Forwards IE Insp Rept 50-461/80-14 on 800805-08 & Notice of Violation
ML19338E764
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/20/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML19338E765 List:
References
NUDOCS 8010060103
Download: ML19338E764 (2)


See also: IR 05000461/1980014

Text

. _ _

- ___ ____

_ _ _ _ _

_ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

+*c9# "D'4,o

ll()

UNITED $TATES

'

8

-

  1. ^

NUCLEAR REGULATORY COMMISSION

n

U

.E

REGION ill

$

e

799 ROOSEVELT ROAD

g

k * * * * * j[

GLEN ELLYN, ILLINOIS 60137

IAUG 2 0 8s0'-

Docket No. 50-461

Illinois Power Company

ATTN:

Mr. W. C. Cerstner

Executive Vice President

500 South 27th Street

'

Decatur, IL 62525

l

Gentlemen:

This refers to the inspection conducted by Messrs. H. M. Wescott and

Z. C. Cordero of this office on August 5-8, 1980, of activities at the

Clinton Power Station, Unit 1, authorized by NRC Construction Permit

No. CPPR-137 and to the discussion of our findings with Messrs. L. J. Koch,

J. O. Mchood, J. D. Geier, A. J. Budnik and others of your staff at the

'

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

,

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as described in the enclosed Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Section 2.201 requires you to submit to this office

within thirty days of your receipt of this notice a written statement

or explanation in reply, including for each item of noncompliance:

(1) corrective action taken and the results achieved; (2) corrective

action to be taken to avoid further noncompliance; and (3) the date

when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter,

the enclosures, and your response to this letter will be placed in

the NRC's Public Document Room, except as follows. If the enclosures

contain information that you or your contractors believe to be pro-

prietary, you must apply in writing to this office, within twenty days

of your receipt of this letter, to withhold such information from

public disclosure. The application must include a full statement of

the reasons for which the information is considered proprietary, and

should be prepared so that proprietary information identified in the

application is contained in an enclosure to the application.

,

..

.a

e

r-,m.--m

.-e*-

  • - -

=*n

  • *

._

_

_

_

-

_ _ _ _ - _ _ _ _

.

q us 2 0 G801

5

Illinois Power Company

-2-

We will gladly discuss any questions you have concerning this

inspection.

' Sincerely,

1

Wl

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Report

)

No. 50-461/80-14

i

cc w/ encl:

'

Central Files

Reproduction Unit NRC 20b

PDR

.

,

Local PDR

NSIC

TIC

Mr. Dean Hansell, Office of

Assistant Attorney General

Mr. Gary N. Wright, Chief

Division of Nuclear Safety

4

_____- _. - . . . - _ ~ .

,

j