Text
7-
-\\,i p
OPERATING DATA REPORT 50-302 DOCKET NO.
DATE 10/6/80 COMPLETED BY M. W. Culver TELEPHONE (904) m -6486 OPERATING STATUS Notes I. Unit Name:
Crv"n 1 River Unit 3 I
- 2. Reporting Period: C 2452
- 3. Licensed Thermal Power (MWt):.
890
- 4. Nameplate Rating (Gross MWe):
825
- 5. Design Electrical Rating (Net MWe):
821
- 6. Maximum Dependable Capacity (Gross MWe):
782
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None
- 9. Power Level To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions.If Any:
This Month Yr. to.Date Cumulative 720 6575 31151
- 11. Hours in Reporting Pen. d o
705.93 2544.54 17694.84
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 8.07 8.07 1124.97
- 14. Hours Generator On-Line.
699.75 2481.35 17181.55 0
0 0
- 15. Unit Reserve Shutdown Hours 1357454 5339165 37656076 16.. Gross Thermal Energy Generated (MWH).
443394.8 1815738.6 12787506.06 17.' Gross Electrical Energy Generated (MWH) 416862 1721992 12113632 I
- 18. Net Electrical Energy Generated (MWH) 97.2 37.7 55.2
- 19. Unit Sersice Factor 97.2 37.7.
55.2
- 20. Un:1 A.::, Mit F:: tor 74.0 33.5 49.7 21i Unit Cap.icity Factor (Using MDC Net)
L:
-70.2 31.7 47.1 i
- 22. Unit Capacity Factor (Using DER Net) 0.9 11.4 32.9 f
- 23.. Unit Foued Outage Rate p
24; Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Each):
None N/A
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prios to Commercial Operation):
Forecast Achiesed t
i 1/14/77 INITI A L' CRITICALITY
._ /30/77 1
INITIAL ELECTRICITY 3
- COMM ERCI A L O'PER ATION '
h
.19/77)
+..:.. a.~:
~..
- 0-302 DOCKET NO.._ FLCRP-3 UNIT SilUTDOWNS AND POWI.R REDUCTIONS UNIT N AME _10-6-80 i
DATE.__
__M. W. Culver _
COMPLETED BY (904) 795-6486 September TELEPflONE REPORT MONTJi
)
y.
i
' i; Cause & Corrective i
i c
'E 1.icensee E,-t, f.
Action to P
! "s jY2 l
u?
o3 Present Recurtence
.$ ?
. No.
D.ite y,
3?
l
,5 5 5 Event N0
$0 l
c Report
- O
. l
- 3. @ 5
$5 5
3 M
e j
Y
-~-
Mini maintenance outage - cleaned
)
s condenser waterboxes, put oil in ZZ ZZZZZZ 80-15 800911 S
13.93 B
1 N/A
(@
RCP's, replaced two (2) PI tubes.
@g)
During performance of a survefilance W@)
procedure on RPS Channel "A",
a clip IA INSTRU 80-16l 800930 F
6.32 C
3 N/A Ei lead slipped off and shorted the DC Thxs caused the ICS power supp2y.
to see no RC flow, and so'it ran e -,
The reactor tripped on back FW.
l high RC pressure.
l t
._ t i
i i
L 4
L 3
Exhibit G-Instructiims j
Metimd:
for Preparation of Data 2
1 1 Manual Entry Sheets for Licensee F: Fmeed A-Equipment I ailure(Explain) 2 Manual Scrarn.
Event Report (LER) File (NilRI.G-Reason:
S: Scheduled B Maintenance os Test 3-Automatic Scram.
0161) 4-Other (Explain)
C Refueling D Regulatory ite triction 5
E Operator Ti.umng & License Examination Exhibit 1 Same Source F Administratise G-Op rational I nor (Explain)
Il-Other (Expt.nn e 08/77)
P}
. e
. AVERAGE DAILY UNIT POWER LEVEL :
50-302
.i DOCKET NO.
FLCRP-3 3.lT
- DATE -
t.
COMPLETED BY
.M. W. Culver (904) 795-6486 TELEPHONE September MONTH.
. DAY,
.' AVERAGE DAILY POWER LEVEL DAY-AVER AGE DAILY POWER LEVEL
- (MWe-Net).
(MWe-Net ).
3
~529
.723 37 2
47.4 727 18 3
470 39 750 g
461 769 20 5
21 762 437-754 6
22 7
23' 8.
442 772 24 434 744 9
25 411~
668 10 376 760 1I 27
.157
-752 12 28
.511 773
- 13 y,
468'
.508 g4 yg 15
~
~~~
31
. 16 560-INSTRUC110NS i C-
- On th'is forrnat, list the average daily unit power levelin MWe-Net for each day in the reporting month. Gonpute to
~
the nearest whole megawatt.