ML19338G189

From kanterella
Jump to navigation Jump to search
Forwards LER 80-067/03L-0
Date released: 12/18/2019 Download: ML19338G189


LER 80-067/03L-0:on 800923,following Reactor Scram,Reactor Core Isolation Cooling Injection Valve 2E51-F013 Would Not Fully Open.Caused by Missing Electrical Jumper.Jumper Installed
ML19338G194
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 10/22/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19338G194 (2)
Forwards LER 80-067/03L-0
ML19338G188
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 10/22/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19338G188 (1)