Text
.-
- Q
.
'
8,f
/
'o,
UNITED STATES
,
$
0
.{ . n
NUCLEAR REGULATORY COMMISSION
E
REGION 11
o
101 MARIETTA ST., N.W., SUITE 3100
o
ATLANTA, GEORGIA 3o303
SEP 10 M0
In Reply Refer To:
RII:LM
50-325/80-32
50-324/80-29
Carolina Power and Light Company
ATTN:
J. A. Jones
.
Senior Executive Vice President and
Chief Operating Officer
411 Fayetteville Street
Raleigh, NC 27602
Gentlemen:
This refers to the inspection conducted by L. Modenos of this office on August 5
through 7, 1980 of activities authorized by NRC Operating License Nos. DPR-71
and DPR-62 for the Brunswick Steam Electric Plant facility, and to the discussion
of our findings held with T. C. Tollison at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records,
interviews with
personnel, and observations by the inspector.
s
i
One new unresolved item resulted from this inspection and is discussed in the
enclosed report.
This item will be exanined during subsequent. inspections.
During the inspection, it was
appear to be in noncompliance with NRC requirements.found that certain activities u
This item and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section
2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-
tions.
Section 2.201 requires you to submit to this office, within 20 days of
your receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2)
date when full compliance will be achieved. corrective steps which will be taken
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
, Title
report will be placed in the NRC's Public Document Room.
If this report contains
any information that you (or your contractor) believe to be proprietary, it is
withhold such informationnecessary that you make a written application within 20 days to t
from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed
the information is proprietary, and should be prepared so that proprietary infor-
mation identified in the application is contained in a separat
document.
the report will be placed in the Public Document Room.If we do not hear from
e part of the
8010 2 9 c3f7-
.
o
.
.
qpp i 0 1980
Tennessee Valley Authority
-2-
s
.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
-
C . E . Mu rp t'f,
net
i
Reactor Construction and Engineering
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-325/80-32
and 50-324/80-29
cc w/ encl:
A. C. Tollison, Jr., Plant Manager