ML19339A372
| ML19339A372 | |
| Person / Time | |
|---|---|
| Site: | Marble Hill |
| Issue date: | 09/23/1980 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Shields S PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA |
| Shared Package | |
| ML19339A373 | List: |
| References | |
| NUDOCS 8011030683 | |
| Download: ML19339A372 (1) | |
Text
i I
p' "'Ds, UNITED STATES
$Y NUCLEAR REGULATORY COMMISSION
[j
,i o
REGION 111
(
D
'f 799 ROOSEVELT ROAD
,/
occ~ etvu. eti~ois.om SEP 2 3 E60 i
l Docket No. 50-546 Docket No. 50-547 i
Public Service of Indiana ATTN:
Mr. S. W. Shields Senior Vice President Nuclear Division l
Post Office Box 190 l
New Washington, IN 47162 i
Gentlemen:
[
Thank you for your interim report dated September 2, 1980, pursuant to 10 CFR 50.55(e) regarding the ability of the structural contractor"s j
QA program to assure design changes were incorporated into construction activities. We will review your final report on this matter upon receipt.
l Your cooperation with us is appreciated.
Sincerely, U
Gaston Fiorelli, Chief Reactor Construction and Engineering Support Branch cc: Director, RCI/IE Director, AEOD Chief, OEB/MPA IE Files Mr. G. N. Brown, Project Director C. Kammerer, CA cc w/1tr dtd 9/2/80:
Central Files PDR Local PDR NSIC TIC LEBoeuf, Lamb, Leiby & MacRae l
Mr. Dave Martin, Office of Attorney General Mr. John R. Galloway, Staff Director, Environment, Energy and Natural Resources Subcommittee B022030 %
.