Text
k
y ~ ,4,
.
.
UNITED STATES
t
l
.
8
NUC! EAR REGULATORY COMMISSION
$ .j'y .,..)f y 7,' W ' / [3
"
REGION V
0, fi
1999 N. C AllFORNI A BOULEVARD
[
SUITE 202, WALNUT CREEK PLAZA
%
v
,
- ..,e'
WALNUT CRE E K. CALIFORNI A 94596
J i.F
1980
Docket Nos. 50-508
50-509
Washington Public Power Supply System
P. O. Box 968
Richland, Washington 99352
Attention: Mr. R. L. Ferguson
Managing Director
Gentlemen:
Subject: URC Inspection at Washington Nuclear Projects Nos. 3 and 5
This refers to the inspection conducted by Mr. T. W. Bishop of this
office from June 25 to July 18, 1980 of activities authorized by
NRC Construction Permits Nos. CPPR-154 and CPP. 155, and to the
discussion of our findings held by Mr. Bishop with Mr. C. E. Love
and other members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted
of selective examinations of procedures and representative records,
interviews with personnel, and observations by the inspector.
Based on the results of this inspection, it appears that certain
of your activities were not conducted in full compliance with NRC
requirements, as set forth in the Notice of Violations, enclosed
herewith as Appendix A.
These items of noncompliance have been
categorized into a level as described in our correspondence to all
NRC licensees dated December 31, 1974.
This notice is sent to you pursuant to the provisions of Section 2.201,
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Section 2.201 requires you to submit to this office,
within thirty (30) days of your receipt of this notice, a written
statement or explanation in reply including (1) corrective steps
which have been taken by you and the results achieved; (2) corrective
steps which will be taken to avoid further violations; and (3) the
date when full compliance will be achieved.
801031c O IT
<
.
.__
___
__
.
.
.
.
4 E20
Mr. R. L. Ferguson
-2-
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that
you believe to be proprietary, it is necessary that you submit a
written application to this office, within 30 days of the date of
this letter, requesting that such information be withheld from
public disclosure. The application must include a full statement
of the reasons why it is claimed that the information is proprietary.
The application should be prepared so that any proprietary information
identified is contained in an enclosure to the application, since
the application without the enclosure will also be placed in the
Public Document Room.
If we do not hear from you in this regard
within the specified period, the report will be placed in the Public
Document Room.
Should you have any questions concerning this inspection, we will be
glad to discuss them with you.
Sincerely,
2Me-~
G. S. Spencer, Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
B. IE Inspection Report
Nos. 50-508/80-06
50-509/80-06
su-
cc w/o enclosure B:
M. E. Witherspoon, Division Manager
Quality Assurance, WPPSS
cc w/ enclosures:
D. E. Dobson, Acting Division Manager
WNP-3/5, WPPSS
I
'
r