ML19338F926

From kanterella
Jump to navigation Jump to search
Forwards IE Circular 80-22, Confirmation of Employee Qualifications. No Written Response Required
ML19338F926
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 10/02/1980
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Goodwin C
PORTLAND GENERAL ELECTRIC CO.
References
NUDOCS 8010280023
Download: ML19338F926 (1)


Text

_ - _ _ _.

k 8(

a UNITED STATES g

NUCLEAR REGULATORY COMMISSION a

E REGION V o

1990 N. CAllFORNIA BOULEVARD o

SUITE 202. WALNUT CREEK PLAZA 4e,,*

WALNUT CREEK. CALIFORNIA 94598 October 2, 1980 Docket No. 50-344 Portland General Electric Company 121 S. Lt. Salmon Street Portlar, Oregon 97204 a

Attention: fir. Charles Goodwin, Jr.

Assistant Vice President Gentlemen:

The enclosed Circular No. 80-22 is forwarded to you for information.

11 0 written response is required.

Should you have any questions related to your understanding of the recommendations on this matter, please contact this office.

Sincerely,

/f [.

I e

D

[ Director

Enclosures:

1.

IE Circular No. 00-22 2.

Recently issued IE Circulars cc w/ enclosures:

C. P. Yundt, PGE

f. C. Gaidos, PGE J. Lt. Lentsch, PGE
  • ' "" '43 1

p

~

t SSIfis: 6830

' Accession flo.:

l i

8006190055 IEC 80-22 j

UflITED STATES i

i flVCLEAR REGULATORY COMMISSIOil 1

0FFICE OF IflSPECTI0f! Afl0 EtlFORCEf1ErlT 7

I N

I UASHIf!GT0ft, D.'C.

20555 D

ffh rpm I

J E 6 g i6 b 8

j Cctober 2, 1980 4

IE Circular flo. 80-22: C0flFIPRATI0ft 0F EMPLOYEE OdALIFICATI0flS i

i In recent months, the fluclear Regulatory Commission has determined that in two unrelated actions a utility and an architect-engineering company employed 1

technically unqualified individuals as designers / engineers by failing to j

confirm the validity of their technical and educational cualifications as presented in their employment applications.

In both of these instances, the employers mistakenly assumed that the personnel firms supplying these individuals had investigated and confirmed previous career experiences.

In view of the fact that the unqualified persons in both of these cases were i

discovered as a result of allegations to this effect, rather than through i

internal company procedures, we believe that this matter warrants your

{

attention.

We are hereby recommending that your-eniployment procedures be reviewed to determine that your company has in effect employment policies which confirm a

the professional qualifications of employees.

In the event you conclude that your present procedures do not fully address this matter, we recommend that f

you take prompt remedial action in this regard.

fio written response to this Circular is required.

If you desire additional information regarding this subject, contact the Director of the appropriate j

flRC Regional Office.

4 L

i i

l 9W~3-WD *y-4V,,

i g

e.

4 g

-+w-s..-sey

=--,

a yyy

-,,-..m.,%y y-

-...-~,-..,, -

7y w,

,.-,.,.w,,

p.y9 y,,,,+

7p.

yy 9

.,3-

-,n,-

,,-f 3,-.%w.s y

,w---

I IEC 80-22 i

October 2, 1980 RECEllTLY ISSUED i

IE CIRCULARS Circular Date of No.

Sub.iect Issue Issued to i

80-21 Regulation of refueling 9/10/80 All holders of a crews power reactor OL or CP 1

80-20 Changes in Safe-Slab Tank 8/21/80 All Part 50 and Part Dimensions 70 fuel facility licer. sees j

80-19 tioncompliance with 8/26/80 All medical licensees License Reauirements for Medical Licensees 80-18 10 CFR 50.59 Safety 8/22/80 All power reactor f

j Evaluations for Changes to facilities with an i

Radioactive Waste Treatment OL or CP Systems 80-17 Fuel Pin Damage Due to Water 7/23/80 All holders of PWR Jet from Baffle Plate Corner

' OLs and PWR cps 80-16 Operational Deficiencies In 6/27/80 All power reactor Rosemount Model 510D0 Trip facilities with an Units And Model 1152 Pressure OL or a CP i

Transmitters i

80-15 Loss of Reactor Coolant Pump 6/20/80 All power reactor Cooling and flatural Circula-facilities with an tion Cooldown OL or CP 80-14 Radioactive Contamination of 6/24/80 All holders of power Plant Demineralized Water and research reactor I

{

System and Resultant Internal licenses (operating i

Contamination of Personnel and construction permits), and fuel cycle licensees 80-13 Grid Strap Damage in 5/18/80 All holders of reactor Westinghouse Fuel Assemblies Ols and cps i

80-12 Valve-Shaft-To-Actuator Key 5/14/80

-All hold

of reactor May Fall Out of Place When OLs and Les Mounted Below Horizontal Axis 80-11 Emergency Diesel Generator 5/13/80 All holders of a power Lube Oil Cooler Failures reactor OL or CP

,._ _