ML19338G237
| ML19338G237 | |
| Person / Time | |
|---|---|
| Site: | Big Rock Point, Palisades File:Consumers Energy icon.png |
| Issue date: | 10/02/1980 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Dewitt R CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| References | |
| NUDOCS 8010280664 | |
| Download: ML19338G237 (1) | |
Text
__
T1C 4
e5 Krog'o,,
UNITED STATES 8"
f' n NUCLEAR REGULATORY COMMISSION
- .<, E REGION 111 799 ROOSEVELT ROAD o,
,e*
CLEN ELLYN,lLLINolS 60137 OCT 1 8 83 Docket No. 50-155 Docket No. 50-255 Consumers Power Company ATTN:
Mr. R. B. DeWitt Vice President Nuclear Operations 212 Vest Michigan Avenue Jackson, MI 49201 Gentlemen:
The enclosed IE Circular No. 80-22 is forwarded to you for information.
No written response is required.
Should you have any questions related to your understanding of the recommendations on this matter, please contact this office.
Sincerely, hamesG.Keppler U Director
Enclosure:
IE Circular No. 80-22 cc w/ enc 1:
Mr. D. P. Hoffman, Nuclear Resident Inspectors, RIII Licensing Administrator PDR Mr. C. J. Hartman, Local PDR Plant Superintendent NSIC Mr. R. W. Montross, Manager TIC Central Files Ronald Callen, Michigan Director, NRR/DPM Public Service Commission Director, NRR/ DOR Myron M. Cherry, Chicago AEOD 8 010gggQ
i SSINS:
6830 Accession No.:
8006190055 IEC 80-22 UNITED STATES NUCLEAR REGULATORY COMMISSION 1T OFFICE OF INSPECTION AND ENFORCEMENT uy WASHINGTON, D.C.
20555 October 2, 1980 IE Circular No. 80-22:
CONFIRMATION OF EMPLOYEE QUALIFICATIONS In recent months, the Nuclear Regulatory Commission has determined that in two unrelated actions a utility and an architect-engineering company employed technically unqualified individuals as designers / engineers by failing to confirm the validity of their technical and educational qualifications as presented in their employment applications.
In both of these instances, the employers mistakenly assumed that the personnel firms supplying these individuals had investigated and confirmed previous career experiences.
In view of the fact that the unqualified persons in both of these cases were discovered as a result of allegations to this effect, rather than through internal company procedures, we believe that this matter warrants your attention.
We are hereby recommending that jour employment procedures be reviewed to determine that your company has in effect employment policies which confirm the professional qualifications of employees.
In the event you conclude that your present procedures do not fully address this matter, we recommend that you take promp',. remedial action in this regard.
No written resh nse to this Circular is required.
If you desire additional information regarding this subject, contact the Director of the appropriate NRC Regional Office.
4
>n
IEC 80-22 October 2, 1980 I
RECENTLY ISSUED IE CIRCULARS Circular Date of No.
Subject Issue Issued to 80-21 Regulation of refueling 9/10/80 All holders of a crews power reactor OL or CP 80-20 Changes in Safe-Slab Tank 8/21/80 All Part 50 and Part Dimensions 70 fuel facility licensees 80-19 Noncompliance with 8/26/80 All medical licensees License Requirements for Medical Licensees 80-18 10 CFR 50.59 Safety 8/22/80 All power reactor Evaluations for Changes to facilities with an Radioactive Waste Treatment OL or CP Systems 80-17 Fuel Pin Damage Due to Water 7/23/80 All holders of PWR Jet from Baffle Plate Corner OLs and PWR cps 80-16 Operational Deficiencies In 6/27/80 All power reactor Rosemount Model 51000 Trip facilities with an Units And Model 1152 Pressure OL or a CP Transmitters 80-15 Loss of Reactor Coolant Pump 6/20/80 All power reactor Cooling and Natural Circula-facilities with an tion Cooldown OL or CP 80-14 Radioactive Contamination of 6/24/80 All holders of power Plant Demineralized Water and research reactor System and Resultant Internal licenses (operating Contamination of Personnel and construction permits), and fuel cycle licensees 80-13 Grid Strap Damage in 5/18/80 All holders of reactor Westinghouse Fuel Assemblies OLs and cps 80-12 Valve-Shaft-To-Actuator Key 5/14/80 All holders of reactor May Fall Out of Place When OLs and cps Mounted Below Horizontal Axis 80-11 Emergency Diesel Generator 5/13/80 All holders of r. power Lube Oil Cooler Failures reactor OL or CP
.