ML19338F958

From kanterella
Jump to navigation Jump to search
Forwards IE Circular 80-22, Confirmation of Employee Qualifications. No Written Response Required
ML19338F958
Person / Time
Site: Marble Hill
Issue date: 10/02/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
References
NUDOCS 8010280120
Download: ML19338F958 (1)


Text

c-c#

'*'o,'

.p UNITED STATES l'.

T, NUCLEAR REGULATORY COMMISSION 3-bl E

REGION ill 0,

[

799 ROOSEVELT ROAD D

GLEN ELLYN, ILLINOIS 60137

%..**o

+

OCT & 8 i

Docket No. 50-546 Docket No. 50-547 Public Service of Indiana ATTN:

Mr. S. W. Shields Senior Vice President Nuclear Division Post Office Box 190 New Washington, IN 47162 3

Gentlemen:

The enclosed IE Circular No. 80-22 is forwarded to you for information.

No written response is required. Should you have any questions relat d to your understanding of the recommendations on this matter, please contact this office.

Sincerely, t' ). '

4 James G. Keppler Director

Enclosure:

IE Circular No. 80-22 cc w/ enc 1:

Mr. Steve J. Brewer, Nuclear TIC Safety and Licensing Supervisor LeBoeuf, Lamb, Leiby & MacRae Central Files Mr. Dave Martin, Office of the Director, NRR/DPM Attorney General

)

Director, NRR/ DOR Mr. John R. Galloway, Staff PDR Director, Environment, Energy Local PDR and Natural Resources Subcommittee NSIC B olossojy

SSINS:

6830 Accession No.:

8006190055 IEC 80-22 i

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT y

1- ! O A

WASHINGTON, D.C.

20555 g

g October 2, 1980 IE Circular No. 80-22:

CONFIRMATION OF EMPLOYEE QUALIFICATIONS In recent months, the Nuclear Regulatory Commission has determined that in two unrelated actions a utility and an architect-engineering company employed technically unqualified individuals as designers / engineers by failing to confirm the validity of their technical and educational qualifications as presented in their employment applications.

In both of these instances, the employers mistakenly assumed that the personnel firms supplying these individuals had investigated and confirmed previous career experiences.

In view of the fact that the unqualified persons in both of these cases were discovered as a result of allegations to this effect, rather than through internal company procedures, we believe that this matter warrants your attention.

We are hereby recommending that your employment procedures be reviewed to determine that your company has in effect employment policies which confirm the professional qualifications of employees.

In the event you conclude that your present procedures do not fully address this matter, we recommend that you take prompt. remedial action in this regard.

^

No written response to this Circular is required.

If you desire additional information regarding this subject, contact the Director of the appropriate NRC Regional Office.

IEC 80-22 October 2, 1980 RECENTLY ISSUED IE CIRCULARS Circular Date of No.

Subject Issue Issued to 80-21 Regulation of refueling 9/10/80 All holders of a crews power reactor OL or CP 80-20 Changes in Safe-Slab Tank 8/21/80 All Part 50 and Part Dimensions 70 fuel facility licensees 80-19 Noncompliance with 8/26/80 All medical licensees License Requirements for Medical Licensees 80-18 10 CFR 50.59 Safety 8/22/80 All power reactor Evaluations for Changes to facilities with an Radioactive Waste Treatment OL or CP Systems 80-17 Fuel Pin Damage Due to Water 7/23/80 All holders of PWR Jet from Baffle Plate Corner OLs and PWR cps 80-16 Operational Deficiencies In 6/27/80 All power reactor Rosemount Model 510D0 Trip facilities with an Units And Model 1152 Pressure OL or a CP Transmitters 80-15 Loss of Reactor Coolant Pump 6/20/80 All power reactor Cooling and Natural Circula-facilities with an tion Cooldown OL or CP 80-14 Radioactive Contamination of 6/24/80 All holders of power Plant Demineralized Water and research reactor System and Resultant Internal licenses (operating Contamination of Personnel and construction permits), and fuel cycle licensees 80-13 Grid Strap Damage in 5/18/80 All holders of reactor Westinghouse Fuel Assemblies OLs and cps 80-12 Valve-Shaft-To-Actuator Key 5/14/80 All holders of reactor May Fall Out of Place When 6Ls and CPc Mounted Below Horizontal Axis 80-11 Emergency Diesel Generator 5/13/80 All holders of a power Lube Oil Cooler Failures reactor OL or CP

-