05000368/LER-1979-056, Forwards Updated LER 79-056/03X-1

From kanterella
(Redirected from ML19338F111)
Jump to navigation Jump to search
Forwards Updated LER 79-056/03X-1
ML19338F111
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 09/29/1980
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19338F113 List:
References
2-090-34, 2-90-34, NUDOCS 8010070534
Download: ML19338F111 (1)


LER-1979-056, Forwards Updated LER 79-056/03X-1
Event date:
Report date:
3681979056R00 - NRC Website

text

5 ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 UTTLE ROCK, ARKANSAS 72203 (501)3716 September 29, 1980 2-090-34 Mr. K. V. Seyfrit, Directo'r Office of Inspection & Enforcement U. S. Nuclear Regulatory Comm.

Region IV 611 Ryan Plaza Drive, Suite 1000

. Arlington, Texas 76011 Subject: Arkansas Nuclear One-Unit 2 Docket No. 50-368 License No. NPF-6 Licensee Event Report No. 79-056/03X-1 (File:

2-0520)

Gentlemen:

In accordance with Arkansas Nuclear One - Unit 2 Technical Specification 6.9.1.9.C, attached is the subject concerning a surveillance inspection on the Station Batteries not being performed on schedule due to an over-sight. This is an update of a previous report submitted August 2,1980.

Very truly yours,

.OM d-David C. Trimble Manager, Licensing DCT:GAC/sp M

Attachment cc: Mr. Victor Stello, Jr., Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Comm.

Washington, D. C. 20555 Mr. Norman M. Haller, Director Office of Management & Program Analysis U. S. Nuclear Ryulatory Comm.

Washington, D. C. 20555 801007063f MEME>ER MICOLE SOUTH UTILITIES SYSTEM