ML19338F890

From kanterella
Jump to navigation Jump to search
Forwards IE Circular 80-22, Confirmation of Employee Qualifications. No Written Response Required
ML19338F890
Person / Time
Site: Crystal River 
Issue date: 10/02/1980
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hancock J
FLORIDA POWER CORP.
References
NUDOCS 8010270567
Download: ML19338F890 (1)


Text

UNITED STATES 8'

'n NUCLEAR REGULATORY COMMISSION i

a REGION il

' 4 Y

101 MARIETTA ST N.W.. SUITE 310o

%,,..... /

ATLANTA, GEORGIA 30303 OCT 2 1999 In Reply Refer To:

RII:JE0 GO-302)

Florida Power Corporation ATTN:

J. A. Hancock, Director Nuclear Operations P. O. Box 14042, Mail Stop C-4 St. Petersburg, FL 33733 Gentlemen:

The enclosed IE Circular No. 80-22, is forwarded to you for information.

No written response is required. Should you have any questions related to your understanding of the recommendations on this matter, please contact this office.

Sincerely,

/>

James P. O'Reilly Director

Enclosures:

1.

IE Circular No. 80-22 j

2.

List of Recently Issued IE Circulars cc w/ encl:

D. C. Poole, Nuclear Plant Manager 1

s t

J

~

.a,m-m

- = m.,-+w av. www e> ~

een m m

--,w m e e e.,e-m ~,

,o a-.

age a

sm-sag-s s

, m.m1

-e

SSINS:.6830 Accession No.:

8006190055 4

UNITED STATES NUCLEAR REGULATORY COMMISSION g

0FFICE OF INSPECTION AND ENFORCEMENT WASHINGTON,-D.C. 20555 October 2,1980 IE Circular No. 80-22: CONFIRMATION OF EMPLOYEE QUALIFICATIONS In recent months, the Nuclear Regulatory Commission has determined that in two i

-unrelated actions a utility and an architect-engineering company employed tech-nically unqualified individuals as designers / engineers by failing to confirm the validity of their technical and educational qualifications as presented in their employment applications.

In both of these instances, the employers mistakenly.

assumed that the personnel firms supplying these individuals had investigated

~

and confirmed previous career experiences. In view of the fact that the unquali-fied persons in both of these cases were discovered as a result of allegations to this effect, rather than through internal company procedures, we believe that this matter warrants your attention.

We are hereby recommending that your employment procedures be reviewed to deter-eine that your company has in' effect employment policies which confirm the professional qualifications of employees.

In the event you conclude that your present procedures do not fully address this matter, we recommend that you take prompt remedial action in this regard.

No written response to this Circular is required.

If you desire additional information regarding this subject, contact the Director of the appropriate NRC Regional Office.

1 4

l e

,.we

% %v.-.m, w% g

.s

,.e--.q,m A

W-t~,e we.+,..+-we


=.-==wman

=,,+w,

.-m w-

  • =r

,2s

..n.,

,v.

r

j IEC 80-22 October 2, 1980 RECENTLY ISSUED IE CIRCULARS Circular Date of No.

Subject Issue Issued to 80-22 Confirmation of Employee 10/2/80 All holders of a power Qualifications reactor OL or CP 80-21 Regulation of refueling 9/10/80 All holders of a crews power reactor OL or CP 80-20 Changes in Safe-Slab Tank 8/21/80 All Part 50 and Part Dimensions 70 fuel facility licensees 80-19 Noncompliance with 8/26/80 All medical licensees License Requirements for Medical Licensees 80-18 10 CFR 50.59 Safety 8/22/80 All power reactor Evaluations for Changes to facilities with an Radioactive Waste Treatment OL or CP Systems 80-17 Fuel Pin Damage Due to Water 7/23/80 All holders of PWR Jet from Baffle Plate Corner OLs and PWR cps 80-16 Operational Deficiencies In 6/27/80 All power reactor Rosemount Model 510DU Trip facilities with an Units And Model 1152 Pressure OL or a CP Transmitters 80-15 Loss of Reac+or Coolant Pump 6/20/80 All power reactor Cooling and Natural Circula-facilities with an tion Cooldown OL or CP 80-14 Radioactive Contamination of 6/24/80 All holders of power Plant Demineralized Water and research reactor System and Resultant Internal licenses (operating Contamination of Personnel and construction permits), and fuel cycle licensees 80-13 Grid Strap Damage in 5/18/80 All holders of c-etor Westinghouse Fuel Assemblies OLs and cps 80-12 Valve-Shaft-To-Actuator Key 5/14/80 All holders of reactor May Fall Out of Place When OLs and cps Mounted Belov Horizontal Axis