Ack Receipt of 800902 Interim Deficiency Rept Re Ability of Structural Contractor QA Program to Assure That Design Changes Were Incorporated Into Const Activities
ML19339A372
Person / Time
Site: Marble Hill
Issue date: 09/23/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
Shared Package
ML19339A373 List:
References
NUDOCS 8011030683
Download: ML19339A372 (1)


Text

i I

p' "'Ds, UNITED STATES

$Y NUCLEAR REGULATORY COMMISSION

[j

,i o

REGION 111

(

D

'f 799 ROOSEVELT ROAD

,/

occ~ etvu. eti~ois.om SEP 2 3 E60 i

l Docket No. 50-546 Docket No. 50-547 i

Public Service of Indiana ATTN:

Mr. S. W. Shields Senior Vice President Nuclear Division l

Post Office Box 190 l

New Washington, IN 47162 i

Gentlemen:

[

Thank you for your interim report dated September 2, 1980, pursuant to 10 CFR 50.55(e) regarding the ability of the structural contractor"s j

QA program to assure design changes were incorporated into construction activities. We will review your final report on this matter upon receipt.

l Your cooperation with us is appreciated.

Sincerely, U

Gaston Fiorelli, Chief Reactor Construction and Engineering Support Branch cc: Director, RCI/IE Director, AEOD Chief, OEB/MPA IE Files Mr. G. N. Brown, Project Director C. Kammerer, CA cc w/1tr dtd 9/2/80:

Central Files PDR Local PDR NSIC TIC LEBoeuf, Lamb, Leiby & MacRae l

Mr. Dave Martin, Office of Attorney General Mr. John R. Galloway, Staff Director, Environment, Energy and Natural Resources Subcommittee B022030 %

.