ML19338F467

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Sept 1980
ML19338F467
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 10/10/1980
From: William Jones
OMAHA PUBLIC POWER DISTRICT
To: Stello V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML19338F468 List:
References
NUDOCS 8010200400
Download: ML19338F467 (1)


Text

- __

~

l. WN ..h h:-'

LOmaha-Public Power District W.'

1623 ' H ARN E r c e O M A H A. N E B R A S M A* 6 810 2 5 ' TELEPHONE 536 4000 AREA CODE 402 October 10,-1980

= Mr. Victor Stello, Director

- Office of Inspection and Enforcement-

.U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Reference:

' Docket'No. 50-285

Dear Mr. - Stello:

Picase find. enclosed ten '(10) copias of the September Monthly Operating : Report for.;the- Fort Calhoun Station -Unit No. '1. Please note there was a typographical error on the August Monthly Operating Report.- The Cumulative Gross Thermal Energy Generated, item.16 in the Operating Data Report, was -incorrectly' reported as 56,401,725.6-MWH vice-the correct value of. 56,401,775.6 MWH. This error was cor-rected. by telephone with Mr. _ Cintula of the Commission.

Sincerely,.

,[

j W. C Jones Divilon-Manager Production Operations WCJ/KJM/TLP:jmm .

Enclosures

'cc: NRC Regional 0ffice ~

Office'of Management &' Program Analysis (2)

Mr. P..R. Szeker - Westinghouse

.Mr. R.1R. Millsi-iComb~ustion Engineering-

-Nuclear; Safety Analysis-Center

.NRC File-

~

f 4'-

t I

~

!  : ~Y"0k ' 4 W - -

a