ML19338E444

From kanterella
Jump to navigation Jump to search
Forwards LER 80-010/03L-0
Date released: 12/18/2019 Download: ML19338E444


LER 80-010/03L-0:on 800827,during Normal Operation,After Redundant Containment Spray Pump Recirculation Phase Suction Valve Maint,Operability Test Was Not Performed.Caused by Personnel Failure to Fully Comprehend Maint Procedures
ML19338E447
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 09/18/1980
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19338E447 (3)
Forwards LER 80-010/03L-0
ML19338E443
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 09/18/1980
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19338E443 (1)