ML19338F927

From kanterella
Jump to navigation Jump to search
Forwards IE Circular 80-22, Confirmation of Employee Qualifications. No Written Response Required
ML19338F927
Person / Time
Site: Humboldt Bay, Diablo Canyon
Issue date: 10/02/1980
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Crane P
PACIFIC GAS & ELECTRIC CO.
References
NUDOCS 8010280025
Download: ML19338F927 (1)


Text

-_

Tlb i

8[s Lti a

I 4,

UNITED STATES NUCLEAR HEGULATORY COMMISSION o

3 E

REGION V o

1990 N. CALIFORNIA SOULEVARD o

SUITE 202, WALNUT CREEK PLAZA to,a WALNUT CREEK, CALIFORNIA 24596 3

October 2, 930 Docket ilos. 50-133, 50-275, 50-323 Pacific Gas and Electric Company 77 J'eale Street San Francisco, California 94106 Attention: Mr. Philip A. Crane, Jr.

Assistant General Counsel Gentlemen:

l The enclosed Circular flo. 80-22 is forwarded to you for information.

ilo written response is required.

Should you nave any questions related to l

your understanding of the recommencations on tnis matter, please contact this office.

1 Sincarely,

}

l Q ll le 4 W,/

/f Dirhetor i

\\

i/

Enclosures:

1.

IE Circular ilo. 80-22 2.

Recently issued IE Circulars cc w/ enclosures:

J. D. Shiffer W. Raymond, PGaE E. ', leeks, PGSE, Humboldt Bay E. J. Langley, Jr., PG&E 8 01028004g

i l

\\

{

SSIflS: 6830 Accession f!o.:

8006190055 IEC 80-22 i

UNITED STATES fiUCLEAR REGULATORY COMMISSION OFFICE OF It!SPECTION Afl0 E!!FORCEMEllT m

D 3

UASHIflGTOll, D.C.

20555 i

A sa a

October 2, 1980 1

IE Circular flo. 80-22: CONFIRMATION OF EMPLOYEE QUALIFICATIONS f

In recent months, the Nuclear Regulatory Commission has determined that in two 1

unrelated actions a utility and an architect-engineering company employed l

technically unqualified individuals as designers / engineers by failing to j

confirm the validity of their technical and educational qualifications as presented in their employment aoplications.

In both of these instances, the employers mistakenly assumed that the personnel firms supplying these individuals had investigated and confirmed previous career experiences.

In view of the fact that the unqualified persons in both of these cases were discovered as a result of allegations to this effect, rather than through internal company procedures, we believe that this matter warrants your attention.

We are hereby recommending that your employment procedures be reviewed to determine that your company has in effect employment policies which confirm the professional qualifications of employees.

In the event you conclude that your present procedures do not fully address this matter, we recommend that 3

you take pronpt remedial action in this reoard.

i Ito written response to this Circular is required.

If you desire additional l

information regarding this subject, contact the Director of the appropriate NRC Regional Office.

4 I

i i

f k

\\

h g

_. _~

. -, - _ _ _, _ -, - ~..,... -....~...., _ - -

IEC 80-22 October 2, 1980 RECENTLY ISSUED IE CIRCULARS Circular Late of No.

Subject Issue Issued to 80-21 Regulation of refueling 9/10/80 All holders of a crews power reactor OL or CP 80-20 Changes in Safe-Slab Tank 8/21/80 All Part 50 and Part Dimensions 70 fuel facility licensees 80-19 Nonconpliance with C/26/80 All medical licensees License Reauirements for Medical Licensees 80-18 10 CFR 50.59 Safety 8/22/30 All power reactor Evaluations for Changes to facilities with an Radioactive Waste Treatment OL or CP Systens 80-17 Fuel Pin Damage Due to Water 7/23/80 All holders of PWR Jet from Caffle Plate Corner

' OLs and PWR cps 80-16 Operational Ceficiencies In 6/27/00 All power reactor Rosemount "odel 510DU Trip facilities with an Units And "odel 1152 Pressure OL or a CP Transni tters 80-15 Loss of Peactor Coolant Pump 6/20/C0 All power reactor Cooling and Natural Circula-facilities with an tion Cooldown OL or CP 80-14 Radioactive Contamination of 6/24/80 All holders of power Plant Demineralized Water and research reactor Systen and Pesultant Internal licenses (operating Contauination of Personnel and construction permits), and fuel cycle licensees 80-13 Grid Strap Danane in 5/13/00 All holders of reactor Westinghouse Fuel Assemblies OLs and cps 80-12 Valve-Shaf t-To-Actuator Key 5/14/80 All holders of reactor May Fr:1 Out of Place When OLs and cps Mounted Below Horizontal Axis 80-11 Emergency Diesel Generator 5/13/80 All holders of a power Lube Oil Cooler Failures reactor OL or CP