Company of Indiana, Inc. ,

(PSI) telephoned your office to notify you of a potentially reportable item as required by 10 CFR 50.55(e). This item pertained to the ability of the major structural contractor's Quality Assurance Program to assure that PSI or Architect-Engineer originated design changes were incorporated into plant construction activities.

As discussed in the interim report of April 2,1980, PSI's structural contractor performed a visual inspection to verify the incorporation of thos' design changes which could not be verified by records of construction activities. As a result of the delay in resumption of safety related construction some of those design changes in question which were inaccessible due to the location of heavy equipment and temporary decking at the time of the interim report Sre still inaccessible presently. This issue therefore cannot be resolved at this time and PSI anticipates a final report will be submitted on or bef.re November 1, 1980. If you have any questions on this matter, please fee t free to contact me.

Sincerely,

. W. Shields TDG/cg cc: Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 cc: J.J. Harrison E.R. Schweibinz, P.E.

P.O. Box 190, New Washington, Indiana 47162 812. 293.4441 g()1103